← Back
Primarily 1 family with 1 store or office
3500 FILLMORE AVENUE
BROOKLYN · BIN 3240131
💬 Discuss this project
1928Year Built
2Stories
S1Building Class
R4Zoning
2,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 3517 HOLDINGS LLC · 1,700 sf lot · 1.18 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PH ENTERPRISES LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABEJA ENGINEERING PLLC108/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN PROCURE BUILD LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269108/28/2023
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Violation (4)Special Inspection (4)
10/27/2023
Violation issued (ECB, closed)
Zoning
10/27/2023
Violation issued (ECB, closed)
Construction
09/11/2023
Permit issued — General Construction
B00907045-I1-GC
08/28/2023
Filed — Alteration
B00907045-I1
07/19/2023
Special inspection requirement — Concrete - Cast-In-Place
JOHANN VELEZ
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
07/19/2023
Special inspection requirement — Masonry
JOHANN VELEZ
07/19/2023
Special inspection requirement — Final
JOHANN VELEZ
06/26/2023
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
02/18/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDESIGN PROCURE BUILD09/11/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/19/2023Concrete - Cast-In-PlaceJOHANN VELEZspecial
07/19/2023Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/19/2023MasonryJOHANN VELEZspecial
07/19/2023FinalJOHANN VELEZprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00907045-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B00907045-I1Open ↗
08/25/2026B00907045-I1Open ↗
08/25/2026B00907045-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00907045-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00907045-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00907045-I1Open ↗