← Back
BuildNYC
Elevator apt, fireproof without stores
Columbia University Main Campus
35 CLAREMONT AVENUE · Morningside Heights · BIN 1059822
💬 Discuss this project
1910Year Built
11Stories
D3Building Class
R8Zoning
42,691 sfGross Floor Area
22Units
LL97 CoveredRent Stabilized2 Active Violations 0 unresolved · 2 paperwork only 3 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: Trustees of Columbia University · 5,668 sf lot · 7.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 7Unit 7S1 filing · 15 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarHot water heater and boiler installation1 filing · 3 docs
Site & exteriorFacade repairs for LL11/98 complianceUnder Construction12p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Columbia Residential1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus306/10/2026
George J. Xerakias, PE205/12/2026
Hoffmann Architects201/15/2026
Environmental Engineering Solutions110/16/2024
D'Antonio Consulting Engineers309/27/2022
Rise Projects209/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kma Designs403/21/2026
HS Design Studio203/21/2026
Codegreen203/21/2026
Nyccode1003/21/2026
Environmental Engineering Solutions103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Essential Design Buildspecialty_contractor407/08/2026
Kings Group NYScaffold307/08/2026
Columbia UniversityGeneral Contractor303/21/2026
Absolute Plumbing & HeatingPlumbing303/22/2026
Essential Design & BuildGeneral Contractor207/08/2026
Alafogiannis Plumbing & HeatingPlumbing103/21/2026
Watsons Plumbing & Heating BuildingPlumbing103/21/2026
High Quality ElectricElectrical103/21/2026
Authentic PlumbingPlumbing107/08/2026
Atlas Electric ContractorsElectrical103/21/2026
Mamais ContractingGeneral Contractor103/21/2026
New Roc ContractingGeneral Contractor107/08/2026
Outdoor InstallationsGeneral Contractor103/21/2026
Everest ScaffoldingGeneral Contractor106/23/2014
Henry RestorationGeneral Contractor310/03/2014
Henry RestorationGeneral Contractor108/14/2008
Watson's Plumbing, Heating, & BuildingPlumbing102/22/2017
York Scaffold EquipmentGeneral Contractor105/13/2002
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290201/15/2026
Site Safety8555201/15/2026
D'Antonio Consulting Engineering931509/27/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/13/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
M01173163-S2-SF
10/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01331019-I1
10/05/2026
Elevator Category 1 inspection report filed
10/01/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
145 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNew Roc Contracting03/03/2026
DOB NOWSuspended ScaffoldSigned-offNew Roc Contracting02/02/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY01/22/2026
DOB NOWSupported ScaffoldPermit IssuedKings Group NY11/13/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY01/30/2025
DOB NOWGeneral ConstructionSigned-offEssential Design & Build05/17/2022
DOB NOWMechanical SystemsSigned-offEssential Design & Build05/17/2022
DOB NOWPlumbingSigned-offAuthentic Plumbing04/12/2022
DOB NOWGeneral ConstructionSigned-offEssential Design & Build04/07/2022
DOB NOWMechanical SystemsSigned-offEssential Design & Build04/06/2022
BISPLISSUEDAlafogiannis Plumbing & Heating04/11/2019
BISOTISSUEDMamais Contracting04/01/2019
BISPLISSUEDWatson's Plumbing, Heating, & Building02/22/2017
BISOTISSUEDColumbia University01/18/2017
BISOTISSUEDHenry Restoration10/03/2014
BISOTISSUEDHenry Restoration07/17/2014
BISEQISSUEDEverest Scaffolding06/23/2014
BISPLISSUEDAbsolute Plumbing & Heating03/11/2014
BISPLISSUEDAbsolute Plumbing & Heating10/12/2011
BISOTISSUEDColumbia University06/27/2011
BISOTISSUEDColumbia University02/03/2009
BISOTISSUEDHenry Restoration08/14/2008
BISEQISSUEDOutdoor Installations03/26/2008
BISOTISSUEDHenry Restoration05/20/2002
BISEQISSUEDYork Scaffold Equipment05/13/2002
BISOTISSUEDColumbia University03/21/2002
2 projects · most recent 01/31/2025
General Wiring
FiledStatusContractorScope
01/31/2025Permit IssuedHigh Quality Electric—
08/31/2022CompleteHeso ElectricalGeneral Wiring
1 project · most recent 06/10/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/10/2026Permit IssuedKings Group NYScaffold, Sidewalk Shed
1 project · most recent 05/12/2026
Suspended Scaffold
FiledStatusContractorScope
05/12/2026Signed-offNew Roc ContractingSuspended Scaffold
1 project · most recent 05/12/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/12/2026Signed-offNew Roc ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/01/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
10/01/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
10/01/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/13/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
04/29/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
01/29/2026Post-installed AnchorsGEORGE ANDERSENspecial
01/29/2026Tenant Protection Plan ComplianceKHALID ALGENDEspecial
01/29/2026FinalJuan Kuriyamaprogress
10/27/2025Post-installed AnchorsGEORGE ANDERSENspecial
10/17/2025Tenant Protection Plan ComplianceKHALID ALGENDEspecial
10/17/2025FinalJuan Kuriyamaprogress
09/21/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
09/15/2022Finalkaren fromeprogress
09/15/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
09/08/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
09/08/2022Finalkaren fromeprogress
02/09/2022Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
02/09/2022FinalGAETANO D'ANTONIOprogress
02/09/2022Mechanical SystemsGAETANO D'ANTONIOspecial
172 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account