Elevator cooperative
350 EAST 57 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1039987
💬 Discuss this project
1932Year Built
15Stories
D4Building Class
R10Zoning
75,512 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized19 Open Violations 17 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 350 E 57 ST CORP-C/O BHS · 6,950 sf lot · 10.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 20 docs
Floor 11Under Construction5p · 1 filing · 20 docs
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT1507/08/2026
350 E57 ST1403/22/2026
350 E 57TH ST703/22/2026
350 EAST 57 CORP103/22/2026
350 EAST 57 STREET CORP203/22/2026
WINDHAM CONTRACTING503/22/2026
350 EAST 57TH STREET1403/22/2026
GUMLEY HAFT603/21/2026
350 EAST 57TH ST CORP C O BROWN203/21/2026
350 E57 ST CORP C O GUMLEY-HAFT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAO STUDIOS203/21/2026
J A EXPEDITING1403/21/2026
DVA Advisors403/21/2026
PS ENGINEERS203/21/2026
CONVERSANO ASSOCIATES, INC.1003/21/2026
AE DESIGN SOLUTION203/21/2026
NYPL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIBUTE RESTORATION INCGeneral Contractor803/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor707/08/2026
TESTERMAN PLBG & HTG INCPlumbing307/08/2026
A S K ENTERPRISES INCGeneral Contractor307/08/2026
GREEN CONVERSIONS INCGeneral Contractor303/21/2026
PRO-REMODELING NYC INCGeneral Contractor303/21/2026
SAHARA CONTRACTING CORPGeneral Contractor207/03/2026
PARADISE CONSTRUCTION NYCGeneral Contractor207/03/2026
STEPHEN FOY MECH SVC CORPPlumbing107/08/2026
ANTHONY SARACENIElectrical103/21/2026
CRAIG, RISHIElectrical103/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing106/17/2026
SARACENI ANTHONYElectrical103/21/2026
SIMETI, SALVATOREElectrical103/21/2026
DRURY & LANE LLCGeneral Contractor107/08/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
PAUL BOCCIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE LIGHT CONSULTING &AM9394303/26/2026
SHADOW ARCHITECT, PC7962203/15/2023
JACK GREEN ASSOCIATES422507/14/2021
PSI AGENCY INC.254103/26/2021
Building Lifecycle
All (199)Filed (25)Permit Issued (25)Signed Off (12)Facade (FISP) (18)Violation (60)Inspection (9)Objection (20)Special Inspection (30)
07/01/2026
Permit issued — General Construction
M01344896-I1-GC
07/01/2026
Permit issued — Mechanical Systems
M01344896-S2-MS
06/02/2026
Permit issued — Mechanical Systems
M01344896-S2-MS
05/26/2026
Permit issued — General Construction
M01344896-I1-GC
05/22/2026
Permit issued — Plumbing
M01344896-S1-PL
03/26/2026
Filed — Alteration
The application is filed for mechanical work of a 2,000 sf apartment. Minor plumbing and general construction work filed separately. No change in use, bulk, egress, or occupancy.
M01344896-S2
03/26/2026
Filed — Alteration
The application is filed for mechanical work of a 2,000 sf apartment. Minor plumbing and general construction work filed separately. No change in use, bulk, egress, or occupancy.
M01344896-S1
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Scope
03/18/2026
Objection raised — Structural
03/18/2026
Objection raised — Structural
02/27/2026
Filed — Alteration
The application is filed for mechanical work of a 2,000 sf apartment. Minor plumbing and general construction work filed separately. No change in use, bulk, egress, or occupancy.
M01344896-I1
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Feng Li
02/23/2026
Special inspection requirement — Maintenance information
Feng Li
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Feng Li
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Feng Li
02/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Feng Li
02/02/2026
Cycle 10 facade report submitted
01/30/2026
Cycle 10 facade inspection completed
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Feng Li
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Feng Li
01/14/2026
Special inspection requirement — Final
Feng Li
01/14/2026
Special inspection requirement — Post-installed Anchors
Feng Li
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Feng Li
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Feng Li
01/13/2026
Cycle 10 facade report signed — SAFE
01/11/2026
Special inspection requirement — Mechanical Systems
Feng Li
01/11/2026
Special inspection requirement — Final
Feng Li
11/03/2025
Signed off — Alteration
Rigging for Industrial Rope Access
M01193445-I1
06/23/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Other
06/19/2025
Filed — Alteration
facade inspections
M01224735-I1
04/04/2025
Permit issued — Suspended Scaffold
M01193445-I1-SC
04/03/2025
Filed — Alteration
Rigging for Industrial Rope Access
M01193445-I1
12/12/2023
Signed off — Alteration
Plumbing work as shown on the plans.
M00484209-I1
12/06/2023
Signed off — Alteration
FILING APPLICATION FOR THE INTERIOR COMBINATION OF APARTMENTS 2B AND 2C ON THE SECOND FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00835544-I1
12/06/2023
Signed off — Alteration
PLUMBING WORK RELATED TO THE INTERIOR COMBINATION OF APARTMENTS 2B AND 2C ON THE SECOND FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00835545-I1
09/13/2023
Signed off — Alteration
FILING APPLICATION FOR THE RENOVATION OF APARTMENT 9A ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08018894-I1
09/13/2023
Signed off — Alteration
FILING APPLICATION FOR PLUMBING WORK RELATED TO THE RENOVATION OF APARTMENT 9A ON THE 9TH FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00843572-I1
08/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/21/2023
Filed — Alteration
Plumbing work as shown on the plans.
M00484209-P2
07/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Filed — Alteration
FILING APPLICATION FOR THE INTERIOR COMBINATION OF APARTMENTS 2B AND 2C ON THE SECOND FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00835544-P1
06/30/2023
Special inspection requirement — Lighting in dwelling units
Larry Cohn
06/30/2023
Special inspection requirement — Insulation placement and R values
Larry Cohn
06/30/2023
Special inspection requirement — Interior lighting power
Larry Cohn
06/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Larry Cohn
06/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Larry Cohn
06/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Larry Cohn
06/30/2023
Special inspection requirement — Lighting controls
Larry Cohn
06/30/2023
Special inspection requirement — Final
Larry Cohn
06/30/2023
Special inspection requirement — Fenestration air leakage
Larry Cohn
06/01/2023
Special inspection requirement — Lighting in dwelling units
Larry Cohn
06/01/2023
Special inspection requirement — Lighting controls
Larry Cohn
06/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Larry Cohn
06/01/2023
Special inspection requirement — Insulation placement and R values
Larry Cohn
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPARADISE CONSTRUCTION NYC07/01/2026
DOB NOWMechanical SystemsPermit IssuedPARADISE CONSTRUCTION NYC07/01/2026
DOB NOWMechanical SystemsPermit IssuedSAHARA CONTRACTING CORP06/02/2026
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONTRACTING CORP05/26/2026
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP05/22/2026
DOB NOWSuspended ScaffoldPermit IssuedCERINA GENERAL CONTR. INC04/04/2025
DOB NOWGeneral ConstructionSigned-offDRURY LANE05/04/2023
DOB NOWPlumbingSigned-offFOY MECH AND SONS LLC04/25/2023
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP04/06/2023
DOB NOWGeneral ConstructionSigned-offPRO-REMODELING NYC INC02/08/2023
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC12/12/2022
DOB NOWGeneral ConstructionSigned-offA S K ENTERPRISES INC10/29/2021
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC05/28/2021
DOB NOWGeneral ConstructionSigned-offA S K ENTERPRISES INC05/26/2021
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC03/25/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/23/2020
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC10/02/2020
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC05/15/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/30/2020
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC12/06/2019
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC10/29/2019
DOB NOWMechanical SystemsSigned-offGREEN CONVERSIONS INC10/24/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/10/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/12/2018
BISOTISSUEDTRIBUTE RESTORATION INC03/24/2021
BISOTISSUEDTRIBUTE RESTORATION INC10/01/2020
BISOTISSUEDTRIBUTE RESTORATION INC05/22/2020
BISOTISSUEDGREEN CONVERSIONS INC10/25/2019
BISOTISSUEDTRIBUTE RESTORATION INC10/02/2019
BISOTISSUEDGREEN CONVERSIONS INC07/08/2019
BISPLISSUEDTESTERMAN PLBG & HTG INC12/31/2018
BISMHISSUEDGREEN CONVERSIONS INC12/18/2018
BISOTISSUEDGREEN CONVERSIONS INC12/17/2018
BISOTISSUEDPRO-REMODELING NYC INC11/08/2017
BISPLISSUEDGREGG NY PLUMBING, INC09/01/2017
BISOTISSUEDPRO-REMODELING NYC INC08/25/2017
BISPLISSUEDSUPERB PLUMBING & HEATING11/04/2016
BISOTISSUEDELV INTERIOR RENOVATIONS07/26/2016
BISPLISSUEDR.J.C. MECHANICAL CORP07/22/2016
+ 35 more permits on file
1 project · most recent 03/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2026Permit IssuedPARADISE CONSTRUCTION NYCHeating and Air Conditioning Systems
Heat / Cool
Applied Comfort NYWE12K007P 12,500 BTU · Wshp ×4
1 project · most recent 03/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2026Permit IssuedA&H EXPRESS PLBG&HTG CORPGas, Water/Sanitary
10 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedS.E. ELECTL CONTNG CORPGeneral Wiring
07/08/2026Permit IssuedTRIBORO ELEC'L CONTR'G COGeneral Wiring
08/12/2023CompleteS.E. ELECTL CONTNG CORP—
04/17/2023CompleteS.E. ELECTL CONTNG CORPGeneral Wiring
02/03/2023CompleteLENS ELECTRIC, INC—
05/31/2021CompleteCAVAN ELECTRIC CORP.General Wiring
10/29/2019CompleteCAVAN ELECTRIC CORP.General Wiring
08/20/2019CompleteCAVAN ELECTRIC CORP.General Wiring
07/10/2018CompleteBOROWIDE ELECT'L CONTR'S—
03/23/2018Permit IssuedJLC ELEC'L CONTR'G INCGeneral Wiring
1 project · most recent 06/19/2025
FiledStatusContractorScope
06/19/2025———
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
02/23/2026HVAC-R and service water heating system controlsFeng Lienergy_progress
02/23/2026HVAC-R and service water piping design and insulationFeng Lienergy_progress
02/23/2026Fire-Resistant Penetrations and JointsFeng Lispecial
02/23/2026Maintenance informationFeng Lienergy_progress
02/23/2026HVAC-R and service water heating equipmentFeng Lienergy_progress
01/14/2026Tenant Protection Plan ComplianceFeng Lispecial
01/14/2026Post-installed AnchorsFeng Lispecial
01/14/2026Fire-Resistance Rated ConstructionFeng Liprogress
01/14/2026Energy Code Compliance InspectionsFeng Liprogress
01/14/2026Fire-Resistant Penetrations and JointsFeng Lispecial
01/14/2026FinalFeng Liprogress
01/11/2026Mechanical SystemsFeng Lispecial
01/11/2026FinalFeng Liprogress
06/30/2023Interior lighting powerLarry Cohnenergy_progress
06/30/2023Lighting in dwelling unitsLarry Cohnenergy_progress
06/30/2023Insulation placement and R valuesLarry Cohnenergy_progress
06/30/2023Lighting controlsLarry Cohnenergy_progress
06/30/2023Fire-Resistance Rated ConstructionLarry Cohnprogress
06/30/2023Energy Code Compliance InspectionsLarry Cohnprogress
06/30/2023FinalLarry Cohnprogress
06/30/2023Fenestration and door U-factor and product ratingsLarry Cohnenergy_progress
06/30/2023Fenestration air leakageLarry Cohnenergy_progress
06/01/2023Energy Code Compliance InspectionsLarry Cohnprogress
06/01/2023Fenestration and door U-factor and product ratingsLarry Cohnenergy_progress
06/01/2023Lighting in dwelling unitsLarry Cohnenergy_progress
Latest 25 of 73.
▾Documents — 454 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch18
09/06/2026M00060500-I1Request digital key ↗
09/04/2026M00483989-I1Request digital key ↗
09/04/2026M00484209-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00202465-P1Request digital key ↗
09/05/2026M00202465-I1Request digital key ↗
08/15/2026M00202465-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00202456-I1Request digital key ↗
09/04/2026M00202456-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00430651-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00270947-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION38
08/02/2019123713320Open ↗
04/03/2019123495137Open ↗
10/15/2018123375720Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION37
05/22/2020123495137Open ↗
10/25/2019123713320Open ↗
10/02/2019123495137Open ↗
Showing 3 of 37 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/30/2021123375720Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/31/2017122790122Open ↗
▸Seals & Professional Certifications130
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
10/24/2019123375720Open ↗
08/02/2019123713320Open ↗
12/17/2018123375720Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026M00202465-I1Open ↗
09/01/2026M00202465-I1Open ↗
09/01/2026M00202465-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00202465-P2Open ↗
09/05/2026M00202465-P1Open ↗
09/05/2026M00202465-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026M00843572-I1Open ↗
09/01/2026M00202465-I1Open ↗
09/01/2026M00202465-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
02/03/2015122251473Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/07/2016122790122Open ↗
02/03/2015122251473Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
10/15/2018123375720Open ↗
07/27/2017122781034Open ↗
06/06/2017122790122Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
10/05/2015140279954Open ↗
04/28/2015121738593Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan6
09/04/2026M00202456-P1Open ↗
08/13/2026M00202465-P2Open ↗
08/13/2026M00202465-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
08/02/2019123713320Open ↗
10/15/2018123375720Open ↗
10/11/2018123495137Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/05/2026M00202465-P1Open ↗
09/05/2026M00202465-I1Open ↗
09/04/2026M00202456-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/02/2019123713320Open ↗
04/03/2019123495137Open ↗
07/27/2017122781034Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00572488-I1Open ↗
08/18/2026M01344896-S2Open ↗
08/18/2026M01344896-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/17/2018123375720Open ↗
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
10/29/2019123375720Open ↗
10/24/2019123375720Open ↗
08/02/2019123713320Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
06/23/2021123495137Open ↗
03/17/2021123713320Open ↗
10/24/2019123375720Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/05/2021123495137Open ↗
03/17/2021123713320Open ↗
▸BISENERGY CODE 2ND REVIEW1
05/04/2015121738593Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00483989-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/23/2021123495137Open ↗
03/17/2021123713320Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
08/05/2021123495137Open ↗
03/17/2021123713320Open ↗
10/29/2019123375720Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/27/2017122718746Open ↗
09/27/2017122718746Open ↗
05/22/2017122473741Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/03/2015122251473Open ↗
Showing 1 of 5 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT32
08/05/2021123495137Open ↗
03/17/2021123713320Open ↗
10/24/2019123375720Open ↗
Showing 3 of 32 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
06/07/2016122790122Open ↗
09/14/2015122473741Open ↗
▸Filing & Intake Forms38
▸BISEFILING COVER SHEET15
08/02/2019123713320Open ↗
10/15/2018123375720Open ↗
10/11/2018123495137Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION15
03/08/2021123713320Open ↗
09/03/2019123713320Open ↗
06/06/2017122790122Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM6
10/29/2019123375720Open ↗
10/24/2019123375720Open ↗
02/27/2018122781034Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents6
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
08/13/2026M01224735-I1Open ↗
08/13/2026M01193445-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/11/2019123495137Open ↗