BuildNYC
Multi-story retail building (2+)
Arts Horizons Leroy Neiman Art Center
350 WEST 125TH STREET · Morningside Heights · BIN 1059300
💬 Discuss this project
1955Year Built
2Stories
K2Building Class
C4-4DZoning
21,716 sfGross Floor Area
15Units
2 Active Violations 2 old, status unconfirmed ▸
Multi-story retail building (2+) · Owner of record: 350 West 125 Street · 11,908 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFata Organization, Pizza Hut8p · 3 filings · 20 docs
Floor 2Emly's9p · 3 filings · 20 docs
Floor 1McDonald's USA, Pizza Hut +156p · 7 filings · 20 docs
CellarIarlem Independent Livng Center14p · 2 filings · 20 docs
Site & exteriorPizza Hut, Chase +24p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
350 West 125th Street4603/21/2026
Fata Organization2307/08/2026
McDonalds1507/08/2026
Rojo Associates1407/08/2026
350 W 125 St603/21/2026
Fata Realty503/21/2026
350 Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Giuseppe Anzalone107/21/2025
Poly Engineer104/22/2025
AECOM Technical Services101/29/2025
AECOM101/29/2025
Marin Architects401/15/2025
Richard Wainer Architect412/20/2023
Max Gordon Architects111/16/2023
Alberto Roman110/01/2020
Shaaban Engineering309/03/2020
Architectural Solutions104/01/2020
Associates108/09/2019
Salvator A. Caradonna JR107/30/2019
Concept Design Group105/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A Interior Design203/21/2026
D R Brown803/21/2026
New York Design Architect203/21/2026
Marin Architects403/21/2026
All in Permit Consultants103/21/2026
Architectural Solutions103/21/2026
Kazam Consultants603/21/2026
Concept Design Group103/21/2026
Milrose Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Efficient Climate SolutioGeneral Contractor603/21/2026
Balaton ConsultingSign hanger407/08/2026
National MaintenanceSign hanger307/08/2026
Vik XS ServicesGeneral Contractor203/21/2026
Rasco ContractingGeneral Contractor203/21/2026
M-Pak ConstructionGeneral Contractor207/08/2026
Fibertek Data & ElectricElectrical103/21/2026
CK Cooling & Heatingspecialty_contractor104/09/2026
Dann YanteGeneral Contractor107/08/2026
MSB Plumbing ContractorsGeneral Contractor103/21/2026
Selmani AgronGeneral Contractor103/21/2026
SJG ConstructionGeneral Contractor107/08/2026
Seleucia ContractingScaffold107/08/2026
N.Y. Sign ArtSign hanger107/08/2026
Joey Electrical CoElectrical103/21/2026
A P Plumbing & HeatingPlumbing107/08/2026
City Electrical Sign ErectorsElectrical103/22/2026
Midway ElectricElectrical103/21/2026
Lim YoungElectrical103/21/2026
Patriot ElectricElectrical103/22/2026
Amp Power Electric ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Poly Engineer6110104/22/2025
Catalpa Special Inspectio2004101/29/2025
Z & T Engineering591107/03/2023
AR-Tech Engineering6659110/01/2020
Architectural Solutions3959104/01/2020
Municipal Testing Laborat230108/09/2019
Building Lifecycle
All (129)Filed (21)Permit Issued (19)Signed Off (13)Violation (42)Objection (4)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2025
Signed off — Alteration
Interior renovation of pizza shop/take-out with commercial kitchen on ground floor. Install a new kitchen hood, exhaust fan and associated ductwork as per plans. No change to use, occupancy or egress under this application.
M00894828-I1
10/20/2025
Signed off — Alteration
Installation of plumbing fixtures and associated piping as per drawings submitted. Filed herewith for pizza shop/take-out only with commercial kitchen.
M00895805-I1
10/14/2025
Signed off — Alteration
M01255447-I1
08/15/2025
Permit issued — General Construction
M01255447-I1-GC
07/21/2025
Filed — Alteration
M01255447-I1
05/29/2025
Permit issued — General Construction
M01138837-I1-GC-CX
04/22/2025
Filed — Alteration
INTERIOR RENOVATION IN PARTIAL CELLAR STE#21 OF EXISTING OFFICE (HARLEM INDEPENDENT LIVING CENTER INC) AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
M01138837-I1
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
De Gao
04/04/2025
Special inspection requirement — Interior lighting power
De Gao
04/04/2025
Special inspection requirement — Lighting controls
De Gao
02/21/2025
Permit issued — General Construction
M01169964-I1-GC
01/29/2025
Filed — Alteration
M01169964-I1
01/29/2025
Filed — Alteration
M01169994-I1
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
01/21/2025
Special inspection requirement — Interior lighting power
ABIGAIL BENJAMIN
01/21/2025
Special inspection requirement — Final
ABIGAIL BENJAMIN
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
ABIGAIL BENJAMIN
01/21/2025
Special inspection requirement — Lighting controls
ABIGAIL BENJAMIN
01/15/2025
Filed — Alteration
Installation of plumbing fixtures and associated piping as per drawings submitted. Filed herewith for pizza shop/take-out only with commercial kitchen.
M00895805-P2
11/20/2024
Filed — Alteration
Installation of plumbing fixtures and associated piping as per drawings submitted. Filed herewith for pizza shop/take-out only with commercial kitchen.
M00895805-P1
11/07/2024
Special inspection requirement — Mechanical Systems
De Gao
11/07/2024
Special inspection requirement — Final
De Gao
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/12/2024
Signed off — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
M00974467-I1
04/18/2024
Permit issued — General Construction
M00894828-I1-GC-CX
01/08/2024
Permit issued — Mechanical Systems
M00894828-I1-GC-CX
01/05/2024
Permit issued — Sign
M00974467-I1-SG
12/20/2023
Filed — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
M00974467-I1
12/19/2023
Special inspection requirement — Final
Richard Wainer
12/07/2023
Signed off — Alteration
Partial replacement of storefront at first floor, limited to 1 bay including entrance doors. No change in use, egress or occupancy.
M00956959-I1
11/21/2023
Permit issued — General Construction
M00956959-I1-GC
11/16/2023
Filed — Alteration
Partial replacement of storefront at first floor, limited to 1 bay including entrance doors. No change in use, egress or occupancy.
M00956959-I1
11/02/2023
Special inspection requirement — Vestibules
David Anderson
11/02/2023
Special inspection requirement — Final
David Anderson
11/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
David Anderson
10/02/2023
Objection resolved — Addressed
10/02/2023
Objection resolved — Addressed
07/13/2023
Objection raised — Plumbing
07/13/2023
Objection raised — Admin
07/03/2023
Filed — Alteration
Interior renovation of pizza shop/take-out with commercial kitchen on ground floor. Install a new kitchen hood, exhaust fan and associated ductwork as per plans. No change to use, occupancy or egress under this application.
M00894828-I1
07/03/2023
Filed — Alteration
Installation of plumbing fixtures and associated piping as per drawings submitted. Filed herewith for pizza shop/take-out only with commercial kitchen.
M00895805-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2023
Special inspection requirement — Heating Systems
Fei Zeng
06/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
Fei Zeng
06/28/2023
Special inspection requirement — Interior lighting power
Fei Zeng
06/28/2023
Special inspection requirement — Lighting controls
Fei Zeng
06/27/2023
Special inspection requirement — Shutoff dampers
Fei Zeng
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
06/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
06/27/2023
Special inspection requirement — Preliminary
Fei Zeng
06/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
06/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
06/27/2023
Special inspection requirement — Maintenance information
Fei Zeng
06/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
06/27/2023
Special inspection requirement — Ventilation and air distribution system
Fei Zeng
06/22/2023
Special inspection requirement — Final
Fei Zeng
06/22/2023
Special inspection requirement — Mechanical Systems
Fei Zeng
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSJG Construction08/15/2025
DOB NOWGeneral ConstructionPermit IssuedCK Cooling Heating05/29/2025
DOB NOWGeneral ConstructionPermit IssuedRasco Contracting02/21/2025
DOB NOWGeneral ConstructionSigned-offM-Pak Construction04/18/2024
DOB NOWMechanical SystemsSigned-offM-Pak Construction01/08/2024
DOB NOWSignSigned-offSkanska Building01/05/2024
DOB NOWGeneral ConstructionSigned-offVik XS Services11/21/2023
DOB NOWMechanical SystemsSigned-offDann Yante01/26/2021
DOB NOWSignSigned-offNational Maintenance09/10/2020
DOB NOWSignSigned-offNational Maintenance09/08/2020
DOB NOWSignSigned-offNational Maintenance09/08/2020
DOB NOWMechanical SystemsPermit IssuedEfficient Climate Solutio06/24/2020
DOB NOWPlumbingSigned-offA P Plumbing & Heating06/09/2020
DOB NOWMechanical SystemsPermit IssuedEfficient Climate Solutio10/29/2019
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co09/03/2019
DOB NOWConstruction FenceSigned-offSeleucia Contracting05/29/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/10/2018
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/10/2018
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/06/2018
BIS—ISSUEDAmbrosino Construction01/18/2022
BISOTISSUEDMkon Construction06/15/2020
BISPLRE-ISSUEDL.L.G. Plumbing & Heating06/21/2019
BISOTISSUEDSeleucia Contracting06/12/2019
BISMHISSUEDCentral Air Conditioning07/30/2018
BISOTISSUEDNorth Shore Neon Sign05/24/2018
BISPLISSUEDJ. Caiazzo Plumbing & Heating03/22/2018
BISMHISSUEDTom Rectenwald Construction03/20/2018
BISOTISSUEDTom Rectenwald Construction03/09/2018
BISPLISSUEDFountain of Trevi02/07/2017
BISOTISSUEDAmbrosino Construction12/06/2016
BISFBISSUEDG Bassolino PLB03/31/2016
BISBLISSUEDJ. Caiazzo Plumbing & Heating03/30/2016
BIS—ISSUEDUnitech Design11/27/2015
BISPLISSUEDSo Plumbing & Heating11/16/2015
BISFPISSUEDUnique Fire Systems11/12/2015
BISMHISSUEDJFZ Construction10/30/2015
BISOTISSUEDJFZ Construction10/15/2015
BISOTISSUEDAmbrosino Construction07/16/2015
BISOTISSUEDAmbrosino Construction07/07/2015
BISEQISSUEDColgate Enterprise06/24/2015
+ 29 more permits on file
1 project · most recent 08/09/2019
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/09/2019Permit IssuedEfficient Climate SolutioAir Conditioning Systems, Associated Ducts and Piping
Cooling
Daikin PUMY/PLFY 17,000 BTU ×13
PUMY 66,000 BTU ×6
1 project · most recent 04/01/2020
Water/Sanitary
FiledStatusContractorScope
04/01/2020Signed-offA P Plumbing & HeatingWater/Sanitary
15 projects · most recent 10/02/2025
General Wiring Lighting
FiledStatusContractorScope
10/02/2025Permit IssuedAmp Power Electric ServiceGeneral Wiring
06/13/2024Permit IssuedTF ElectricalGeneral Wiring
03/08/2024CompleteAll Pro Electric of N.Y—
02/27/2024CompleteKenneth ElectricGeneral Wiring
05/23/2022CompleteJ.A. Lee Electric Services—
03/04/2022CompleteDouble "R" Electrical Contracting—
09/20/2019CompleteGlendale Electl ContngGeneral Wiring
08/29/2019Permit IssuedRobert S. Covello—
05/21/2019Permit IssuedBLZ ElectricGeneral Wiring
03/27/2019CompleteAlef Electrical Contracting—
06/26/2018CompleteValentis ElectricLighting
04/05/2018CompleteCity Electrical Sign Erectors—
04/05/2018CompleteCity Electrical Sign Erectors—
04/05/2018CompleteCity Electrical Sign Erectors—
03/16/2018CompletePatriot ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/04/2025Fire-Resistant Penetrations and JointsDe Gaospecial
04/04/2025Interior lighting powerDe Gaoenergy_progress
04/04/2025Lighting controlsDe Gaoenergy_progress
01/22/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/21/2025Interior lighting powerABIGAIL BENJAMINenergy_progress
01/21/2025FinalABIGAIL BENJAMINprogress
01/21/2025Energy Code Compliance InspectionsABIGAIL BENJAMINprogress
01/21/2025Lighting controlsABIGAIL BENJAMINenergy_progress
11/07/2024Mechanical SystemsDe Gaospecial
11/07/2024FinalDe Gaoprogress
12/19/2023FinalRichard Wainerprogress
11/02/2023VestibulesDavid Andersonenergy_progress
11/02/2023FinalDavid Andersonprogress
11/02/2023Fenestration and door U-factor and product ratingsDavid Andersonenergy_progress
06/29/2023Heating SystemsFei Zengspecial
06/28/2023Duct leakage testing, insulation and designFei Zengenergy_progress
06/28/2023Interior lighting powerFei Zengenergy_progress
06/28/2023Lighting controlsFei Zengenergy_progress
06/27/2023Shutoff dampersFei Zengenergy_progress
06/27/2023Fire-Resistant Penetrations and JointsFei Zengspecial
06/27/2023Energy Code Compliance InspectionsFei Zengprogress
06/27/2023PreliminaryFei Zengprogress
06/27/2023HVAC-R and service water heating system controlsFei Zengenergy_progress
06/27/2023HVAC-R and service water piping design and insulationFei Zengenergy_progress
06/27/2023Maintenance informationFei Zengenergy_progress
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fata OrganizationUnknownRoof
Project M01255447 Alteration · LOC Issued · 07/21/2025
Iarlem Independent Livng CenterOfficeCellar
Project M01138837 Alteration · Permit Entire · 04/22/2025
McDonald's USARestaurant / Food ServiceFloor 1
Project M01169964 Alteration · Permit Entire · 01/29/2025
Project M01169994 Alteration · Approved · 01/29/2025
Project M00028411 Alteration · LOC Issued · 04/06/2018
Project M00028414 Alteration · LOC Issued · 04/06/2018
Project M00028407 Alteration · LOC Issued · 03/27/2018
Pizza HutRestaurant / Food ServiceFloor 1
Project M00974467 Alteration · LOC Issued · 12/20/2023
Project M00894828 Alteration · LOC Issued · 07/03/2023
Project M00895805 Alteration · LOC Issued · 07/03/2023
Chase BankBank / Financial branchFloor 1
Project M00956959 Alteration · LOC Issued · 11/16/2023
Project M00389916 Alteration · LOC Issued · 09/03/2020
Emly'sPersonal servicesFloor 2
Project M00387027 Alteration · LOC Issued · 10/01/2020
ChaseBank / Financial branch—
Project M00389909 Alteration · LOC Issued · 09/03/2020
Project M00389915 Alteration · LOC Issued · 09/03/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 567 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch13
09/06/2026M00028407-I1Request digital key ↗
09/06/2026M00028411-I1Request digital key ↗
09/06/2026M00028414-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/05/2026M00179666-I1Request digital key ↗
09/04/2026M00389915-I1Request digital key ↗
09/04/2026M00389916-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00196579-I1Request digital key ↗
09/04/2026M00387027-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00339175-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00172698-I1Request digital key ↗
▸Applications & Permits86
▸BISWORK PERMIT APPLICATION44
01/19/2022102458458Open ↗
12/29/2021102458458Open ↗
06/15/2020123573436Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
10/26/2021102458458Open ↗
08/27/2020140850817Open ↗
08/23/2020140850817Open ↗
Showing 3 of 42 on file for this type
▸Seals & Professional Certifications161
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
03/10/2020123573436Open ↗
11/19/2019140070027Open ↗
10/25/2019123163021Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/05/2026M01169964-I1Open ↗
09/05/2026M01169964-I1Open ↗
09/05/2026M01169964-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00028411-I1Open ↗
09/06/2026M00028414-I1Open ↗
09/05/2026M00179666-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
03/10/2020123573436Open ↗
06/25/2019123736190Open ↗
06/10/2019140850817Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
03/10/2020123573436Open ↗
06/25/2019123736190Open ↗
07/24/2018123484586Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/05/2026M01169964-I1Open ↗
09/02/2026M00387027-I1Open ↗
09/02/2026M00387027-I1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment34
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/25/2019123736190Open ↗
01/17/2018123163021Open ↗
12/15/2016122454717Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
06/10/2019140850808Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
12/27/2016122640197Open ↗
06/24/2016122640197Open ↗
06/24/2016122640197Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
08/31/2020140850817Open ↗
08/23/2019123484586Open ↗
08/01/2019123484586Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
08/31/2020140850817Open ↗
08/23/2019123484586Open ↗
08/01/2019123484586Open ↗
Showing 3 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
02/10/2016122543676Open ↗
▸Environmental & Asbestos80
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/06/2026M00028411-I1Open ↗
09/06/2026M00028414-I1Open ↗
09/05/2026M00179666-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice to Proceed16
09/06/2026M00028411-I1Open ↗
09/06/2026M00028414-I1Open ↗
09/05/2026M00179666-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
03/10/2020123573436Open ↗
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
09/06/2026M00028411-I1Open ↗
09/06/2026M00028414-I1Open ↗
08/13/2026M00172698-I1Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED10
03/16/2020123573436Open ↗
06/25/2019123736190Open ↗
06/10/2019140850817Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
08/31/2020140850817Open ↗
08/19/2020140850808Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/25/2019123736190Open ↗
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
11/19/2019140070027Open ↗
10/25/2019123163021Open ↗
08/01/2019123484586Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
08/31/2020140850817Open ↗
11/19/2019140070027Open ↗
10/25/2019123163021Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/31/2020140850817Open ↗
08/19/2020140850808Open ↗
06/10/2019140850817Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
Showing 2 of 3 on file for this type
▸BISNYCECC ANALYSIS2
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/19/2020140850808Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/31/2020140850817Open ↗
08/19/2020140850808Open ↗
06/10/2019140850817Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
08/31/2020140850817Open ↗
08/19/2020140850808Open ↗
12/03/2019101120779Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/15/2019140070027Open ↗
02/01/2018123163021Open ↗
11/08/2017122066584Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT40
03/10/2020123573436Open ↗
11/19/2019140070027Open ↗
10/25/2019123163021Open ↗
Showing 3 of 40 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
06/12/2019140850808Open ↗
06/12/2019140850817Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
08/31/2020140850817Open ↗
08/19/2020140850808Open ↗
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET20
03/10/2020123573436Open ↗
06/25/2019123736190Open ↗
07/24/2018123484586Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION11
08/27/2020140850817Open ↗
11/15/2019140070027Open ↗
12/27/2016122640197Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM11
12/03/2019101120779Open ↗
11/19/2019140070027Open ↗
10/25/2019123163021Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
06/10/2019140850817Open ↗
06/10/2019140850808Open ↗
Showing 2 of 4 on file for this type
▸Other Documents9
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type