← Back
Hostel - dormitory-like with shared rooms
New York Hotel
350 WEST 88 STREET · BIN 1033993
💬 Discuss this project
1910Year Built
8Stories
HHBuilding Class
R8Zoning
48,327 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFEFDNY Report ↗
Hostel - dormitory-like with shared rooms · Owner of record: 350 REALTY CO · 7,553 sf lot · 6.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS503/22/2026
350 REALTY4303/22/2026
360 REALTY103/22/2026
350 WEST 88TH STREET REAL103/22/2026
350 WEST 88 ST LLC203/22/2026
THE OWNER OF103/22/2026
HOTEL MANAGEMENT ENTER103/22/2026
1020 HOTEL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RICHARD KOENIGSBERG107/15/2024
ASHRAF CORP105/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
KMA DESIGNS LLC203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DK BUILDERS INCGeneral Contractor303/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
RICHARD DANTSITSElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KOENIGSBERG ENGINEERING,2247107/15/2024
SANDEEP GUNNALA ENGINEERI8482107/15/2024
Building Lifecycle
All (93)Filed (4)Permit Issued (4)Signed Off (4)Facade (FISP) (17)Violation (60)Special Inspection (4)
02/05/2026
Violation issued (ECB, closed)
Construction
07/25/2025
Signed off — Alteration
M01201636-I1
06/19/2025
Cycle 10 facade report submitted
06/19/2025
Cycle 10 facade report signed — SAFE
05/02/2025
Cycle 10 facade inspection completed
04/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01055028-I1
04/02/2025
Permit issued — Suspended Scaffold
M01201636-I1-SC
03/27/2025
Filed — Alteration
M01201636-I1
03/25/2025
Signed off — Alteration
Exterior Restoration consisting of Installation of StoPowerwall Stucco System as per plans filed herewith. no change to use, egress or occupancy.
M01040404-I1
03/05/2025
Signed off — Alteration
M01047927-I1
09/26/2024
Violation issued (ECB, closed)
Construction
09/26/2024
Violation issued (ECB, closed)
Construction
09/26/2024
Violation issued (ECB, closed)
Construction
09/17/2024
Violation issued (ECB, closed)
Unknown
09/17/2024
Violation issued (ECB, closed)
Unknown
09/17/2024
Violation issued (ECB, closed)
Unknown
09/06/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Violation issued (ECB, closed)
Construction
08/08/2024
Permit issued — General Construction
M01040404-I1-GC
07/31/2024
Violation issued (ECB, closed)
Construction
07/15/2024
Filed — Alteration
Exterior Restoration consisting of Installation of StoPowerwall Stucco System as per plans filed herewith. no change to use, egress or occupancy.
M01040404-I1
05/28/2024
Permit issued — Sidewalk Shed
M01055028-I1-SH
05/24/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01055028-I1
05/22/2024
Permit issued — Suspended Scaffold
M01047927-I1-SC
05/08/2024
Filed — Alteration
M01047927-I1
04/23/2024
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
04/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
RICHARD KOENIGSBERG
04/23/2024
Special inspection requirement — Final
RICHARD KOENIGSBERG
03/26/2024
Violation issued (ECB, closed)
Construction
12/19/2023
Violation issued (ECB, closed)
Construction
10/19/2023
Violation issued (HPD, closed)
C
09/06/2022
Cycle 9 facade report signed — SAFE
07/08/2022
Cycle 9 facade inspection completed
06/17/2022
Cycle 9 facade report submitted
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2019
Violation issued (ECB, closed)
Construction
06/15/2019
Cycle 8 facade report signed — SAFE
05/24/2019
Violation issued (ECB, closed)
Construction
05/23/2019
Cycle 8 facade report submitted
05/01/2019
Cycle 8 facade inspection completed
12/05/2018
Violation issued (ECB, closed)
Local Law
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
C
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
A
05/24/2018
Violation issued (HPD, closed)
A
01/25/2017
Cycle 8 facade report submitted
01/25/2017
Cycle 8 facade report signed — UNSAFE
01/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2017
Cycle 8 facade inspection completed
10/26/2016
Violation issued (HPD, closed)
I
06/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC04/02/2025
DOB NOWGeneral ConstructionSigned-offDK BUILDERS INC08/08/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS05/28/2024
DOB NOWSuspended ScaffoldPermit IssuedRK CONTRACTING INC05/22/2024
BISPLISSUEDCOPPER PLUMBING INC11/16/2018
BISOTISSUEDBUILD UP RESTORATION LLC06/26/2018
BISOTISSUEDGREY STONE RESTORATION06/13/2018
BISPLISSUEDARIANA CONTRACTING INC03/26/2018
BISEQISSUEDJASCO, INC03/23/2018
BISOTISSUEDBUILD UP RESTORATION LLC03/20/2018
BISEQISSUEDRJ HIGH SKY LLC12/06/2017
BISOTISSUEDGREY STONE RESTORATION04/10/2017
BISEQISSUEDRJ HIGH SKY LLC12/08/2016
BISMHISSUEDALL TECH MECHANICAL INC01/29/2014
BISEQISSUEDOUTDOOR INSTALLATIONS LLC07/27/2009
BISPLISSUEDTHE RIGHT CONNECTION P&H05/21/2003
BISPLISSUEDTHE RIGHT CONNECTION P&H01/09/2002
BISOTISSUEDTROJAN CONSTRUCTION CORP.11/02/2000
BISOTISSUEDTROJAN CONSTRUCTION CORP.08/31/2000
BIS—ISSUEDTROJAN CONSTRUCTION CORP.08/30/2000
BISEQISSUEDHI TECH BRIDGING INC05/16/2000
BISOTRE-ISSUED350 W 88 ST RLTY CO. INC.02/08/1996
BISPLISSUEDBLETSAS PLBNG & HTG CORP02/21/1995
2 projects · most recent 09/25/2024
General Wiring
FiledStatusContractorScope
09/25/2024CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
05/28/2024CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/23/2024MasonryRICHARD KOENIGSBERGspecial
04/23/2024Tenant Protection Plan ComplianceSandeep Gunnalaspecial
04/23/2024Energy Code Compliance InspectionsRICHARD KOENIGSBERGprogress
04/23/2024FinalRICHARD KOENIGSBERGprogress
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026M01047927-I1Request digital key ↗
08/27/2026M01055028-I1Request digital key ↗
08/24/2026M01201636-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION21
07/02/2019140623564Open ↗
06/26/2019140581804Open ↗
06/18/2019140623564Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION13
11/16/2018123170843Open ↗
06/26/2018123170843Open ↗
06/26/2018123170843Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT (EQ) PERMITS1
01/31/2014140138937Open ↗
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/05/2019140623564Open ↗
05/17/2019123170843Open ↗
05/17/2019123170843Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/03/2018123456991Open ↗
04/24/2018123456991Open ↗
04/07/2017140623564Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/07/2017140623564Open ↗
12/06/2016140581804Open ↗
10/11/2016140557467Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/07/2017140623564Open ↗
12/06/2016140581804Open ↗
10/11/2016140557467Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/03/2018123456991Open ↗
04/24/2018123456991Open ↗
07/27/2009120118112Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01055028-I1Open ↗
08/13/2026M01040404-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026M01040404-I1Open ↗
09/28/2026M01040404-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026M01040404-I1Open ↗
09/28/2026M01040404-I1Open ↗
▸BISApplicant / Owner Signature1
12/05/2013140138937Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/27/2009120118112Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS3
03/25/2014140138937Open ↗
03/25/2014140138937Open ↗
03/19/2014140138937Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
03/25/2014140138937Open ↗
03/10/2014140138937Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/14/2018123170843Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
05/03/2018123456991Open ↗
03/14/2018123170843Open ↗
12/08/2016140581804Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/05/2013140138937Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/13/2018123456991Open ↗
04/25/2018123456991Open ↗
02/14/2018123170843Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/02/2014140138937Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/27/2009120118112Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01040404-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/05/2019140623564Open ↗
05/17/2019123170843Open ↗
04/10/2019123456991Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/05/2019140623564Open ↗
05/17/2019123170843Open ↗
04/10/2019123456991Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/07/2017140623564Open ↗
10/11/2016140557467Open ↗
▸BISTR8: Energy Code Progress Inspections2
03/25/2014140138937Open ↗
01/02/2014140138937Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/06/2016140581804Open ↗
▸Inspections & Test Reports5
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
08/02/2019140581804Open ↗
07/05/2019140623564Open ↗
06/24/2019140581804Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/07/2017140623564Open ↗
10/11/2016140557467Open ↗
▸Approvals, Objections & Sign-offs18
▸BISLANDMARKS APPROVAL6
06/13/2018123456991Open ↗
03/15/2018123170843Open ↗
04/07/2017140623564Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/02/2019140581804Open ↗
07/05/2019140623564Open ↗
06/24/2019140581804Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/08/2019123456991Open ↗
03/26/2018140581804Open ↗
▸BISSUPERSEDING LETTER1
03/26/2018140581804Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/27/2009120118112Open ↗
▸BISSHED LETTER1
12/12/2017140581804Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01040404-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
07/05/2019140623564Open ↗
05/17/2019123170843Open ↗
04/10/2019123456991Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms26
▸BISBOROUGH INTAKE FORM12
08/02/2019140581804Open ↗
07/05/2019140623564Open ↗
06/24/2019140581804Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION6
07/05/2019140623564Open ↗
04/09/2019123170843Open ↗
09/13/2018123170843Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
05/03/2018123456991Open ↗
04/24/2018123456991Open ↗
02/14/2018123170843Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/07/2017140623564Open ↗
12/06/2016140581804Open ↗
10/11/2016140557467Open ↗
Showing 3 of 4 on file for this type
▸Other Documents6
▸DOB NOWCalculations2
08/13/2026M01201636-I1Open ↗
08/13/2026M01047927-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01201636-I1Open ↗
08/13/2026M01047927-I1Open ↗
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
04/24/2018123456991Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/18/2019140623564Open ↗