35-29 162 STREET
QUEENS · BIN 4119469
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R1-2AZoning
1,984 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 10 docs
Floor 2Under Construction24p · 3 filings · 20 docs
Floor 1Under Construction19p · 1 filing · 20 docs
CellarUnder Construction23p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2016$1.1M—— → —$570/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC906/02/2026
SQUARE ARCH, LLC209/08/2025
TAN ARCHITECT P.C205/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC1603/21/2026
AMERGY SOLAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor2107/08/2026
STREAM ROCK CONTSRUCTION*General Contractor204/09/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRISE CONTRACTING GROUP,8228306/02/2026
SQ. ARCH, LLC4802209/08/2025
AMERILAND BROOK LLC1506106/30/2024
Building Lifecycle
All (96)Filed (13)Permit Issued (13)Signed Off (3)Inspection (9)Objection (28)Special Inspection (30)
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
FILE PL WORKTYPE INCONJUNCTION WITH JOB#Q01074394-I1
Q01074394-S3
06/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
FILE PL WORKTYPE INCONJUNCTION WITH JOB#Q01074394-I1
Q01074394-S2
06/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE PL WORKTYPE INCONJUNCTION WITH JOB#Q01074394-I1
Q01074394-P1
04/27/2026
Special inspection requirement — Metering
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Mechanical Systems
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Insulation placement and R values
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Fenestration air leakage
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Fenestration areas
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Maintenance information
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Electric vehicle service equipment requirements
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Interior lighting power
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Ventilation and air distribution system
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Air barrier — testing
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Heating Systems
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Permanent certificate
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Chimneys and vents
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT ERVOLINA
04/27/2026
Special inspection requirement — Final
ROBERT ERVOLINA
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2026
Permit issued — Mechanical Systems
Q01074394-I1-GC
02/17/2026
Permit issued — Construction Fence
Q01074394-S3-FN
09/09/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01204292-I1
09/08/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01204292-P1
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
09/08/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
09/08/2025
Special inspection requirement — Final
Chun Feng
09/04/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
05/14/2025
Permit issued — Foundation
Q01074394-S1-GC
05/14/2025
Permit issued — Construction Fence
Q01074394-S3-FN
05/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2025
Permit issued — Solar
Q01204292-I1-SL
04/18/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01204292-I1
03/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSTREAM ROCK CONTSRUCTION*03/02/2026
DOB NOWConstruction FenceSigned-offSTREAM ROCK CONTSRUCTION*02/17/2026
DOB NOWFoundationPermit IssuedTHC CONSTRUCTION INC05/14/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC05/14/2025
DOB NOWSolarSigned-offAMERGY SOLAR INC04/22/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG12/31/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC12/09/2024
DOB NOWEarth WorkPermit IssuedTHC CONSTRUCTION INC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC12/09/2024
DOB NOWFoundationPermit IssuedTHC CONSTRUCTION INC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC12/09/2024
DOB NOWSupport of ExcavationSigned-offTHC CONSTRUCTION INC12/06/2024
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC11/04/2024
1 project · most recent 06/02/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 48,000 BTU · Electric Heater ×1
1 project · most recent 04/02/2024
Sprinkler System
FiledStatusContractorScope
04/02/2024——Sprinkler System
3 projects · most recent 06/02/2026
Storm Water/Sanitary Plumbing-Sprinkler Gas
FiledStatusContractorScope
06/02/2026Signed-offWATSON'S PLBG, HTG, & BDGStorm, Water/Sanitary
04/02/2024——Plumbing-Sprinkler, Storm, Water/Sanitary
05/27/2022——Gas, Storm, Water/Sanitary
2 projects · most recent 04/16/2025
General Wiring
FiledStatusContractorScope
04/16/2025CompleteI.P. ELECTRIC INC—
01/02/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
04/27/2026Fire-Resistant Penetrations and JointsROBERT ERVOLINAspecial
04/27/2026Chimneys and ventsROBERT ERVOLINAspecial
04/27/2026Fenestration and door U-factor and product ratingsROBERT ERVOLINAenergy_progress
04/27/2026Duct leakage testing, insulation and designROBERT ERVOLINAenergy_progress
04/27/2026Fenestration air leakageROBERT ERVOLINAenergy_progress
04/27/2026Interior lighting powerROBERT ERVOLINAenergy_progress
04/27/2026Ventilation and air distribution systemROBERT ERVOLINAenergy_progress
04/27/2026Insulation placement and R valuesROBERT ERVOLINAenergy_progress
04/27/2026Fenestration areasROBERT ERVOLINAenergy_progress
04/27/2026Air barrier — testing ROBERT ERVOLINAenergy_progress
04/27/2026HVAC-R and service water piping design and insulationROBERT ERVOLINAenergy_progress
04/27/2026Permanent certificateROBERT ERVOLINAenergy_progress
04/27/2026Electric vehicle service equipment requirementsROBERT ERVOLINAenergy_progress
04/27/2026HVAC-R and service water heating system controlsROBERT ERVOLINAenergy_progress
04/27/2026Air barrier - visual inspectionROBERT ERVOLINAenergy_progress
04/27/2026Maintenance informationROBERT ERVOLINAenergy_progress
04/27/2026HVAC-R and service water heating equipmentROBERT ERVOLINAenergy_progress
04/27/2026MeteringROBERT ERVOLINAenergy_progress
04/27/2026Fire-Resistance Rated ConstructionROBERT ERVOLINAprogress
04/27/2026FinalROBERT ERVOLINAprogress
04/27/2026Energy Code Compliance InspectionsROBERT ERVOLINAprogress
04/27/2026Structural Stability – Alterations of existing buildingsROBERT ERVOLINAspecial
04/27/2026Mechanical SystemsROBERT ERVOLINAspecial
04/27/2026Heating SystemsROBERT ERVOLINAspecial
09/08/2025Energy Code Compliance InspectionsChun Fengprogress
Latest 25 of 102.
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026Q00745911-I1Request digital key ↗
08/23/2026Q00981970-I1Request digital key ↗
08/23/2026Q00981970-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
09/19/2024440818518Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/19/2024440818518Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026Q01074394-I1Open ↗
08/14/2026Q01074394-P1Open ↗
08/13/2026Q00981970-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026Q01074394-I1Open ↗
08/13/2026Q00655477-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026Q01074394-P1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWProgress Inspector Seal & Signature44
08/29/2026Q01204292-P1Open ↗
08/29/2026Q01204292-P1Open ↗
08/29/2026Q01204292-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
08/29/2026Q01204292-P1Open ↗
08/29/2026Q01204292-P1Open ↗
08/26/2026Q01074394-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/19/2026Q01204292-I1Open ↗
08/16/2026Q01074394-I1Open ↗
08/16/2026Q01074394-S2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2024440818518Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2024440818518Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/16/2026Q01074394-I1Open ↗
08/16/2026Q01074394-S1Open ↗
08/14/2026Q01074394-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
09/19/2024440818518Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00655477-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00655477-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026Q01074394-S1Open ↗
08/16/2026Q01074394-S4Open ↗
08/16/2026Q01074394-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026Q01074394-S1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026Q01074394-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01204292-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2024440818518Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/19/2024440818518Open ↗
▸Other Documents19
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/16/2026Q01074394-I1Open ↗
08/16/2026Q01074394-S1Open ↗
08/14/2026Q01074394-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/16/2026Q01074394-S1Open ↗
08/16/2026Q01074394-I1Open ↗
08/14/2026Q01074394-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/16/2026Q01074394-I1Open ↗
08/14/2026Q01074394-P1Open ↗
08/13/2026Q00655477-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/16/2026Q01074394-S1Open ↗
08/13/2026Q00981970-I1Open ↗
08/13/2026Q01074394-S2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/19/2024440818518Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00655477-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00655477-I1Open ↗