2016Year Built
2Stories
K6Building Class
M1-1Zoning
492,962 sfGross Floor Area
73Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: St George Outlet Development · 353,627 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVerizon21p · 4 filings · 20 docs
Floor 2MRKTPL30p · 5 filings · 20 docs
Floor 1Verizon, JOHNSTON& Murphy +133p · 19 filings · 20 docs
Site & exteriorPatterns and Dots, JOHNSTON& Murphy +120p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St George Outlet Development12307/08/2026
Rpa Trading903/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21471203/21/2026
Citiscape Consulting803/21/2026
ADG Architecture Design403/21/2026
Building Brothers403/21/2026
Mago Architecture403/21/2026
New York Sign Consultants2003/21/2026
All in Permit Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mauceri Sign CoSign hanger1407/08/2026
Active SignsSign hanger307/08/2026
Signstar NYCSign hanger207/08/2026
KorkGeneral Contractor107/08/2026
Retail Construction ServicesGeneral Contractor107/08/2026
Interboro Sign & Electrical MaintenanceSign hanger107/08/2026
Signs CadSign hanger107/08/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
MPC Plumbing & HeatingPlumbing107/08/2026
Rite Way Plumbing & HeatingPlumbing107/08/2026
Eco Electrical ServcsElectrical103/22/2026
Tristar Plumbing & HeatingPlumbing107/08/2026
L.D.M. Electl ContractorsElectrical103/22/2026
G & B DevelopmentGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Consulting Engineer5093103/21/2024
SRA Planning & Expediting5677407/30/2021
Special Testing & Consulting1688210/30/2020
Citiscape Consulting762112/13/2019
Building Lifecycle
All (171)Filed (33)Permit Issued (28)Signed Off (23)Violation (3)Objection (54)Special Inspection (30)
05/14/2025
Violation issued (FDNY_ORDER, closed)
03/21/2024
Filed — Alteration
S01023787-I1
08/17/2022
Violation issued (FDNY_NOV, closed)
10/25/2021
Signed off — Alteration
S00407684-I1
08/30/2021
Signed off — Alteration
INSTALLATION OF PATTERNS AND DOTS ACCESSORY SIGNAGE ABOVE EXISTING STOREFRONT.
S00512142-I1
07/30/2021
Filed — Alteration
FILING FOR PLUMBING AND GAS PIPING FOR OUTDOOR BAR HEATERS
S00383514-P2
07/30/2021
Special inspection requirement — HVAC insulation and sealing
WILLIAM MONTAGUE
07/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
07/30/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
07/30/2021
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
07/30/2021
Special inspection requirement — HVAC and service water heating system controls
WILLIAM MONTAGUE
07/30/2021
Special inspection requirement — HVAC and service water heating equipment
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — HVAC and service water heating equipment
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — HVAC and service water heating system controls
WILLIAM MONTAGUE
07/27/2021
Special inspection requirement — HVAC insulation and sealing
WILLIAM MONTAGUE
07/23/2021
Signed off — Alteration
EXTERIOR FREE STANDING CANOPY STRUCTURE ON LEVEL 4 FLOOR (2). NO CHANGE TO EGRESS, OCCUPANCY OR USE. NO SUBSTANTIAL IMPROVEMENT. FLOOD ZONE DESIGN CERTIFICATE WAS FILED AND APPROVED UNDER # 520208800
S00381462-I1
07/19/2021
Special inspection requirement — Public Assembly Emergency Lighting
Christopher Carrano
06/28/2021
Filed — No Work
S00348561-P1
06/25/2021
Special inspection requirement — Public Assembly Emergency Lighting
Christopher Carrano
06/23/2021
Filed — Alteration
FILING FOR PLUMBING AND GAS PIPING FOR OUTDOOR BAR HEATERS
S00383514-P1
05/26/2021
Permit issued — Sign
S00512142-I1-SG
05/07/2021
Filed — Alteration
INSTALLATION OF PATTERNS AND DOTS ACCESSORY SIGNAGE ABOVE EXISTING STOREFRONT.
S00512142-I1
04/28/2021
Special inspection requirement — Final
Hannibal Newsom
12/17/2020
Filed — No Work
S00441060-I1
12/15/2020
Special inspection requirement — Public Assembly Emergency Lighting
Derek Ziemer
11/16/2020
Objection resolved — Addressed
11/10/2020
Permit issued — Sprinklers
S00407684-I1-EW-SP
10/30/2020
Filed — Alteration
S00407684-I1
10/22/2020
Signed off — Alteration
INSTALL ILLUMINATED D/F BLADE SIGN ON WALL (VERIZON)
S00326513-I1
10/22/2020
Signed off — Alteration
INSTALL ILLUMINATED SIGN ON WALL (VERIZON)
S00326512-I1
10/02/2020
Signed off — Alteration
INSTALLATION OF SPLIT AIR CONDITIONING SYSTEM AND VENTILATION FOR VERIZON STORE IN CONJUNCTION WITH 520394582
S00267079-I1
09/29/2020
Signed off — Alteration
NEW PLUMBING APPLICATION IN CONJUNCTION WITH 520394582
S00267072-I1
09/18/2020
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER PLANS
S00206008-I1
09/18/2020
Signed off — Alteration
INSTALLATION OF DUCTWORK AND PIPING TO EXISTING HVAC UNIT
S00206030-I1
09/02/2020
Permit issued — Structural
S00381462-I1-ST
08/25/2020
Permit issued — Plumbing
S00383514-I1-PL
08/25/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/21/2020
Objection resolved — Addressed
08/19/2020
Signed off — Alteration
S00289093-I1
08/19/2020
Signed off — Alteration
ERECT ILLUMINATED WALL SIGN AND (1) ILLUMINATED D/F WALL SIGNS. SIGNS ARE ACCESSORY TO JOHNSON & MURPHY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00289060-I1
08/18/2020
Objection raised — Structural
08/18/2020
Objection raised — Structural
08/18/2020
Objection raised — Other
08/18/2020
Objection raised — Scope
08/18/2020
Objection raised — Fire_Protection
08/18/2020
Objection raised — Fire_Protection
08/18/2020
Objection raised — Mechanical
08/18/2020
Objection raised — Structural
08/18/2020
Objection raised — Structural
08/14/2020
Filed — Alteration
EXTERIOR FREE STANDING CANOPY STRUCTURE ON LEVEL 4 FLOOR (2). NO CHANGE TO EGRESS, OCCUPANCY OR USE. NO SUBSTANTIAL IMPROVEMENT. FLOOD ZONE DESIGN CERTIFICATE WAS FILED AND APPROVED UNDER # 520208800
S00381462-I1
08/12/2020
Filed — Alteration
FILING FOR PLUMBING AND GAS PIPING FOR OUTDOOR BAR HEATERS
S00383514-I1
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offActive Signs05/26/2021
DOB NOWSprinklersSigned-offAnthony Caiazzo11/10/2020
DOB NOWStructuralSigned-offG & B Development09/02/2020
DOB NOWPlumbingSigned-offMPC Plumbing & Heating08/25/2020
DOB NOWMechanical SystemsSigned-offKork06/15/2020
DOB NOWSignSigned-offSignstar NYC06/05/2020
DOB NOWSignSigned-offSignstar NYC06/05/2020
DOB NOWPlumbingSigned-offRite Way Plumbing & Heating02/27/2020
DOB NOWSignSigned-offActive Signs02/19/2020
DOB NOWSignSigned-offActive Signs02/19/2020
DOB NOWPlumbingSigned-offTristar Plumbing & Heating10/21/2019
DOB NOWMechanical SystemsSigned-offRetail Construction Services10/17/2019
DOB NOWSignSigned-offSigns Cad07/12/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offMauceri Sign Co05/09/2019
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance02/28/2019
DOB NOWSignSigned-offMauceri Sign Co01/10/2019
DOB NOWSignSigned-offMauceri Sign Co01/10/2019
DOB NOWSignSigned-offMauceri Sign Co01/10/2019
DOB NOWSignSigned-offMauceri Sign Co01/10/2019
DOB NOWSignSigned-offMauceri Sign Co07/27/2018
DOB NOWSignSigned-offMauceri Sign Co07/27/2018
DOB NOWSignSigned-offMauceri Sign Co07/27/2018
DOB NOWSignSigned-offMauceri Sign Co07/27/2018
BISPLISSUEDJ. Caiazzo Plumbing & Heating02/10/2021
BISMHISSUEDC&A Seneca Construction12/28/2020
BISOTISSUEDC&A Seneca Construction12/28/2020
BISOTISSUEDC&A Seneca Construction11/13/2020
BISOTISSUEDG & B Development08/21/2020
BISOTISSUEDC&A Seneca Construction06/03/2020
BISMHISSUEDC&A Seneca Construction06/03/2020
BISOTISSUEDKork03/13/2020
BISOTISSUEDRetail Construction Services11/19/2019
BISSDISSUEDM. Early Plumbing & Heating10/15/2019
BISSDISSUEDM. Early Plumbing & Heating10/11/2019
BISSPISSUEDJ. Caiazzo Plumbing & Heating09/24/2019
+ 26 more permits on file
1 project · most recent 07/30/2021
Water/Sanitary
FiledStatusContractorScope
07/30/2021Signed-offMPC Plumbing & HeatingWater/Sanitary
16 projects · most recent 11/22/2021
General Wiring Lighting
FiledStatusContractorScope
11/22/2021Permit IssuedL.D.M. Electl ContractorsGeneral Wiring
01/05/2021CompleteEco Electrical ServcsGeneral Wiring, Lighting
12/12/2020Permit IssuedGemini Electric CoGeneral Wiring
06/10/2020CompleteRainbow Electric Co—
06/10/2020CompleteRainbow Electric Co—
02/25/2020CompleteRainbow Electric Co—
02/25/2020CompleteRainbow Electric Co—
02/25/2020CompleteRainbow Electric Co—
02/25/2020CompleteRainbow Electric Co—
12/16/2019Permit IssuedBlue Seagull ElectricalGeneral Wiring
10/25/2019CompleteValmar ElectricGeneral Wiring
07/12/2019CompleteNewbridge Electl Contng—
06/11/2019CompleteEastern Electrical TechnologiesGeneral Wiring
02/21/2019CompleteAscuatech ElectricalGeneral Wiring
01/04/2019CompleteAscuatech ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
07/30/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
07/30/2021Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
07/30/2021Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
07/30/2021Maintenance informationWILLIAM MONTAGUEenergy_progress
07/30/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
07/30/2021HVAC and service water heating equipment WILLIAM MONTAGUEenergy_progress
07/27/2021Maintenance informationWILLIAM MONTAGUEenergy_progress
07/27/2021HVAC and service water heating equipment WILLIAM MONTAGUEenergy_progress
07/27/2021Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
07/27/2021Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
07/27/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
07/27/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
07/19/2021Public Assembly Emergency LightingChristopher Carranoprogress
06/25/2021Public Assembly Emergency LightingChristopher Carranoprogress
04/28/2021FinalHannibal Newsomprogress
12/15/2020Public Assembly Emergency LightingDerek Ziemerprogress
08/06/2020FinalWILLIAM MONTAGUEprogress
08/06/2020Structural Steel - WeldingWILLIAM MONTAGUEspecial
08/06/2020Structural Steel - DetailsWILLIAM MONTAGUEspecial
08/06/2020Structural Cold-Formed SteelWILLIAM MONTAGUEspecial
03/03/2020FinalLEON SKVIRSKYprogress
02/19/2020HVAC and service water heating equipment Joe Liebermanenergy_progress
02/19/2020Fire-Resistant Penetrations and JointsJoe Liebermanspecial
02/19/2020Shutoff dampersJoe Liebermanenergy_progress
02/19/2020HVAC insulation and sealing Joe Liebermanenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteFloor 1, Roof
Project S01023787 Alteration · Approved · 03/21/2024
Project S00326512 Alteration · LOC Issued · 03/20/2020
Project S00326513 Alteration · LOC Issued · 03/20/2020
Project S00267072 Alteration · LOC Issued · 12/13/2019
Project S00267079 Alteration · LOC Issued · 12/13/2019
Patterns and DotsRetail—
Project S00512142 Alteration · LOC Issued · 05/07/2021
MRKTPLRetailFloor 2
Project S00441060 No Work · Approved · 12/17/2020
Project S00407684 Alteration · LOC Issued · 10/30/2020
JOHNSTON& MurphyRetailFloor 1
Project S00289060 Alteration · LOC Issued · 02/07/2020
Project S00289093 Alteration · LOC Issued · 02/07/2020
Project S00206008 Alteration · LOC Issued · 08/16/2019
Project S00206030 Alteration · LOC Issued · 08/16/2019
Lucky BrandRetailFloor 2
Project S00175617 Alteration · LOC Issued · 06/06/2019
JockeyRetailFloor 1
Project S00130453 Alteration · LOC Issued · 02/22/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 642 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch - Sign12
08/26/2026S00130453-I1Request digital key ↗
08/26/2026S00157586-I1Request digital key ↗
08/26/2026S00157596-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
08/26/2026S00206008-P1Request digital key ↗
08/26/2026S00267072-I1Request digital key ↗
08/25/2026S00383514-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch6
08/26/2026S00061551-I1Request digital key ↗
08/26/2026S00061563-I1Request digital key ↗
08/26/2026S00061561-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/25/2026S00441060-I1Request digital key ↗
08/25/2026S00348561-P1Request digital key ↗
08/15/2026S00348561-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026S00206030-I1Request digital key ↗
08/15/2026S00267079-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026S00381462-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026S00407684-I1Request digital key ↗
▸Applications & Permits123
▸BISPLAN / WORK APPROVAL APPLICATION75
11/18/2024520208800Open ↗
06/01/2023520362786Open ↗
06/01/2023520362795Open ↗
Showing 3 of 75 on file for this type
▸BISWORK PERMIT APPLICATION42
11/13/2020540186234Open ↗
08/21/2020540175861Open ↗
03/13/2020520394582Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/17/2020540175861Open ↗
08/12/2020540175861Open ↗
08/12/2020540175861Open ↗
▸BISDOT Permit - House Connection2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISFLOOD ZONE DESIGN CERTIFICATION3
07/14/2020540175861Open ↗
Showing 1 of 3 on file for this type
▸BISFLOOD ZONE COMPLIANCE3
05/02/2023520305492Open ↗
05/02/2023520305492Open ↗
06/14/2022540175861Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
12/17/2019520394582Open ↗
12/17/2019520208800Open ↗
12/17/2019520208800Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/07/2026S00061556-I1Open ↗
09/02/2026S00383514-P2Open ↗
09/02/2026S00383514-P2Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/26/2026S00061561-I1Open ↗
08/26/2026S00061556-I1Open ↗
08/26/2026S00130453-I1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/21/2020540186234Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026S00383514-P2Open ↗
08/31/2026S00383514-I1Open ↗
08/30/2026S00267079-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/14/2020540175861Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/21/2020540186234Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/21/2020540186234Open ↗
07/14/2020540175861Open ↗
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
12/17/2019520377119Open ↗
11/13/2019520269254Open ↗
10/22/2019520339893Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/29/2021520339893Open ↗
01/09/2020520208800Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
05/17/2023520305492Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/21/2022520374522Open ↗
▸BISSCHEDULE B - PLUMBING1
12/18/2020520374522Open ↗
▸BISHEATING SYSTEMS1
10/21/2022520374522Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/17/2023520208800Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
11/12/2019520394582Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
12/17/2019520394582Open ↗
12/17/2019520208800Open ↗
12/17/2019520208800Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/18/2023520386564Open ↗
10/21/2022520374522Open ↗
03/28/2022540175861Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/16/2020520339893Open ↗
11/12/2020520377119Open ↗
10/06/2020520394582Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/16/2020520339893Open ↗
11/12/2020520377119Open ↗
10/06/2020520394582Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
10/21/2022520374522Open ↗
▸BIS* HVAC INSULATION AND SEALING1
10/21/2022520374522Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY12
11/16/2020520339893Open ↗
11/16/2020520339884Open ↗
11/13/2020540186234Open ↗
Showing 3 of 12 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
12/14/2022540186234Open ↗
11/29/2022520374522Open ↗
▸DOB NOWHydrant Flow Test Letter2
08/26/2026S00267072-P1Open ↗
08/26/2026S00267072-I1Open ↗
▸DOB NOWHydraulic Flow Calculations2
08/26/2026S00267072-I1Open ↗
08/13/2026S00267072-P1Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS1
12/14/2022540186234Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/14/2022540186234Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs67
▸BISADMINISTRATIVE OBJECTIONS18
11/12/2019520394582Open ↗
Showing 1 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
11/14/2023520269254Open ↗
05/18/2023520386564Open ↗
05/18/2023520305492Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
01/21/2020520208800Open ↗
12/17/2019520208800Open ↗
10/16/2019520279225Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/13/2019520208800Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/25/2026S00407684-I1Open ↗
08/13/2026S00135796-I1Open ↗
08/13/2026S00206030-I1Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL4
05/18/2023520386564Open ↗
12/14/2022540186234Open ↗
11/29/2022520374522Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBSA/CPC APPROVAL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLetter from Homeowner for Withdrawal1
07/20/2020520339928Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT29
11/12/2020520377119Open ↗
10/21/2020540186234Open ↗
10/06/2020520394582Open ↗
Showing 3 of 29 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
10/25/2023520269254Open ↗
05/16/2023520386564Open ↗
05/05/2023520305492Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Filing & Intake Forms83
▸BISEFILING COVER SHEET28
11/12/2019520394582Open ↗
Showing 1 of 28 on file for this type
▸BISADDITIONAL INFORMATION26
07/01/2021540175861Open ↗
12/29/2020520374522Open ↗
12/22/2020520374522Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM25
01/14/2020520208800Open ↗
12/17/2019520208800Open ↗
12/13/2019520208800Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/21/2020540186234Open ↗
07/14/2020540175861Open ↗
Showing 2 of 4 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROOF OF FEE EXEMPTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
08/13/2026S00175617-I1Open ↗
08/13/2026S00130453-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
11/21/2019540160653Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
07/14/2020540175861Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/21/2020540186234Open ↗
▸BISMAINTENANCE INFORMATION1
10/21/2022520374522Open ↗