← Back
Two family brick
35-16 CORPORAL STONE ST
QUEENS · BIN 4136519
💬 Discuss this project
1950Year Built
2.25Stories
B1Building Class
R3XZoning
2,789 sfGross Floor Area
2Units
Two family brick · 4,200 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar10p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2022$1.1M—— → —$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC208/06/2024
JOHN C. CHEN ARCHITECT,PLLC408/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor407/08/2026
KJK ELECTRIC INCElectrical103/22/2026
W.JAKE CONSTRUCTION CORPGeneral Contractor107/08/2026
HP SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506208/06/2024
BRIAN ILL DEVELOPMENT LLC1402208/06/2024
JOHN C CHEN ARCHITECT, PL2205208/18/2023
Building Lifecycle
All (51)Filed (6)Permit Issued (4)Signed Off (3)Inspection (8)Special Inspection (30)
08/20/2024
Special inspection requirement — Final
BRIAN ILL
08/20/2024
Special inspection requirement — Permanent certificate
BRIAN ILL
08/20/2024
Special inspection requirement — Structural Steel - Welding
BRIAN ILL
08/20/2024
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
08/20/2024
Special inspection requirement — Fenestration air leakage
BRIAN ILL
08/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/20/2024
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
08/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
08/20/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/20/2024
Special inspection requirement — Insulation placement and R values
BRIAN ILL
08/20/2024
Special inspection requirement — Maintenance information
BRIAN ILL
08/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
BRIAN ILL
08/20/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN ILL
08/20/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
XIAOHONG ZHAO
08/20/2024
Special inspection requirement — Structural Steel - Details
BRIAN ILL
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
08/20/2024
Special inspection requirement — Heating Systems
BRIAN ILL
08/20/2024
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
08/20/2024
Special inspection requirement — Masonry
BRIAN ILL
08/20/2024
Special inspection requirement — Structural Wood Frame
BRIAN ILL
08/20/2024
Special inspection requirement — Footing and Foundation
BRIAN ILL
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/20/2024
Special inspection requirement — Air barrier - visual inspection
BRIAN ILL
08/20/2024
Special inspection requirement — Ventilation and air distribution system
BRIAN ILL
08/20/2024
Special inspection requirement — Interior lighting power
BRIAN ILL
08/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ILL
08/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
EXISTING ONE FAMILY TO TWO FAMILY ENLARGEMENT PER PLANS SUBMITTED TO COMPLY WITH NEW BUILDING REQUIREMENT, OBTAIN NEW C OF O.
Q00820600-P2
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/19/2024
Signed off — Alteration
Q00821693-I1
03/19/2024
Signed off — Alteration
PLUMBING AND STORM DRAINAGE FACILITY WORK, REPLACE, RELOCATE AND INSTALL PLUMBING FIXTURES PER PLANS SHOWN, UNDER ALT.-1 #Q00820600
Q00821706-I1
03/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/17/2024
Signed off — Alteration
INSTALL TEMP CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 #Q00820600
Q00839385-I1
02/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2024
Permit issued — Curb Cut
Q00821693-I1-CC
09/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/06/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/28/2023
Permit issued — Plumbing
Q00821706-I1-PL
08/18/2023
Filed — Alteration
PLUMBING AND STORM DRAINAGE FACILITY WORK, REPLACE, RELOCATE AND INSTALL PLUMBING FIXTURES PER PLANS SHOWN, UNDER ALT.-1 #Q00820600
Q00821706-P1
03/29/2023
Permit issued — Structural
Q00820600-I1-GC-CX
03/23/2023
Filed — Alteration
Q00821693-I1
03/22/2023
Permit issued — Construction Fence
Q00839385-I1-FN
03/16/2023
Filed — Alteration
PLUMBING AND STORM DRAINAGE FACILITY WORK, REPLACE, RELOCATE AND INSTALL PLUMBING FIXTURES PER PLANS SHOWN, UNDER ALT.-1 #Q00820600
Q00821706-I1
03/07/2023
Filed — Alteration
INSTALL TEMP CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 #Q00820600
Q00839385-I1
02/08/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
EXISTING ONE FAMILY TO TWO FAMILY ENLARGEMENT PER PLANS SUBMITTED TO COMPLY WITH NEW BUILDING REQUIREMENT, OBTAIN NEW C OF O.
Q00820600-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offW.JAKE CONSTRUCTION CORP01/09/2024
DOB NOWPlumbingSigned-offHP SERVICES INC08/28/2023
DOB NOWStructuralPermit IssuedL&L CONSTRUCTION DEVELOP03/29/2023
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP03/22/2023
1 project · most recent 08/06/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2024Permit IssuedL&L CONSTRUCTION DEVELOPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-2C20NAHZ4 (BASEMENT) MXZ-4C36NAHZ2 (1ST FL) MXZ-5C42NAHZ2 (2ND FL-A) MXZ-8C48NAHZ2 (2ND FL-B) PUZ-HA36NKA (2ND FL-C) 3 tons · Vrf Outdoor ×4
Heating
Navien NPE-18052 (1ST FL) NCB-250/150H (2ND FL) 140,000 BTU · Boiler ×4
1 project · most recent 01/05/2024
General Wiring
FiledStatusContractorScope
01/05/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/06/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/06/2024Permit IssuedL&L CONSTRUCTION DEVELOPSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
08/20/2024Air barrier — testing BRIAN ILLenergy_progress
08/20/2024HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
08/20/2024Fenestration areasBRIAN ILLenergy_progress
08/20/2024HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/20/2024Construction Operations Influencing Adjacent StructuresBRIAN ILLspecial
08/20/2024Subsurface Conditions – Fill Placement & In-Place DensityXIAOHONG ZHAOspecial
08/20/2024Mechanical SystemsBRIAN ILLspecial
08/20/2024Structural Steel - DetailsBRIAN ILLspecial
08/20/2024Fire-Resistant Penetrations and JointsBRIAN ILLspecial
08/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
08/20/2024Structural Steel - WeldingBRIAN ILLspecial
08/20/2024Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
08/20/2024Heating SystemsBRIAN ILLspecial
08/20/2024Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
08/20/2024Subgrade InspectionsXIAOHONG ZHAOspecial
08/20/2024MasonryBRIAN ILLspecial
08/20/2024Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
08/20/2024Concrete - Cast-In-PlaceBRIAN ILLspecial
08/20/2024FinalBRIAN ILLprogress
08/20/2024Structural Wood FrameBRIAN ILLprogress
08/20/2024Footing and FoundationBRIAN ILLprogress
08/20/2024Energy Code Compliance InspectionsBRIAN ILLprogress
08/20/2024Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/20/2024Air barrier - visual inspectionBRIAN ILLenergy_progress
08/20/2024Insulation placement and R valuesBRIAN ILLenergy_progress
Latest 25 of 70.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00839385-I1Request digital key ↗
08/25/2026Q00821706-P1Request digital key ↗
08/25/2026Q00821706-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/08/2024440772763Open ↗
03/29/2023440772763Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/10/2023440772763Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/10/2023440772763Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00820600-I1Open ↗
08/13/2026Q00820600-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00820600-I1Open ↗
08/13/2026Q00820600-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00820600-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026Q00821706-I1Open ↗
08/28/2026Q00820600-I1Open ↗
08/28/2026Q00820600-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026Q00821706-I1Open ↗
09/27/2026Q00821706-I1Open ↗
09/27/2026Q00821706-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00821706-P1Open ↗
08/25/2026Q00821706-I1Open ↗
08/21/2026Q00820600-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/10/2023440772763Open ↗
03/29/2023440772763Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2023440772763Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00820600-P2Open ↗
08/13/2026Q00820600-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/10/2023440772763Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q00820600-P2Open ↗
08/21/2026Q00820600-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/03/2024440772763Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/03/2024440772763Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/10/2023440772763Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2023440772763Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION5
06/03/2024440772763Open ↗
06/03/2024440772763Open ↗
06/03/2024440772763Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification2
08/21/2026Q00820600-I1Open ↗
08/21/2026Q00820600-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00820600-I1Open ↗
08/13/2026Q00820600-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00820600-I1Open ↗
08/13/2026Q00820600-P2Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/10/2023440772763Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00820600-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00820600-I1Open ↗