35 MOUNT MORRIS PARK WEST
MANHATTAN · BIN 1053433
💬 Discuss this project
1890Year Built
6Stories
D4Building Class
R7-2Zoning
50,500 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized16 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 35MT Morris Park West HDFC · 10,092 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof35 MT. Morris Park West HDFC18p · 2 filings · 14 docs
Bulkhead35 MT. Morris Park West HDFC2p · 1 filing · 10 docs
PenthouseUnit PH1p · 1 filing · 5 docs
Floor 6Unit 6C7p · 2 filings · 20 docs
Floor 5Heavy duty pipe scaffold3p · 1 filing · 4 docs
Floor 4Heavy duty pipe scaffold3p · 1 filing · 4 docs
Floor 3Heavy duty pipe scaffold3p · 1 filing · 4 docs
Floor 2Heavy duty pipe scaffold3p · 1 filing · 4 docs
Floor 1Heavy duty pipe scaffold3p · 1 filing · 4 docs
Sub-BasementApartment renovation2p · 1 filing · 1 doc
Site & exterior35 MT. Morris Park West HDFC28p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
35MT Morris Park West HDFC2207/08/2026
Covington Realty Services1907/08/2026
ADB103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Peter Cho109/26/2025
Niza Works of Architecture108/13/2025
KN3 Engineering102/07/2025
KZ Engineering409/04/2024
Tiffani Lee Simple203/08/2024
Salazar + Rossello Architecture303/22/2022
Royal T&E209/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Niza Works of Architecture103/21/2026
AE Design Solution803/21/2026
Jca & Associates603/21/2026
Synergy Building Consultants403/21/2026
Metro Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold1107/08/2026
CS BridgeScaffold907/08/2026
Skyline Restorationspecialty_contractor307/08/2026
V. Vass ElectricElectrical103/21/2026
Cutting Edge ConstructionGeneral Contractor108/11/2026
GT Development EnterpriseGeneral Contractor107/08/2026
Wire Works Electl ContractingElectrical103/21/2026
Rugova GroupPlumbing107/08/2026
Bobtek ElectricalElectrical103/21/2026
Beacon ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E Build Evergreen I9342109/26/2025
Niza Works of Architects6101108/13/2025
Leo Y Lee Associates2481402/07/2025
Lombardo Prof Engineering8566203/08/2024
Amka & Associates8239103/08/2024
Simple Design Studio-Architects7915203/08/2024
Piro Studio7503303/22/2022
Building Lifecycle
All (145)Filed (17)Permit Issued (26)Signed Off (4)Facade (FISP) (23)Violation (60)Objection (2)Special Inspection (13)
08/25/2026
Signed off — Alteration
FACADE REPAIRS TO ADDRESS LOCAL LAW
M01015889-I1
08/10/2026
Permit issued — General Construction
M01293478-I1-GC
07/14/2026
Violation issued (HPD, open)
B
05/27/2026
Signed off — Alteration
M01270016-I1
04/29/2026
Violation issued (HPD, closed)
A
04/28/2026
Cycle 9 facade report signed — SWARMP
04/26/2026
Violation issued (HPD, open)
C
04/26/2026
Violation issued (HPD, open)
C
04/26/2026
Violation issued (HPD, open)
A
04/26/2026
Violation issued (HPD, closed)
C
04/26/2026
Violation issued (HPD, closed)
B
03/25/2026
Cycle 9 facade report submitted
03/12/2026
Cycle 9 facade inspection completed
03/03/2026
Permit issued — General Construction
M01015889-I1-GC
02/27/2026
Permit issued — Suspended Scaffold
M01176946-I1-SC
02/27/2026
Permit issued — Suspended Scaffold
M01031729-I1-SC
02/20/2026
Violation issued (HPD, open)
A
02/11/2026
Permit issued — Suspended Scaffold
M01176946-I1-SC
01/07/2026
Permit issued — General Construction
M01270016-I1-GC
11/12/2025
Cycle 9 facade report submitted
11/12/2025
Cycle 9 facade report signed — UNSAFE
10/27/2025
Cycle 9 facade inspection completed
10/15/2025
Violation issued (HPD, closed)
C
09/30/2025
Permit issued — Sidewalk Shed
M00278061-I1-SH
09/26/2025
Filed — Alteration
M01293478-I1
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, closed)
B
08/28/2025
Violation issued (HPD, closed)
B
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
B
08/13/2025
Filed — Alteration
M01270016-I1
07/10/2025
Violation issued (HPD, closed)
A
07/08/2025
Violation issued (HPD, closed)
C
02/26/2025
Permit issued — General Construction
M01015889-I1-GC
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
02/12/2025
Permit issued — Suspended Scaffold
M01176946-I1-SC
02/11/2025
Violation issued (HPD, closed)
C
02/11/2025
Violation issued (HPD, closed)
C
02/07/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01176946-I1
01/17/2025
Violation issued (HPD, closed)
C
01/17/2025
Violation issued (HPD, closed)
C
12/19/2024
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, open)
C
11/20/2024
Cycle 9 facade report signed — UNSAFE
11/11/2024
Cycle 9 facade report submitted
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCutting Edge Construction08/10/2026
DOB NOWGeneral ConstructionSigned-offSkyline Restoration03/03/2026
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/27/2026
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/27/2026
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/11/2026
DOB NOWGeneral ConstructionSigned-offGT Development Enterprise01/07/2026
DOB NOWSidewalk ShedPermit IssuedCS Bridge09/30/2025
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/26/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/12/2025
DOB NOWSidewalk ShedPermit IssuedCS Bridge10/24/2024
DOB NOWGeneral ConstructionSigned-offSkyline Restoration10/15/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration09/12/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration06/25/2024
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR05/28/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration05/03/2024
DOB NOWSidewalk ShedPermit IssuedCS Bridge11/03/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR05/30/2023
DOB NOWSidewalk ShedPermit IssuedCS Bridge11/07/2022
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR05/31/2022
DOB NOWSidewalk ShedPermit IssuedCS Bridge11/08/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR06/01/2021
DOB NOWPlumbingSigned-offRugova Group04/09/2021
DOB NOWSidewalk ShedPermit IssuedCS Bridge11/19/2020
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR06/03/2020
DOB NOWSidewalk ShedPermit IssuedCS Bridge12/10/2019
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR06/04/2019
BISOTISSUEDSheldon Pearce04/07/2021
BISOTISSUEDParadigm Builders08/29/2017
BISPLISSUEDCommerical Plumbing Svces08/09/2017
BISOTISSUEDParadigm Builders04/07/2017
BISPLISSUEDCommerical Plumbing Svces12/13/2016
BISOTISSUEDParadigm Builders08/16/2016
BISMHISSUEDParadigm Builders08/16/2016
BISOTISSUEDN'S Construction08/19/2014
BISOTISSUEDN'S Construction05/29/2014
BISEQISSUEDColgate Enterprise03/18/2014
BISOTISSUEDAvarga Contracting02/19/2014
BISEQISSUEDColgate Enterprise03/15/2013
BISOTISSUEDPhil Valenza Contracting06/15/2011
BISOTISSUEDDJM Restoration04/01/2009
+ 12 more permits on file
7 projects · most recent 06/18/2024
General Wiring Lighting
FiledStatusContractorScope
06/18/2024CompleteJte Electrical Services—
02/02/2023CompleteJ & Y Electric and Inter*General Wiring
03/23/2022CompleteRayon's ElectricalGeneral Wiring, Lighting
05/06/2021Permit IssuedRobert Chimenti37 meters, 1 new_meters
12/06/2019Permit IssuedNash Electric Services—
10/03/2019CompleteWill Cos Electric CoGeneral Wiring
11/05/2018CompleteJ & Y Electric and Inter*General Wiring
2 projects · most recent 02/07/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/07/2025Permit IssuedSkyline RestorationSuspended Scaffold (SC)
09/09/2024Permit IssuedSkyline RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/12/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
09/12/2024Post-installed AnchorsLeo Leespecial
09/09/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
09/09/2024Post-installed AnchorsLeo Leespecial
06/13/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
06/13/2024Post-installed AnchorsLeo Leespecial
03/06/2024Tenant Protection Plan ComplianceMichael Lombardospecial
03/06/2024MasonryTiffani Simplespecial
03/06/2024Post-installed AnchorsTiffani Simplespecial
03/06/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
03/06/2024FinalTiffani Simpleprogress
03/17/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/17/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch7
08/28/2026M00867999-I1Request digital key ↗
08/27/2026M01015889-I1Request digital key ↗
08/26/2026M01031729-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00278061-I1Request digital key ↗
09/05/2026M00278061-P3Request digital key ↗
08/15/2026M00278061-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026M00362080-I1Request digital key ↗
09/02/2026M00362080-P2Request digital key ↗
08/15/2026M00362080-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00175250-I1Request digital key ↗
08/15/2026M00175250-P1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION17
06/03/2021140943095Open ↗
05/26/2021140943095Open ↗
05/24/2021140943095Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION16
04/07/2021140943095Open ↗
08/30/2017122872524Open ↗
08/30/2017122872524Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit6
09/02/2026M00362080-I1Open ↗
09/02/2026M00362080-P1Open ↗
08/13/2026M01015889-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
07/05/2019122514902Open ↗
07/05/2019122514902Open ↗
12/23/2016122872524Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00175250-I1Open ↗
09/02/2026M00362080-I1Open ↗
08/28/2026M00867999-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026M01031729-P2Open ↗
08/31/2026M01031729-P2Open ↗
08/25/2026M01015889-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/03/2014122024399Open ↗
06/17/2011120719151Open ↗
11/23/2007110029399Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/03/2014122024399Open ↗
06/17/2011120719151Open ↗
11/23/2007110029399Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M01015889-I1Open ↗
08/23/2026M00362080-P2Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/26/2020140943095Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/26/2020140943095Open ↗
▸BISPC FULL REPORT1
11/23/2007110029399Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING4
06/03/2014122024399Open ↗
10/08/2009110444305Open ↗
05/15/2009110444305Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
11/01/2017122872524Open ↗
10/30/2017122872524Open ↗
12/23/2016122872524Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS1
07/18/2023122872524Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/18/2023122872524Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/23/2007110029399Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan7
09/02/2026M00362080-P1Open ↗
09/02/2026M00362080-I1Open ↗
08/13/2026M00362080-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes3
12/23/2016122872524Open ↗
06/03/2016122514902Open ↗
11/19/2020140943095Open ↗
▸BISSTREET TREE CHECKLIST2
06/17/2011120719151Open ↗
02/03/2009110444305Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS-CERTIFICATION (DEP ACP5)8
06/03/2014122024399Open ↗
06/03/2014122024399Open ↗
02/21/2014121772297Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00362080-I1Open ↗
09/02/2026M00362080-P1Open ↗
08/21/2026M01293478-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/03/2009110444305Open ↗
11/23/2007110029399Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
05/07/2014121772297Open ↗
05/07/2014121772297Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00867999-I1Open ↗
08/13/2026M01015889-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/17/2011120719151Open ↗
▸Energy Compliance12
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
▸BISLIGHTING IN DWELLING UNITS2
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/03/2014122024399Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/26/2020140943095Open ↗
▸BISLIGHTING CONTROLS1
04/26/2022140943095Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/23/2016122872524Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/23/2020140943095Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/18/2023122872524Open ↗
▸Inspections & Test Reports6
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/23/2020140943095Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/23/2020140943095Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
11/23/2007110029399Open ↗
▸BISMECHANICAL SYSTEMS1
07/18/2023122872524Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLANDMARKS APPROVAL8
10/23/2020140943095Open ↗
07/05/2019122514902Open ↗
12/23/2016122872524Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
07/18/2023122872524Open ↗
04/27/2022140943095Open ↗
07/05/2019122514902Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF2
07/18/2023122872524Open ↗
04/27/2022140943095Open ↗
▸BISFINAL2
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/17/2011120719151Open ↗
11/23/2007110029399Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/23/2007110029399Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01270016-I1Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT10
08/26/2020140943095Open ↗
07/05/2019122514902Open ↗
12/23/2016122872524Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/18/2023122872524Open ↗
04/26/2022140943095Open ↗
04/26/2022140943095Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
10/23/2020140943095Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/02/2009110444305Open ↗
▸BISWELDERS AFFIDAVIT1
04/13/2017122872524Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
12/23/2016122872524Open ↗
06/03/2016122514902Open ↗
06/03/2016122514902Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
11/18/2020140943095Open ↗
06/28/2019122514902Open ↗
11/09/2017122872524Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/05/2019122514902Open ↗
11/01/2017122872524Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/26/2020140943095Open ↗
▸Other Documents15
▸DOB NOWCalculations4
08/26/2026M01031729-I1Open ↗
08/13/2026M01031729-P2Open ↗
08/13/2026M01031729-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/26/2026M01031729-I1Open ↗
08/13/2026M01176946-I1Open ↗
08/13/2026M01031729-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/18/2016121772297Open ↗
03/28/2014121561274Open ↗
09/12/2013121772297Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026M01015889-I1Open ↗
08/13/2026M01293478-I1Open ↗
▸BISSupporting Document: Fee Deferment1
07/12/2016121772297Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00867999-I1Open ↗