← Back
BuildNYC
Elevator apt, fireproof with stores
Northern 146 Condominium
35-30 146TH STREET · BIN 4624519
💬 Discuss this project
2024Year Built
1Stories
D6Building Class
R6Zoning
75,078 sfGross Floor Area
46Units
0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: Flushing Northern · 10,000 sf lot · 7.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof85p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 7Mgs LLC194p · 2 filings · 20 docs
Floor 6Unit 6C194p · 1 filing · 20 docs
Floor 5193p · 1 filing · 20 docs
Floor 4194p · 1 filing · 20 docs
Floor 3194p · 1 filing · 20 docs
Floor 2195p · 1 filing · 20 docs
Floor 1NORTHERN BLVD. DEVT. 12' CURB CUT196p · 2 filings · 20 docs
Cellar197p · 1 filing · 20 docs
Sub-Cellar86p · 1 filing · 20 docs
Site & exteriorSidewalk shed and pipe scaffolding installation219p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MGS Associates307/08/2026
State Farm Insurance203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2015$9.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Raymond Chan Architect1402/04/2026
Tan Engineering612/03/2025
Just Consulting Engineering510/31/2025
Building105/08/2025
Ashraf504/07/2025
Lombardo Professional Engineering102/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Raymond Chan Architect4003/21/2026
Building203/21/2026
Platinum Services NY403/21/2026
Royal Expediting303/21/2026
Lombardo Building Consultants103/21/2026
Green House Town1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Green House TownGeneral Contractor1304/09/2026
Platinum Services NYScaffold807/08/2026
Lis Piping SolutionFire Protection407/08/2026
Green House TownScaffold307/08/2026
Stream PlumbingPlumbing207/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
QMB Plumbing & HeatingPlumbing107/08/2026
WCK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Just Consulting Engineering58651902/04/2026
Building Lifecycle
All (160)Filed (32)Permit Issued (24)Signed Off (12)Violation (17)Inspection (15)Objection (30)Special Inspection (30)
06/24/2026
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-I1
03/13/2026
Special inspection requirement — Lighting in dwelling units
XIAOJUN WANG
03/13/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
03/13/2026
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
03/13/2026
Special inspection requirement — Maintenance information
XIAOJUN WANG
03/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
03/13/2026
Special inspection requirement — Electrical motors and elevators
XIAOJUN WANG
03/13/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
03/13/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
03/13/2026
Special inspection requirement — Metering
XIAOJUN WANG
03/13/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
03/13/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
03/13/2026
Special inspection requirement — Vestibules
XIAOJUN WANG
03/13/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
03/13/2026
Special inspection requirement — Air barrier continuity plan testing
XIAOJUN WANG
03/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
03/13/2026
Special inspection requirement — Lighting controls
XIAOJUN WANG
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/05/2026
Objection raised — Scope
03/05/2026
Objection raised — Admin
02/10/2026
Signed off — Alteration
Propose 22 feet curb cut includes (2) 1'-6" splays in conjunction with NB# Q08049391
Q00911472-I1
02/09/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/06/2026
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-S1
02/04/2026
Filed — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-A8
01/30/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
01/30/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
01/30/2026
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
01/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
01/30/2026
Special inspection requirement — Vestibules
XIAOJUN WANG
01/30/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
01/30/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
01/30/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
01/30/2026
Special inspection requirement — Metering
XIAOJUN WANG
01/30/2026
Special inspection requirement — Electrical motors and elevators
XIAOJUN WANG
01/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/24/2025
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-S5
12/05/2025
Objection resolved — Addressed
12/03/2025
Filed — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-A6
12/02/2025
Filed — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-A7
11/30/2025
Objection raised — Energy
11/25/2025
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-S4
11/24/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/21/2025
Filed — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-A5
11/19/2025
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-S8
11/19/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
11/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
11/13/2025
Permit issued — Curb Cut
Q00911472-I1-CC
11/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/13/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/12/2025
Signed off — New Building
FILE PL/SP/SD work types in conjunction with NB # Q08049391-I1
Q08049391-S6
Latest 60 of 160 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offGreen House Town11/13/2025
DOB NOWSprinklersSigned-offLis Piping Solution06/05/2025
DOB NOWStandpipeSigned-offLis Piping Solution06/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offGreen House Town05/23/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/15/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/15/2025
DOB NOWMechanical SystemsSigned-offGreen House Town03/13/2025
DOB NOWConstruction FenceSigned-offGreen House Town03/04/2025
DOB NOWPlumbingSigned-offStream Plumbing02/18/2025
DOB NOWSuspended ScaffoldPermit IssuedSkytrac Access Group02/06/2025
DOB NOWGeneral ConstructionPermit IssuedGreen House Town02/05/2025
DOB NOWPlumbingSigned-offQMB Plumbing & Heating09/17/2024
DOB NOWGeneral ConstructionPermit IssuedGreen House Town09/09/2024
DOB NOWSprinklersSigned-offLis Piping Solution06/04/2024
DOB NOWStandpipeSigned-offLis Piping Solution06/04/2024
DOB NOWGeneral ConstructionPermit IssuedGreen House Town05/09/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/01/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY05/01/2024
DOB NOWStructuralSigned-offGreen House Town04/09/2024
DOB NOWConstruction FenceSigned-offGreen House Town03/01/2024
DOB NOWPlumbingSigned-offStream Plumbing02/28/2024
DOB NOWFoundationSigned-offGreen House Town02/20/2024
DOB NOWSupport of ExcavationSigned-offGreen House Town02/06/2024
DOB NOWSupport of ExcavationSigned-offGreen House Town01/23/2024
BIS—ISSUEDGreen House Town12/14/2023
BISOTISSUEDPlus K Construction02/08/2019
BISPLISSUEDTri State Plumbing & Heating06/02/2017
BISOTISSUEDKTC Design Group06/02/2017
BISEQISSUEDBilly Enterprises08/17/2016
BISOTISSUEDTower Awning & Sign02/17/2006
BISPLISSUEDC.R.U. Mechan & Heating06/09/2005
BISBLISSUEDC.R.U. Mechan & Heating06/09/2005
BISMHISSUEDMindo Construction05/05/2005
BISEQISSUEDMindo Construction05/05/2005
BISOTISSUEDNova Plumbing & Heating07/07/2000
BISPLISSUEDAvon Plumbing & Heating07/07/2000
1 project · most recent 02/04/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2026Signed-offGreen House TownAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×88
MXZ-SM48NAM2-U1 48,000 BTU · Heat Pump Outdoor ×4
MXZ-SM96TAM-U1 96,000 BTU · Heat Pump Outdoor ×4
MUZ-GL12NA 12,000 BTU · Heat Pump Outdoor ×2
MUZWR12NA 12,000 BTU · Heat Pump Outdoor ×2
MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×2
PUZ-A24NHA7 24,000 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck G-140-VG 800 CFM · Kitchen Exhaust ×8
G-100-VG 400 CFM · Kitchen Exhaust ×6
SQ-140-VG 2,400 CFM · Makeup Air ×4
SQ-160-VG 4,320 CFM · Makeup Air ×4
CSP-A300VG 1,200 CFM · Makeup Air ×2
CSP-A510-VG 400 CFM · Exhaust Fan ×2
CSP-A510VG 500 CFM · Exhaust Fan ×2
SQ-97-VG 100 CFM · Exhaust Fan ×2
Energywall ENERGY WALL U-ERV-COIL-1200 41,600 BTU · Erv ×2
ENERGY WALL U-ERV-COIL-1800 54,100 BTU · Erv ×2
Panasonic FV-0511VF-1 80 CFM · Exhaust Fan ×2
Tjernlund CDB8 1,200 CFM ×2
1 project · most recent 02/04/2026
Sprinkler System
FiledStatusContractorScope
02/04/2026Signed-offLis Piping SolutionSprinkler System
1 project · most recent 02/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/04/2026Signed-offStream PlumbingStorm, Water/Sanitary
7 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteAL-Lectric Elect'l Contracting—
02/10/2025CompleteAL-Lectric Elect'l Contracting52 meters, 52 new_meters
10/29/2024CompleteTuxedo Electrical Contracting—
10/29/2024CompleteTuxedo Electrical Contracting—
08/16/2024CompleteAL-Lectric Elect'l ContractingGeneral Wiring
05/03/2024CompleteIlluminous Electric—
05/02/2024CompleteAL-Lectric Elect'l Contracting—
1 project · most recent 02/04/2026
Concrete
FiledStatusContractorScope
02/04/2026Signed-offLis Piping SolutionConcrete
1 project · most recent 02/04/2026
Fence
FiledStatusContractorScope
02/04/2026Signed-offLis Piping SolutionFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/09/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/09/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/24/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/19/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/19/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/17/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/27/2024Pass-Final House ConnectionPassView ↗
03/12/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/13/2026Maintenance informationXIAOJUN WANGenergy_progress
03/13/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
03/13/2026Fenestration areasXIAOJUN WANGenergy_progress
03/13/2026MeteringXIAOJUN WANGenergy_progress
03/13/2026Exterior lighting powerXIAOJUN WANGenergy_progress
03/13/2026Air barrier — testing XIAOJUN WANGenergy_progress
03/13/2026Lighting controlsXIAOJUN WANGenergy_progress
03/13/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
03/13/2026Fenestration air leakageXIAOJUN WANGenergy_progress
03/13/2026Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
03/13/2026Electrical motors and elevatorsXIAOJUN WANGenergy_progress
03/13/2026Air barrier continuity plan testingXIAOJUN WANGenergy_progress
03/13/2026VestibulesXIAOJUN WANGenergy_progress
03/13/2026Lighting in dwelling unitsXIAOJUN WANGenergy_progress
03/13/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
03/13/2026Interior lighting powerXIAOJUN WANGenergy_progress
03/13/2026Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
03/13/2026Energy Code Compliance InspectionsXIAOJUN WANGprogress
01/30/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
01/30/2026VestibulesXIAOJUN WANGenergy_progress
01/30/2026Exterior lighting powerXIAOJUN WANGenergy_progress
01/30/2026Fenestration air leakageXIAOJUN WANGenergy_progress
01/30/2026MeteringXIAOJUN WANGenergy_progress
01/30/2026Fenestration areasXIAOJUN WANGenergy_progress
01/30/2026Interior lighting powerXIAOJUN WANGenergy_progress
Latest 25 of 150.
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
08/24/2026Q00911472-I1Request digital key ↗
08/24/2026Q00911472-P1Request digital key ↗
08/21/2026Q01040793-P3Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION10
11/10/2025440816645Open ↗
11/03/2025402177568Open ↗
11/03/2025402177559Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
06/02/2025421812881Open ↗
04/28/2025421812881Open ↗
02/11/2019421720757Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
10/26/2017421473097Open ↗
10/26/2017421473097Open ↗
08/15/2017421473097Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/26/2024440816645Open ↗
03/25/2024440816645Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram9
08/13/2026Q08049391-P5Open ↗
08/13/2026Q08049391-P6Open ↗
08/13/2026Q08049391-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q08049391-I1Open ↗
08/13/2026Q08049391-A8Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/10/2026421844311Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/10/2026421844311Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/10/2026421844311Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08049391-I1Open ↗
▸Seals & Professional Certifications81
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/24/2026Q00911472-P1Open ↗
08/24/2026Q00911472-I1Open ↗
08/21/2026Q01040793-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026Q08049391-P5Open ↗
09/01/2026Q08049391-P5Open ↗
08/31/2026Q08049391-A7Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q08049391-P5Open ↗
08/31/2026Q08049391-A7Open ↗
08/27/2026Q08049391-P9Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/04/2019421720757Open ↗
01/31/2019421720757Open ↗
08/15/2017421473097Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/31/2019421720757Open ↗
06/06/2017421473097Open ↗
08/15/2016421360547Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/31/2019421720757Open ↗
06/06/2017421473097Open ↗
08/15/2016421360547Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/18/2024440816645Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/18/2024440816645Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/06/2017421473097Open ↗
06/06/2017421473097Open ↗
▸BISELECTRIC CUT-OFF1
04/28/2025421812881Open ↗
▸BISSEWER CUT-OFF1
04/28/2025421812881Open ↗
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist9
08/13/2026Q08049391-P4Open ↗
08/13/2026Q08049391-A7Open ↗
08/13/2026Q08049391-A1Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST3
03/26/2024440816645Open ↗
03/25/2024440816645Open ↗
03/18/2024440816645Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/28/2025421812881Open ↗
▸BISTenant Protection Plan and Notes1
06/06/2017421473097Open ↗
▸BISSTREET TREES SITE PLAN1
03/25/2024440816645Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/28/2025421812881Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/29/2025421812881Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026Q08049391-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08049391-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08049391-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/28/2025421812881Open ↗
06/06/2017421473097Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/15/2017421473097Open ↗
06/06/2017421473097Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/15/2017421473097Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q08049391-S1Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/10/2026421844311Open ↗
04/29/2025421812881Open ↗
04/29/2025421812881Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/19/2026421360547Open ↗
05/13/2019421720757Open ↗
11/22/2017421473097Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
04/04/2019421720757Open ↗
01/31/2019421720757Open ↗
08/15/2017421473097Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/28/2025421812881Open ↗
▸Filing & Intake Forms18
▸BISBOROUGH INTAKE FORM7
06/02/2025421812881Open ↗
04/29/2025421812881Open ↗
11/04/2022421812881Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
12/11/2025440816645Open ↗
11/12/2025440816645Open ↗
03/26/2024440816645Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
11/04/2022421812881Open ↗
01/31/2019421720757Open ↗
06/06/2017421473097Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/18/2024440816645Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q08049391-P3Open ↗
▸Other Documents33
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/13/2026Q08049391-P6Open ↗
08/13/2026Q08049391-A1Open ↗
08/13/2026Q08049391-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial9
08/13/2026Q08049391-I1Open ↗
08/13/2026Q08049391-A8Open ↗
08/13/2026Q08049391-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/18/2026Q08049391-I1Open ↗
08/18/2026Q08049391-A8Open ↗
08/18/2026Q08049391-A7Open ↗
Showing 3 of 9 on file for this type
▸BISPLOT DIAGRAM1
02/10/2026421844311Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/25/2024440816645Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01174043-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01174043-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q08049391-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08049391-S2Open ↗