← Back
BuildNYC
Two family brick
35 BAY 8 STREET
BROOKLYN · Bath Beach · BIN 3166092
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4Zoning
2,160 sfGross Floor Area
2Units
Two family brick · 2,320 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Great Ravine Roldo2 cellar work12p · 2 filings · 12 docs
Floor 1Great Ravine Roldo2 cellar work11p · 2 filings · 12 docs
CellarGreat Ravine Roldo2 cellar work9p · 1 filing · 10 docs
BasementGreat Ravine Roldo2 cellar work4p · 2 filings · 12 docs
Sub-Basement1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/19/2023$1.5M—Private party → Private party$712/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri601/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kle ConstructionGeneral Contractor303/21/2026
LCJ Electrical ContractorsElectrical103/22/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394212/12/2023
Building Lifecycle
01/29/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:NEW BATHROOM FIXTURES; INSTALL NEW BOILERS AND HOT WATER HEATER ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00910862-I1
01/04/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:NEW BATHROOM FIXTURES; INSTALL NEW BOILERS AND HOT WATER HEATER ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00910862-P3
12/28/2023
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00910860-I1
12/27/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:NEW BATHROOM FIXTURES; INSTALL NEW BOILERS AND HOT WATER HEATER ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00910862-P2
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating08/31/2023
DOB NOWGeneral ConstructionSigned-offKle Construction08/02/2023
1 project · most recent 06/09/2023
General Wiring
FiledStatusContractorScope
06/09/2023CompleteLCJ Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/12/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/12/2023Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/12/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account