← Back
Two stories - detached, small or mid-size
35-22 210 STREET
QUEENS · BIN 4136331
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
2,277 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/12/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/12/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
07/24/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 20 modules, 8.6kw
Q01223647-I1
05/14/2025
Permit issued — Solar
Q01223647-I1-SL
05/12/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 20 modules, 8.6kw
Q01223647-I1
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/09/2025
Special inspection requirement — Final
Mina Makar
05/09/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
11/08/2008
Violation issued (ECB, closed)
Construction
09/28/2007
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/14/2025
BISPLISSUEDFOUR POINTS P & H CORP10/02/2007
BISEQISSUEDARMA RENOVATIONS CORP08/28/2007
BIS—ISSUEDARMA RENOVATIONS CORP.08/21/2007
1 project · most recent 05/12/2025
FiledStatusContractorScope
05/12/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/09/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/09/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/09/2025Energy Code Compliance InspectionsMina Makarprogress
05/09/2025FinalMina Makarprogress
05/09/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01223647-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01223647-I1Open ↗
08/25/2026Q01223647-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01223647-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01223647-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01223647-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01223647-I1Open ↗