ECB09/08/2026AT TIME OF INSPECTION, GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION# 39553241Y ISSUED ON 04/21/2026 FOR FAILURE TO PROVIDE ROOF PROTECTION ON ADJACENT PROPERTY AT EXP# 2. ADDITION$1K due
ECB09/08/2026AT TIME OF INSPECTION, GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION# 39553242X ISSUED ON 04/21/2026 FOR FAILING TO PROVIDE HANDRAILS IN THE STAIRWAYS FROM THE SECOND FLOOR TO THE$1K due
ECB06/26/2026AT TIME OF INSPECTION, GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION# 39553243H.$1K due
ECB06/10/2026ACTIVE 5STORY NB. OBSERVED ACTIVE WORK WHILE ON NOTICE OF SWO #4A32295 ISSUED ON 4/21/26. AS PER SWO; NO WORK WAS ALLOWED ON PIPE SCAFFOLD, NO EXTERIOR WORK, NO FACADE WORK. ATOI NOTED ACTIVE WORK ON EXTERIOR F$10K due
ECB06/10/20263301.13.7 ACTIVE 5STORY NB WITH NUMEROUS VIOLATING & HAZARDOUS CONDITIONS: ACTIVE WORK WHILE ON NOTICE OF PSWO, SWS CONTRARY TO PLANS, MISSING MANY REQUIRED DOCUMENTS, FIRE EXTINGUISHERS NOT MAINTAINED. CS#0206$3K due
ECB06/10/2026ACTIVE 5STORY NB. DURING INSPECTION NOTED THAT SITE WAS MISSING MANY DOCUMENTS REQUIRED TO BE MAINTAINED ON SITE. UPON REQUEST TO THE COMPETENT PERSON; NO SUPPORTED SCAFFOLD PLANS, NO LOAD IMPOSED LETTER FOR SF$1K due
ECB06/10/2026ACTIVE 5STORY NB. SWS CONDITIONS AT EXP3 IN THE REAR YARD WERE NOT CONFORMING TO SWS PLANS PGEQ-100 AS SEEN ON DOBRECORDS. SECTION OF SWS @EXP3 WAS SHOWN ON PLANS, HOWEVER WAS MISSING ON SITE. OHP/SWS WAS INSTA$1K due
ECB06/10/2026ACTIVE 5STORY NB. OBSERVED FIRE EXTINGUISHERS WERE INADEQUATELY MAINTAINED ON SITE THROUGHOUT SEVERAL FLOORS. SOME FLOORS HAD NO FIRE EXTINGUISHERS READILY AVAILABLE FOR USE IN CASE OF EMERGENCY. NOTED FLOORS W$655 due
ECB04/21/2026BC 3314.1 5-STORY BUILDING ACTIVE JOB SITE, PIPE SCAFFOLDS AT EXP# 1, 3, 4, AND ROOF LEVEL WERE NOT MAINTAINED, WITH LOOSE PLANKING, MISSING PINS, AND DEBRIS NETTING NOT SECURED TO THE FACADE. THIS CONDITION IS$2K due
ECB04/21/2026AT THE TIME OF INSPECTION OF A 5-STORY BUILDING ACTIVE JOB SITE, AT EXP# 2, ROOF PROTECTION WAS NOT PROVIDED. ADDITIONALLY, OVERHEAD PROTECTION AT THE REAR YARD WAS MISSING. THIS CONDITION CREATES A HAZARD TO T$10K due
ECB04/21/2026AT THE TIME OF INSPECTION OF A 5-STORY BUILDING ACTIVE JOB SITE, THE STAIRWAY FROM THE SECOND FLOOR TO THE BASEMENT & AT THE REAR YARD LACKED A REQUIRED HANDRAIL. THIS CONDITION CREATES A HAZARD TO WORKERS AND$2K due
ECB04/21/20265-STORY BUILDING ACTIVE JOB SITE, AN INADEQUATE GUARDRAIL SYSTEM WAS OBSERVED THROUGHOUT THE BUILDING FROM THE SECOND FLOOR TO THE ROOF LEVEL, INCLUDING AT WINDOW OPENINGS, ELEVATOR SHAFT, AND ROOF AREAS. THIS$25K due
ECB04/16/20263301.5 CLOSED 5STORY NB; JOBSITE FENCE INSTALLED ON SITE NOT MAINTAINED PER CODE. FENCE DISLODGED/LEAING INTO PUBLIC WAY, NOTED PROTRUDING NAILS CAN INJURE PEDESTRIANS, PEELING WOOD IS CREATING SHARP EDGES, NOT$2K due
ECB02/11/2026OBSERVED CLOSED 5STORY NB. ICY/SNOW CONDITIONS WERE OBSERVED ON PEDESTRIAN WALKWAY @ CORNER OF EXPO1&4, CREATING SLIP/FALL HAZARDS FOR PEDESTRIANS. SNOW/ICY CONDITIONS HAVE NOT BEEN CLEARED IN ORDER TO MAINTAIN$5K due
ECB02/11/20263301.5 CLOSED 5STORY NB; JOBSITE FENCE INSTALLED ON SITE NOT MAINTAINED PER CODE. FENCE DISLODGED/LEANING INTO PUBLIC WAY, NOTED PROTRUDING NAILS CAN INJURE PEDESTRIANS, PEELING WOOD IS CREATING SHARP EDGES, NO$5K due
ECB12/30/2025PROPOSED 5 STORY BUILDING . OBSERVED : SWS INSTALLED IN THE STREET & ROADWAY CONTRARY TO PLANS & WITHOUT HIGH VISIBILITY MARKS & OUTRIGGERS EXPOSURE 4 SIDE OF CARLTON PLACE CONTRARY TO BUILDING CODE STOP ALL W$1K due
ECB12/30/2025PROPOSED 5 STORY NB . UPON RESEARCH FOR DOT PERMIT WAS NOTED NO ANY PERMIT WAS ISSUED FOR USE OF SIDE WALK AND ROAD WAY OF CARLTON PL .,FAILURE TO COMPLY WITH DOT REGULATIONS OCCUPANCY OF THE ROAD WAY AND SIDE$10K due
ECB06/25/2026RESPONDENT FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITION(S) AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-204.2.Hearing held — result not yet published$1K proposed