← Back
Two family brick
35-27 90 STREET
QUEENS · BIN 4036008
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5Zoning
2,352 sfGross Floor Area
2Units
5 Open Violations 4 unresolved · 1 paperwork only ▸
Two family brick · 2,500 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 5 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABEJA ENGINEERING PLLC306/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN PROCURE BUILD LLCGeneral Contractor203/21/2026
COD PLUMBING CORPPlumbing207/08/2026
GLENNS PLUMBING SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269306/30/2024
Building Lifecycle
All (29)Filed (3)Permit Issued (4)Signed Off (2)Violation (12)Inspection (4)Special Inspection (4)
11/26/2025
Signed off — Alteration
FILING TO CAP AND REMOVE 3 PCE BTHRM, RES SINK,AND GAS LINE FOR STOVE AT ATTIC TO COMPLY WITH VIO #35567027P,35564295H,35536264R,35378226R,35378525P, & 35481863N. FILED IN CONJ WITH CONST PLANS JOB #Q007695. ALSO REPLACED 60' OF 3/4" GAS LINE -CEL TO 2ND
Q00769528-I1
10/28/2025
Permit issued — Plumbing
Q00769528-I1-PL
11/18/2024
Signed off — Alteration
REMOVE ILLEGAL PARTITIONS IN ATTIC TO COMPY WITH ECB VIOLATION #'S 35567027P, 35564295H, 35536264R, 35378226R, 35378525P, AND 35481863N. BEING FILED IN CONJUNCTION WITH PLUMBING JOB #Q00769528.
Q00769521-I1
07/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
06/30/2024
Filed — Alteration
FILING TO CAP AND REMOVE 3 PCE BTHRM, RES SINK,AND GAS LINE FOR STOVE AT ATTIC TO COMPLY WITH VIO #35567027P,35564295H,35536264R,35378226R,35378525P, & 35481863N. FILED IN CONJ WITH CONST PLANS JOB #Q007695. ALSO REPLACED 60' OF 3/4" GAS LINE -CEL TO 2ND
Q00769528-P1
06/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
06/05/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2024
Permit issued — Plumbing
Q24134583-I1-PL
12/16/2022
Permit issued — Plumbing
Q00769528-I1-PL
10/05/2022
Permit issued — General Construction
Q00769521-I1-GC
07/29/2022
Filed — Alteration
FILING TO CAP AND REMOVE 3 PCE BTHRM, RES SINK,AND GAS LINE FOR STOVE AT ATTIC TO COMPLY WITH VIO #35567027P,35564295H,35536264R,35378226R,35378525P, & 35481863N. FILED IN CONJ WITH CONST PLANS JOB #Q007695. ALSO REPLACED 60' OF 3/4" GAS LINE -CEL TO 2ND
Q00769528-I1
07/29/2022
Filed — Alteration
REMOVE ILLEGAL PARTITIONS IN ATTIC TO COMPY WITH ECB VIOLATION #'S 35567027P, 35564295H, 35536264R, 35378226R, 35378525P, AND 35481863N. BEING FILED IN CONJUNCTION WITH PLUMBING JOB #Q00769528.
Q00769521-I1
07/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
07/05/2022
Special inspection requirement — Final
JOHANN VELEZ
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2022
Violation issued (ECB, closed)
Construction
12/08/2021
Violation issued (ECB, open)
Construction
11/18/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Violation issued (ECB, closed)
Construction
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/05/2021
Violation issued (ECB, closed)
Unknown
05/05/2021
Violation issued (ECB, closed)
Construction
04/27/2021
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
04/08/2021
Violation issued (HPD, open)
B
04/08/2021
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN10/28/2025
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN05/16/2024
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC12/16/2022
DOB NOWGeneral ConstructionSigned-offDESIGN PROCURE BUILD10/05/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/01/2024Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
06/10/2024Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/05/2022Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/05/2022FinalJOHANN VELEZprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00769528-P1Request digital key ↗
08/26/2026Q00769528-I1Request digital key ↗
08/26/2026Q00769521-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00769528-I1Open ↗
08/26/2026Q00769521-I1Open ↗
08/13/2026Q00769528-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026Q00769528-P1Open ↗
08/26/2026Q00769521-I1Open ↗
08/23/2026Q00769528-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q00769521-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00769528-I1Open ↗
08/26/2026Q00769521-I1Open ↗
08/13/2026Q00769528-P1Open ↗