Seventh Day Adventist Church
35-30 103RD STREET · Name © OpenStreetMap contributors · BIN 4043320
💬 Discuss this project
1925Year Built
3Stories
M1Building Class
R5Zoning
8,064 sfGross Floor Area
0Units
0 Active Violations 1 likely answered ▸
Church, synagogue, chapel · Owner of record: Northeast 7 Day Adven · 5,500 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSeventh Day Adventist Church5p · 1 filing · 10 docs
Floor 1Seventh Day Adventist Church6p · 2 filings · 12 docs
CellarCorona 7th Day Adv Church, Seventh Day Adventist Church10p · 2 filings · 15 docs
Site & exteriorSeventh Day Adventist Church4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Corona Sda Church903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC Engineering508/14/2025
Costa Arch & Engineering102/26/2021
Green Design211/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH Cornerstone Design503/21/2026
Atlantic Building Supply403/21/2026
Costa203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Paramount PipingPlumbing407/08/2026
You and US AirconditioninGeneral Contractor303/21/2026
G.N. ConstructionScaffold207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Beyond Arch3600308/14/2025
Costa Architects & Engineering1321102/26/2021
Building Lifecycle
All (59)Filed (8)Permit Issued (7)Violation (6)Inspection (7)Objection (8)Special Inspection (23)
06/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/03/2025
Permit issued — Boiler Equipment
Q01075813-S1-BE
10/03/2025
Permit issued — Plumbing
Q01075813-I1-PL
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
09/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
09/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
09/12/2025
Special inspection requirement — Maintenance information
Hackjong Choi
08/14/2025
Filed — Alteration
installation of combi boilers on cellar floor
Q01075813-P3
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
07/31/2025
Special inspection requirement — Maintenance information
Hackjong Choi
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
07/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2025
Filed — Alteration
installation of combi boilers on cellar floor
Q01075813-P2
06/11/2025
Filed — Alteration
installation of combi boilers on cellar floor
Q01075813-P1
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
06/10/2025
Special inspection requirement — Maintenance information
Hackjong Choi
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
04/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/11/2024
Permit issued — Boiler Equipment
Q01075813-S1-BE
09/10/2024
Permit issued — Plumbing
Q01075813-I1-PL
08/22/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/12/2024
Objection raised — Other
07/12/2024
Objection raised — Inspections
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Fire_Protection
07/03/2024
Filed — Alteration
installation of combi boilers on cellar floor
Q01075813-I1
07/03/2024
Filed — Alteration
installation of combi boilers on cellar floor
Q01075813-S1
07/21/2021
Permit issued — Mechanical Systems
Q00476621-I1-MS
02/26/2021
Filed — Alteration
Q00476621-I1
02/25/2021
Special inspection requirement — Maintenance information
Paul Antonio
02/25/2021
Special inspection requirement — Permanent certificate
Paul Antonio
02/25/2021
Special inspection requirement — HVAC-R and service water heating equipment
Paul Antonio
02/25/2021
Special inspection requirement — HVAC-R and service water heating system controls
Paul Antonio
02/25/2021
Special inspection requirement — Final
Paul Antonio
02/25/2021
Special inspection requirement — Energy Code Compliance Inspections
Paul Antonio
02/25/2021
Special inspection requirement — Heating Systems
Paul Antonio
02/25/2021
Special inspection requirement — Mechanical Systems
Paul Antonio
11/21/2019
Permit issued — Supported Scaffold
Q00269338-I1-SF
11/20/2019
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00269338-I1
11/06/2019
Permit issued — Sidewalk Shed
Q00258650-I1-SH
11/04/2019
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL
Q00258650-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSurpass Plumbing & Heating10/03/2025
DOB NOWPlumbingPermit IssuedSurpass Plumbing & Heating10/03/2025
DOB NOWBoiler EquipmentSigned-offSurpass Plumbing & Heating09/11/2024
DOB NOWPlumbingPermit IssuedSurpass Plumbing & Heating09/10/2024
DOB NOWMechanical SystemsPermit IssuedYou and US Airconditionin07/21/2021
DOB NOWSupported ScaffoldPermit IssuedEmpire Construction Associates11/21/2019
DOB NOWSidewalk ShedPermit IssuedEmpire Construction Associates11/06/2019
BISEQISSUEDS.N.A. Construction07/11/2013
BISEQISSUEDS.N.A. Construction07/11/2013
BISOTISSUEDS.N.A. Construction07/01/2013
BIS—ISSUEDN/A04/05/2010
BISOTISSUEDA-Mac of New York Construction03/22/2010
BISOTISSUEDHBD Associates11/19/2004
BISMHISSUEDCorona Sda Church05/04/1992
1 project · most recent 02/26/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2021Permit IssuedYou and US AirconditioninAir Conditioning Systems, Heating Systems
Cooling
Fujitsu ASU9RLF1 30,000 BTU · Split System ×2
ASU12RLF1 24,000 BTU · Split System ×1
ASU7RLF1 1,800 BTU · Split System ×1
LXN023325 36,000 BTU · Split System ×1
Luxaire AP60CX21B 24,000 BTU · Split System ×1
W1D7599768 56,000 BTU · Split System ×1
Heating
Fantech MUAS 750-MUAH-10/12 750 CFM · Makeup Air ×1
1 project · most recent 08/14/2025
Gas
FiledStatusContractorScope
08/14/2025Permit IssuedParamount PipingGas
2 projects · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024CompleteInfiniti ElectricGeneral Wiring
11/04/2019Permit IssuedRichard Neu—
1 project · most recent 11/04/2019
Sidewalk Shed
FiledStatusContractorScope
11/04/2019Permit IssuedG.N. ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/12/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
09/12/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
09/12/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
09/12/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
09/12/2025Maintenance informationHackjong Choienergy_progress
07/31/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
07/31/2025Maintenance informationHackjong Choienergy_progress
07/31/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
07/31/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
07/31/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
06/10/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
06/10/2025Maintenance informationHackjong Choienergy_progress
06/10/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
06/10/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
06/10/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
02/25/2021Maintenance informationPaul Antonioenergy_progress
02/25/2021Permanent certificatePaul Antonioenergy_progress
02/25/2021HVAC-R and service water heating equipmentPaul Antonioenergy_progress
02/25/2021HVAC-R and service water heating system controlsPaul Antonioenergy_progress
02/25/2021FinalPaul Antonioprogress
02/25/2021Energy Code Compliance InspectionsPaul Antonioprogress
02/25/2021Heating SystemsPaul Antoniospecial
02/25/2021Mechanical SystemsPaul Antoniospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Corona 7th Day Adv ChurchReligiousCellar
Project Q01075813 Alteration · Permit Entire · 07/03/2024
Seventh Day Adventist ChurchReligiousCellar, Floor 1, Roof
Project Q00476621 Alteration · Permit Entire · 02/26/2021
Project Q00269338 Alteration · Permit Entire · 11/20/2019
Project Q00258650 Alteration · Permit Entire · 11/04/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/27/2026Q00476621-I1Request digital key ↗
08/19/2026Q01075813-S1Request digital key ↗
08/19/2026Q01075813-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00258650-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00269338-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00476621-I1Request digital key ↗
▸Applications & Permits24
▸BISPLACE OF ASSEMBLY8
06/03/2014410190476Open ↗
05/19/2014410190476Open ↗
04/03/2014410190476Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
07/12/2013420864960Open ↗
07/12/2013420864979Open ↗
06/26/2013420849764Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
07/18/2013420864979Open ↗
07/16/2013420864960Open ↗
07/08/2013420849764Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
06/03/2014410190476Open ↗
04/27/2011410198058Open ↗
04/27/2011410198058Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/08/2010410119394Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/03/2013420849764Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
10/19/2010410119394Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
06/03/2014410190476Open ↗
12/03/2013420849764Open ↗
11/14/2013420864979Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026Q01075813-S1Open ↗
08/27/2026Q00476621-I1Open ↗
08/27/2026Q00476621-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00258650-I1Open ↗
08/28/2026Q00269338-I1Open ↗
08/27/2026Q00476621-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q01075813-S1Open ↗
08/27/2026Q00476621-I1Open ↗
08/27/2026Q00476621-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/18/2013420864979Open ↗
07/16/2013420864960Open ↗
06/26/2013420849764Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/18/2013420864979Open ↗
07/16/2013420864960Open ↗
06/27/2013420849764Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION1
06/03/2014410190476Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
05/02/2011410190476Open ↗
▸Safety & Tenant Protection1
▸BISST-1: Street Tree Checklist1
08/21/2008410119394Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026Q01075813-I1Open ↗
08/19/2026Q01075813-P2Open ↗
08/19/2026Q01075813-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/16/2013420864960Open ↗
06/26/2013420849764Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/11/2010420125359Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/03/2013420849764Open ↗
06/27/2013420849764Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/03/2013420849764Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/28/2026Q00258650-I1Open ↗
08/28/2026Q00269338-I1Open ↗
08/13/2026Q01075813-P2Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
07/12/2013420864960Open ↗
07/12/2013420864979Open ↗
06/27/2013420849764Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/14/2013420864979Open ↗
10/29/2013420864960Open ↗
07/19/2011410190476Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/03/2013420849764Open ↗
11/14/2013420864979Open ↗
10/29/2013420864960Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
10/19/2010410119394Open ↗
04/05/2010410119394Open ↗
06/04/2008410119394Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/03/2013420849764Open ↗
06/27/2013420849764Open ↗
10/19/2010410119394Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
07/12/2013420864960Open ↗
07/12/2013420864979Open ↗
06/26/2013420849764Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
10/19/2010410119394Open ↗
10/14/2009410198058Open ↗
10/14/2009410190476Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISPLOT DIAGRAM1
06/04/2008410119394Open ↗