← Back
Auto body / collision or auto repair
350 AVENUE Y
BROOKLYN · BIN 3195641
💬 Discuss this project
1931Year Built
1Stories
G2Building Class
M1-1Zoning
1,800 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Auto body / collision or auto repair · Owner of record: 354 AVENUE Y CORP · 6,000 sf lot · 0.3 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 13 docs
Floor 13p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
354 AVENUE Y103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC203/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422203/19/2026
WELLDONE INSPECTION INC.8628203/19/2026
Building Lifecycle
All (30)Filed (2)Violation (1)Objection (19)Special Inspection (8)
04/27/2026
Objection raised — Zoning
04/23/2026
Objection resolved — Resolved
04/09/2026
Objection raised — Zoning
04/08/2026
Objection resolved — Addressed
03/20/2026
Objection raised — Structural
03/19/2026
Filed — Alteration
HORIZONTAL EXTENSION OF EXISTING 1-STORY STUCCO, BRICK FACED AUTO REPAIR SHOP AS PER PLANS SUBMITTED. NO SPRAY BOOTH PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01194225-P1
11/29/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
11/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
11/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
11/29/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
11/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
11/29/2025
Special inspection requirement — Lowest Floor Elevation
QIUFAN JIANG
11/29/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
11/29/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
09/11/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Admin
07/11/2025
Objection resolved — Addressed
06/20/2025
Objection resolved — Addressed
06/20/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Scope
04/21/2025
Objection raised — Scope
04/21/2025
Objection raised — Scope
04/03/2025
Objection raised — Scope
03/23/2025
Objection raised — Cost
03/14/2025
Filed — Alteration
HORIZONTAL EXTENSION OF EXISTING 1-STORY STUCCO, BRICK FACED AUTO REPAIR SHOP AS PER PLANS SUBMITTED. NO SPRAY BOOTH PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01194225-I1
06/22/2001
Violation issued (FDNY_NOV, closed)
Nothing on file for this building.
3 jobs · most recent 01/09/2023
General Wiring
FiledStatusContractorScope
01/09/2023CompleteGEMINI ELECTRIC CO., INC.General Wiring
12/29/2022CompleteGEMINI ELECTRIC CO., INC.1 meters, 1 new_meters
12/29/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/29/2025Interior lighting powerSERDAR CEYLANenergy_progress
11/29/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
11/29/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
11/29/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/29/2025Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
11/29/2025Lowest Floor ElevationQIUFAN JIANGprogress
11/29/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
11/29/2025Lighting controlsSERDAR CEYLANenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01194225-I1Open ↗
08/13/2026B01194225-P1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01194225-P1Open ↗
09/01/2026B01194225-P1Open ↗
09/01/2026B01194225-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01194225-P1Open ↗
09/01/2026B01194225-P1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01194225-I1Open ↗
08/13/2026B01194225-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01194225-I1Open ↗
08/13/2026B01194225-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01194225-P1Open ↗
08/13/2026B01194225-I1Open ↗