← Back
BuildNYC
Two stories - detached, small or mid-size
350 LIVERMORE AVENUE
STATEN ISLAND · BIN 5012650
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3XZoning
1,426 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed vertical enlargement of private residence2p · 1 filing · 20 docs
Floor 2Proposed vertical enlargement of private residence36p · 2 filings · 20 docs
Floor 1Proposed vertical enlargement of private residence35p · 2 filings · 20 docs
CellarProposed vertical enlargement of private residence36p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture601/19/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.M.C. ContractingGeneral Contractor203/21/2026
J.M.C. ContractingScaffold203/21/2026
Charles J. Dehart JR P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Think Design Architectural683501/19/2022
Building Lifecycle
03/17/2022
Signed off — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE VERTICAL ENLARGEMENT TO EXISITING 2-1/2 STORY SINGLE FAMILY DETACHED RESIDENCE AND INTERIOR RENOVATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00528417-I1
03/17/2022
Signed off — Alteration
Application is filed for the vertical enlargement to the 1 story portions of a 2 story frame, 1 family residence. No change in use, egress, or occupancy filed under this application. All work as per plan submitted herewith.
S00517694-I1
02/22/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/10/2022
Signed off — Alteration
Install Temporary Construction Fence.
S00525720-I1
02/08/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ.M.C. Contracting07/22/2021
DOB NOWPlumbingSigned-offCharles J. Dehart JR P&H06/30/2021
DOB NOWConstruction FenceSigned-offJ.M.C. Contracting06/09/2021
1 project · most recent 11/16/2021
General Wiring
FiledStatusContractorScope
11/16/2021CompleteRidge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/22/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/08/2022Pass-Final Fence Non-Directive 14PassView ↗
01/28/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/12/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
01/20/2022Structural Stability – Alterations of existing buildingsFrank Martarella IIIspecial
01/20/2022FinalFrank Martarella IIIprogress
01/20/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
01/20/2022Permanent certificateFrank Martarella IIIenergy_progress
01/20/2022Lighting in dwelling unitsFrank Martarella IIIenergy_progress
01/20/2022HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
01/20/2022Air barrier - visual inspectionFrank Martarella IIIenergy_progress
01/20/2022Insulation placement and R valuesFrank Martarella IIIenergy_progress
01/20/2022HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
01/20/2022Fenestration and door U-factor and product ratingsFrank Martarella IIIenergy_progress
01/20/2022HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
01/20/2022Fenestration areasFrank Martarella IIIenergy_progress
01/20/2022Mechanical SystemsFrank Martarella IIIspecial
01/20/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/20/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
01/20/2022Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
11/12/2021Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
11/12/2021Energy Code Compliance InspectionsFrank Martarella IIIprogress
11/12/2021Maintenance informationFrank Martarella IIIenergy_progress
11/04/2021Maintenance informationFrank Martarella IIIenergy_progress
11/04/2021Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
11/04/2021Mechanical SystemsFrank Martarella IIIspecial
11/04/2021Structural Stability – Alterations of existing buildingsFrank Martarella IIIspecial
11/04/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/04/2021Energy Code Compliance InspectionsFrank Martarella IIIprogress
Latest 25 of 38.
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account