STATEN ISLAND
35 ALVINE AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175276
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivil
Roof4p · 1 filing · 7 docs
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.2307/08/2026
RED ROCK PROPERTY MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor507/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/29/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/21/2026
A TECH ENGINEERING NYC, P6738312/04/2023
Building Lifecycle
All (60)Filed (7)Permit Issued (7)Signed Off (2)Inspection (14)Special Inspection (30)
07/28/2026
Permit issued — Solar
S01433625-I1-SL
07/21/2026
Filed — Alteration
S01433625-I1
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/20/2026
Special inspection requirement — Final
Walid Abdulla
02/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/07/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/07/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/07/2023
Special inspection requirement — Mechanical Systems
anthony santoro
12/07/2023
Special inspection requirement — Footing and Foundation
anthony santoro
12/07/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
12/07/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
12/07/2023
Special inspection requirement — Metering
anthony santoro
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/07/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
12/07/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
12/07/2023
Special inspection requirement — Permanent certificate
anthony santoro
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/07/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
12/07/2023
Special inspection requirement — Fenestration areas
anthony santoro
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/07/2023
Special inspection requirement — Interior lighting power
anthony santoro
12/07/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
12/07/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
12/07/2023
Special inspection requirement — Maintenance information
anthony santoro
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/07/2023
Special inspection requirement — Air barrier — testing
anthony santoro
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/04/2023
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-P3
09/19/2023
Signed off — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-S2
09/11/2023
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-P2
09/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2023
Permit issued — Plumbing
S00646583-S2-PL
09/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/29/2023
Signed off — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-S3
08/07/2023
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-P1
08/04/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/31/2023
Permit issued — Curb Cut
S00646583-S3-CC
07/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/26/2023
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-S3
07/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2023
Permit issued — Earth Work
S00646583-I1-GC-CX
02/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/05/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/27/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/23/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/16/2022
Permit issued — Plumbing
S71956206-S2-PL
07/22/2022
Permit issued — Plumbing
S00646583-S2-PL
07/20/2022
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-S2
06/01/2022
Permit issued — Structural
S00646583-I1-GC-CX
01/06/2022
Filed — New Building
INSTALLATION OF NEW 9'-0" CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 18'-0".
S00646583-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC07/28/2026
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.09/01/2023
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION07/31/2023
DOB NOWEarth WorkPermit IssuedBEYER CONSTRUCTION05/31/2023
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN08/16/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/22/2022
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION06/01/2022
1 project · most recent 12/04/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/04/2023Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
3 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
12/14/2022CancelledLASER LITE ELECT'L INC.General Wiring
11/22/2022CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 12/04/2023
Concrete Wood
FiledStatusContractorScope
12/04/2023Signed-offDUO PLUMBING & HTG CORP.Concrete, Wood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
02/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/04/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/05/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/27/2022Pass-Final PL - UndergroundPassView ↗
08/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/20/2026FinalWalid Abdullaprogress
12/07/2023Ventilation and air distribution systemanthony santoroenergy_progress
12/07/2023Meteringanthony santoroenergy_progress
12/07/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/07/2023Air barrier — testing anthony santoroenergy_progress
12/07/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/07/2023Interior lighting poweranthony santoroenergy_progress
12/07/2023Permanent certificateanthony santoroenergy_progress
12/07/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
12/07/2023Insulation placement and R valuesanthony santoroenergy_progress
12/07/2023Fenestration areasanthony santoroenergy_progress
12/07/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/07/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/07/2023Protection of exposed foundation insulationanthony santoroenergy_progress
12/07/2023Air barrier - visual inspectionanthony santoroenergy_progress
12/07/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
12/07/2023Fenestration air leakageanthony santoroenergy_progress
12/07/2023Maintenance informationanthony santoroenergy_progress
12/07/2023Concrete - Cast-In-Placeanthony santorospecial
12/07/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
12/07/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
Latest 25 of 89.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026S00646583-I1Request digital key ↗
08/22/2026S00646583-P3Request digital key ↗
08/22/2026S00646583-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/03/2023540211616Open ↗
08/17/2023540211616Open ↗
12/21/2021540211616Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
02/21/2024540211616Open ↗
08/30/2022540211616Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00646583-I1Open ↗
08/13/2026S00646583-P1Open ↗
08/13/2026S00646583-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00646583-P3Open ↗
08/13/2026S00646583-P1Open ↗
08/13/2026S00646583-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00646583-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00646583-P1Open ↗
09/01/2026S00646583-P1Open ↗
09/01/2026S00646583-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00646583-P1Open ↗
09/01/2026S00646583-P1Open ↗
08/29/2026S01433625-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026S00646583-P3Open ↗
08/22/2026S00646583-P2Open ↗
08/22/2026S00646583-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/21/2021540211616Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/21/2021540211616Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00646583-I1Open ↗
08/13/2026S00646583-P3Open ↗
08/13/2026S00646583-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00646583-P1Open ↗
08/13/2026S00646583-P3Open ↗
08/13/2026S00646583-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00646583-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00646583-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00646583-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00646583-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00646583-P1Open ↗
08/13/2026S00646583-I1Open ↗
08/13/2026S00646583-P3Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/21/2021540211616Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00646583-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00646583-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
12/21/2021540211616Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/30/2022540211616Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/21/2024540211616Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/21/2021540211616Open ↗
▸Other Documents21
▸BISBPP - SUPPORTING DOCUMENTATION9
02/21/2024540211616Open ↗
02/21/2024540211616Open ↗
02/21/2024540211616Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00646583-I1Open ↗
08/13/2026S00646583-P1Open ↗
08/13/2026S00646583-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00646583-P3Open ↗
08/13/2026S00646583-I1Open ↗
08/13/2026S00646583-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00646583-P3Open ↗
08/22/2026S00646583-P1Open ↗
08/22/2026S00646583-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
02/21/2024540211616Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00646583-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00646583-I1Open ↗