Two family brick
35 SIDNEY PLACE
BROOKLYN · BIN 3002575
💬 Discuss this project
1846Year Built
3Stories
B1Building Class
R6Zoning
5,191 sfGross Floor Area
2Units
Rent Stabilized11 Open Violations ▸
Two family brick · Owner of record: 35 SIDNEY PLACE LLC · 3,105 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 15 docs
Floor 41p · 1 filing · 4 docs
Floor 338p · 2 filings · 20 docs
Floor 241p · 3 filings · 20 docs
Floor 139p · 3 filings · 20 docs
Cellar44p · 5 filings · 20 docs
Basement35p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2020$5.5M—Private party → 35 SIDNEY PLACE LLC$1,060/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS603/21/2026
DI DIO ARCHITECTURE, PC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL CITY REMODELING, INCGeneral Contractor1803/21/2026
PROSTAR PLUMBING AND HEATPlumbing407/08/2026
PALCO MECHANICAL LLCGeneral Contractor107/08/2026
PROSTAR PLUMBING HEATGeneral Contractor103/22/2026
PRO STAR PLBG,HTG&MECH INPlumbing107/08/2026
MILL BROOK FIRE PROTECTIONFire Protection107/08/2026
ZONE MECHANICALPlumbing103/22/2026
HATCHET WORKS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVT ENGINEERING345604/09/2024
KENDALL ENGINEERING PC4154312/05/2021
Building Lifecycle
All (115)Filed (13)Permit Issued (14)Signed Off (5)Violation (11)Inspection (10)Objection (32)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
08/21/2025
Signed off — Alteration CO
foundation and structural work as per plans and IN conjunction with Alteration application
B00636134-S1
06/10/2025
Violation issued (HPD, open)
A
12/19/2024
Signed off — Alteration
Install (2) 5 Ton split system heating/cooling Mitsubishi Type system, install (1) 3 Ton split system heating/cooling Mitsubishi Type system and install (1) 4 Ton split system heating/cooling Mitsubishi Type system.
B00590441-I1
12/03/2024
Signed off — Alteration
Modifications to existing plumbing fixtures and installation of new plumbing fixtures.
B00590428-I1
11/25/2024
Violation issued (HPD, open)
I
07/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2024
Signed off — Alteration
B00590437-I1
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection resolved — Addressed
06/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2024
Objection raised — Scope
06/06/2024
Objection raised — Admin
05/30/2024
Filed — Alteration
Modifications to existing plumbing fixtures and installation of new plumbing fixtures.
B00590428-P3
05/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/11/2024
Violation issued (HPD, open)
A
04/09/2024
Filed — Alteration CO
foundation and structural work as per plans and IN conjunction with Alteration application
B00636134-P4
04/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
04/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
04/09/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
04/09/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
JOSEPH PASATURO
04/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/09/2024
Special inspection requirement — Sprayed fire-resistant materials
JOSEPH PASATURO
04/09/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JOSEPH PASATURO
04/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/20/2024
Objection raised — Admin
03/20/2024
Objection resolved — Addressed
03/15/2024
Permit issued — Earth Work
B00636134-S1-EA
03/12/2024
Filed — Alteration
Modifications to existing plumbing fixtures and installation of new plumbing fixtures.
B00590428-P2
03/11/2024
Permit issued — Plumbing
B00590428-I1-PL
03/07/2024
Permit issued — Structural
B00636134-S1-GC
02/27/2024
Objection resolved — Addressed
02/27/2024
Objection resolved — Addressed
02/08/2024
Objection resolved — Addressed
11/24/2023
Objection raised — Scope
11/24/2023
Objection raised — Structural
11/17/2023
Violation issued (HPD, open)
I
11/16/2023
Filed — Alteration
Modifications to existing plumbing fixtures and installation of new plumbing fixtures.
B00590428-P1
11/15/2023
Permit issued — General Construction
B00636134-I1-GC
10/17/2023
Permit issued — Mechanical Systems
B00590441-I1-MS
10/03/2023
Permit issued — Sprinklers
B00590437-I1-EW-SP
05/16/2023
Permit issued — Structural
B00636134-S1-FO
05/09/2023
Permit issued — Earth Work
B00636134-S1-GC
05/09/2023
Permit issued — Foundation
B00636134-S1-ST
03/24/2023
Violation issued (HPD, open)
A
03/10/2023
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Subgrade Inspections
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEVE LIN
03/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Structural Steel - Details
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Masonry
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH PASATURO
03/10/2023
Special inspection requirement — Structural Steel - Welding
JOSEPH PASATURO
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offALL CITY REMODELING, INC03/15/2024
DOB NOWPlumbingSigned-offPROSTAR PLUMBING AND HEAT03/11/2024
DOB NOWStructuralSigned-offALL CITY REMODELING, INC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedALL CITY REMODELING, INC11/15/2023
DOB NOWMechanical SystemsSigned-offPALCO MECHANICAL LLC10/17/2023
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC10/03/2023
DOB NOWStructuralSigned-offALL CITY REMODELING, INC05/16/2023
DOB NOWEarth WorkSigned-offALL CITY REMODELING, INC05/09/2023
DOB NOWFoundationSigned-offALL CITY REMODELING, INC05/09/2023
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN12/30/2022
DOB NOWStructuralSigned-offALL CITY REMODELING, INC07/18/2022
DOB NOWEarth WorkSigned-offALL CITY REMODELING, INC07/18/2022
DOB NOWEarth WorkSigned-offALL CITY REMODELING, INC06/10/2022
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP07/30/2021
1 project · most recent 03/27/2024
General Wiring
FiledStatusContractorScope
03/27/2024CompleteDIAMOND ELECTL SOLUTIONSGeneral Wiring
1 project · most recent 04/09/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
04/09/2024Signed-offALL CITY REMODELING, INCSteel, Concrete, Masonry, Wood
1 project · most recent 04/09/2024
Earthwork
FiledStatusContractorScope
04/09/2024Signed-offALL CITY REMODELING, INCEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
04/09/2024Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
04/09/2024Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
04/09/2024Energy Code Compliance InspectionsJOSEPH PASATUROprogress
04/09/2024Subsurface Investigations (Borings/Test Pits)JOSEPH PASATUROspecial
04/09/2024Structural Stability – Alterations of existing buildings—special
04/09/2024Sprayed fire-resistant materialsJOSEPH PASATUROspecial
04/09/2024Exterior Insulation and Finish Systems (EIFS)JOSEPH PASATUROspecial
03/10/2023Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
03/10/2023Subgrade InspectionsJOSEPH PASATUROspecial
03/10/2023Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
03/10/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
03/10/2023Structural Steel - DetailsJOSEPH PASATUROspecial
03/10/2023MasonryJOSEPH PASATUROspecial
03/10/2023Structural Steel - High Strength BoltingJOSEPH PASATUROspecial
03/10/2023Structural Steel - WeldingJOSEPH PASATUROspecial
03/10/2023Structural Cold-Formed SteelJOSEPH PASATUROspecial
03/10/2023Structural Wood FrameJOSEPH PASATUROprogress
03/10/2023FinalJohn Nucatolaprogress
03/10/2023Footing and FoundationJOSEPH PASATUROprogress
03/10/2023Post-installed AnchorsJOSEPH PASATUROspecial
10/20/2022HVAC-R and service water heating equipmentKEVIN KENDALLenergy_progress
10/20/2022Fire-Resistant Penetrations and JointsKEVIN KENDALLspecial
10/20/2022Mechanical SystemsKEVIN KENDALLspecial
10/20/2022Post-installed AnchorsKEVIN KENDALLspecial
10/20/2022Energy Code Compliance InspectionsKEVIN KENDALLprogress
Latest 25 of 47.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00561855-I1Request digital key ↗
08/31/2026B00590441-P1Request digital key ↗
08/31/2026B00590441-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/13/2026B00590428-I1Open ↗
08/13/2026B00636134-P4Open ↗
08/13/2026B00561855-I1Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00636134-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWSpecial Inspector Seal & Signature30
09/20/2026B00636134-P2Open ↗
09/20/2026B00636134-P2Open ↗
09/20/2026B00636134-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/20/2026B00636134-P2Open ↗
09/20/2026B00636134-P2Open ↗
08/30/2026B00590441-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00561855-I1Open ↗
08/31/2026B00590441-P1Open ↗
08/31/2026B00590441-I1Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/13/2026B00636134-S1Open ↗
08/13/2026B00636134-P1Open ↗
08/13/2026B00636134-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00636134-I1Open ↗
08/13/2026B00636134-S1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00636134-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/01/2026B00561855-I1Open ↗
08/31/2026B00590441-I1Open ↗
08/31/2026B00590428-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00590441-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT6
08/13/2026B00636134-I1Open ↗
08/13/2026B00636134-P2Open ↗
08/13/2026B00636134-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00636134-S1Open ↗
08/13/2026B00636134-I1Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification4
08/13/2026B00636134-P3Open ↗
08/13/2026B00636134-I1Open ↗
08/13/2026B00636134-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026B00636134-I1Open ↗
08/13/2026B00636134-P3Open ↗
08/13/2026B00636134-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00636134-S1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00636134-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00636134-I1Open ↗