Two stories - detached, small or mid-size
35 GRANDVIEW TERRACE
STATEN ISLAND · BIN 5065757
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3XZoning
3,623 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 11,684 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction35p · 2 filings · 20 docs
Floor 1Under Construction36p · 2 filings · 20 docs
CellarUnder Construction36p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3584 CONSTRUCTION503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL A. BIAGIOLI, ARCHITECT1105/19/2026
A TECH ENGINEERING NYC, PLLC.202/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS2003/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3584 CONSTRUCTION CORPGeneral Contractor1108/30/2026
RJ BRUNO INCPlumbing307/08/2026
PRESTIGE PLBG & HTG INCFire Protection106/28/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738502/12/2025
Building Lifecycle
All (77)Filed (13)Permit Issued (12)Violation (5)Inspection (17)Special Inspection (30)
08/28/2026
Permit issued — General Construction
S00862129-I1-GC
05/19/2026
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P7
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/16/2026
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P6
01/14/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/16/2025
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P5
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2025
Permit issued — General Construction
S00862129-I1-GC
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Permit issued — Plumbing
S00862129-S1-PL
07/21/2025
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P4
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Permit issued — Plumbing
S76497776-S1-PL
04/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2025
Permit issued — Plumbing
S00904423-I1-EW-SP
03/04/2025
Permit issued — Sprinklers
S00904423-I1-PL
02/27/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
02/27/2025
Special inspection requirement — Fenestration areas
anthony santoro
02/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/27/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/27/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
02/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/27/2025
Special inspection requirement — Preliminary
anthony santoro
02/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/27/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
02/27/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
02/27/2025
Special inspection requirement — Maintenance information
anthony santoro
02/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
02/27/2025
Special inspection requirement — Lighting in dwelling units
anthony santoro
02/27/2025
Special inspection requirement — Air barrier — testing
anthony santoro
02/27/2025
Special inspection requirement — Fireplaces
anthony santoro
02/27/2025
Special inspection requirement — Permanent certificate
anthony santoro
02/27/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
02/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
02/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
02/20/2025
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P3
02/14/2025
Special inspection requirement — Sprinkler Systems
anthony santoro
02/12/2025
Filed — Alteration CO
Plumbing work as per plan filed in conjunction with alteration
S00862129-P2
02/11/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00904423-P1
01/09/2025
Special inspection requirement — Sprinkler Systems
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Permit issued — General Construction
S00862129-I1-GC
09/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2024
Permit issued — Construction Fence
S00875245-I1-FN
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/05/2024
Permit issued — Plumbing
S00862129-S1-PL
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2024
Violation issued (ECB, closed)
Construction
03/19/2024
Violation issued (ECB, closed)
Unknown
03/19/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued3584 CONSTRUCTION CORP08/28/2026
DOB NOWGeneral ConstructionPermit IssuedS&B CONSTRUCTION08/14/2025
DOB NOWPlumbingPermit IssuedRJ BRUNO INC07/24/2025
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC05/08/2025
DOB NOWPlumbingPermit IssuedRJ BRUNO INC03/04/2025
DOB NOWSprinklersPermit IssuedRJ BRUNO INC03/04/2025
DOB NOWGeneral ConstructionPermit IssuedS&B CONSTRUCTION09/11/2024
DOB NOWConstruction FencePermit IssuedS&B CONSTRUCTION08/22/2024
DOB NOWPlumbingPermit IssuedRJ BRUNO INC07/05/2024
DOB NOWStructuralPermit IssuedS&B CONSTRUCTION09/27/2023
DOB NOWGeneral ConstructionPermit IssuedS&B CONSTRUCTION09/19/2023
DOB NOWConstruction FencePermit IssuedS&B CONSTRUCTION08/25/2023
1 project · most recent 02/11/2025
FiledStatusContractorScope
02/11/2025Permit IssuedRJ BRUNO INC45 heads
2 projects · most recent 05/19/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
05/19/2026Permit IssuedRJ BRUNO INCGas, Storm, Water/Sanitary
02/11/2025Permit IssuedRJ BRUNO INCWater/Sanitary
1 project · most recent 02/22/2025
General Wiring
FiledStatusContractorScope
02/22/2025Permit IssuedMCGUIRE ELECTRICAL CORP.General Wiring
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026Permit Issued3584 CONSTRUCTION CORP1 scope_items
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/27/2025Insulation placement and R valuesanthony santoroenergy_progress
02/27/2025Fenestration areasanthony santoroenergy_progress
02/27/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/27/2025Concrete - Cast-In-Placeanthony santorospecial
02/27/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
02/27/2025Subgrade Inspectionsanthony santorospecial
02/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/27/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/27/2025Fire-Resistance Rated Constructionanthony santoroprogress
02/27/2025Preliminaryanthony santoroprogress
02/27/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/27/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
02/27/2025Air barrier - visual inspectionanthony santoroenergy_progress
02/27/2025Maintenance informationanthony santoroenergy_progress
02/27/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/27/2025Lighting in dwelling unitsanthony santoroenergy_progress
02/27/2025Air barrier — testing anthony santoroenergy_progress
02/27/2025Fireplacesanthony santoroenergy_progress
02/27/2025Permanent certificateanthony santoroenergy_progress
02/27/2025Fenestration air leakageanthony santoroenergy_progress
02/27/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
02/27/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
02/14/2025Sprinkler Systemsanthony santorospecial
01/09/2025Sprinkler Systems—special
09/25/2023Wood – Prefabricated I-Joistsanthony santorospecial
Latest 25 of 34.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/23/2026S00875245-I1Request digital key ↗
08/20/2026S00904423-I1Request digital key ↗
08/20/2026S00904423-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
05/02/2023540248588Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00862129-I1Open ↗
08/13/2026S00862129-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00862129-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/20/2026S00904423-P1Open ↗
08/20/2026S00904423-I1Open ↗
08/16/2026S00862129-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00862129-I1Open ↗
09/01/2026S00862129-I1Open ↗
08/30/2026S00862129-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00862129-I1Open ↗
09/01/2026S00862129-I1Open ↗
08/30/2026S00862129-S2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/01/2023540248588Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/25/2023540248588Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00862129-P2Open ↗
08/13/2026S00862129-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026S00862129-P2Open ↗
08/13/2026S00862129-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00862129-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00862129-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/16/2026S00862129-S1Open ↗
08/16/2026S00862129-P5Open ↗
08/16/2026S00862129-P7Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026S00862129-I1Open ↗
08/13/2026S00862129-P2Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/25/2023540248588Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/25/2023540248588Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00862129-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/02/2023540248588Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification2
08/16/2026S00862129-I1Open ↗
08/16/2026S00862129-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00862129-P2Open ↗
08/13/2026S00862129-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00862129-P2Open ↗
08/13/2026S00862129-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S00862129-I1Open ↗
08/13/2026S00862129-P2Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/01/2023540248588Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/01/2023540248588Open ↗
▸BISWAIVER OF CURB ALIGNMENT.1
05/01/2023540248588Open ↗
▸BISWAIVER OF 7 FEET BETWEEN HYD & CURB CUT.1
05/01/2023540248588Open ↗
▸BISWAIVER OF SIDEWALK.1
05/01/2023540248588Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/25/2023540248588Open ↗