← Back
Miscellaneous garage
3501 HUTCHINSON AVENUE
BRONX · Eastchester-Edenwald-Baychester · BIN 2124372
💬 Discuss this project
2020Year Built
2Stories
G9Building Class
M2-1Zoning
36,532 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Miscellaneous garage · Owner of record: GABRIELLI HUTCHINSON LLC · 184,163 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MR4707/08/2026
GABRIELLI TRUCK SALES6107/08/2026
AMBROSINO CONSULTANT503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2017$11.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY WIDE EXPEDITING1003/21/2026
A1 EXPEDITING SERVICE CORP.803/21/2026
BUILDING BROTHERS2003/21/2026
KAZAM CONSULTANTS1803/21/2026
H2M ARCHITECTS + ENGINEERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMBROSINO CONSULTANT CORPGeneral Contractor2607/08/2026
INTERBORO SIGN ELECL MAIScaffold1207/08/2026
BALATON CONSULTING LLCScaffold807/08/2026
INTERBORO SIGN & MAINTENANCEGeneral Contractor507/08/2026
FIVE BOROUGH NYC LLCFire Protection307/08/2026
CITY ELEC'L SIGN ERECTORSElectrical203/22/2026
SCIALLI & SONS INCPlumbing207/08/2026
POWER CONNECT ELECTRIC COElectrical103/22/2026
NORTH SHORE NEON SIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16881201/05/2024
HRF SERVICES CORP5616210/28/2019
Building Lifecycle
All (230)Filed (35)Permit Issued (41)Signed Off (22)Violation (11)Inspection (11)Objection (80)Special Inspection (30)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "KENWORTH"
X01073898-I1
07/09/2024
Permit issued — Sign
X01073898-I1-SG
07/08/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "KENWORTH"
X01073898-I1
02/28/2024
Signed off — Alteration
Filed herewith civil site work for new building application filed in BIS #210179509 and civil work for underground plumbing application#X00229903-I1
X00500158-I1
02/08/2024
Signed off — Alteration
INSTALLATION OF NEW GAS BOILER AS PER PLANS.
X00887288-I1
01/30/2024
Objection raised — Other
01/30/2024
Objection resolved — Addressed
01/24/2024
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN A: GABRIELLI TRUCK SALES)
X00166966-I1
01/24/2024
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN B: GABRIELLI TRUCK SALES)
X00166980-I1
01/22/2024
Signed off — Alteration
Installation of sprinkler system as per plans filed herewith. No change to use, egress, or occupancy.
X00407693-I1
01/18/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Other
01/16/2024
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN D: GABRIELLI TRUCK SALES)
X00166998-I1
01/16/2024
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN C: GABRIELLI TRUCK SALES)
X00166987-I1
01/05/2024
Filed — Alteration
Filed herewith civil site work for new building application filed in BIS #210179509 and civil work for underground plumbing application#X00229903-I1
X00500158-P3
01/03/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
01/03/2024
Special inspection requirement — Subgrade Inspections
SEBASTIAN SETTEDUCATE JR., P.E
01/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/05/2023
Special inspection requirement — Final
FAHAD FATEH
09/29/2023
Objection resolved — Addressed
09/29/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Other
09/14/2023
Objection raised — Other
09/14/2023
Objection raised — Other
09/14/2023
Objection raised — Other
09/12/2023
Special inspection requirement — Final
FAHAD FATEH
09/12/2023
Special inspection requirement — Final
FAHAD FATEH
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/05/2023
Objection raised — Other
09/05/2023
Objection raised — Other
09/05/2023
Objection raised — Other
09/05/2023
Objection raised — Other
09/01/2023
Filed — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN D: GABRIELLI TRUCK SALES)
X00166998-P1
09/01/2023
Filed — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN B: GABRIELLI TRUCK SALES)
X00166980-P1
09/01/2023
Filed — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN A: GABRIELLI TRUCK SALES)
X00166966-P1
09/01/2023
Filed — Alteration
INSTALL INDIRECTLY ILLUMINATED ACCESSORY BUSINESS SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (SIGN C: GABRIELLI TRUCK SALES)
X00166987-P1
08/31/2023
Signed off — Alteration
ABOVE-GRADE SIGN STRUCTURE ONLY (FOR SIGNS C-X00166987 & D-X00166998). ALL FOUNDATION WORK FILED SEPARATELY (# 220726007). THIS APPLICATION IS FILED BY A REGISTERED DESIGN PROFESSIONAL (PE) AND IS IN COMPLIANCE WITH 1 RCNY 105-04.
X00187778-I1
08/31/2023
Signed off — Alteration
ABOVE-GRADE SIGN STRUCTURE ONLY (FOR SIGNS A-X00166966 & B-X00166980). ALL FOUNDATION WORK FILED SEPARATELY (# 220726007). THIS APPLICATION IS FILED BY A REGISTERED DESIGN PROFESSIONAL (PE) AND IS IN COMPLIANCE WITH 1 RCNY 105-04.
X00187773-I1
08/25/2023
Signed off — Alteration
civil work for underground plumbing as per plans filed herewith. no change to use, egress, or occupancy.
X00229903-I1
08/21/2023
Signed off — Alteration
proposed new curb cut (curb cut 2)
X00229890-I1
08/21/2023
Signed off — Alteration
curb cut 3
X00229893-I1
08/21/2023
Signed off — Alteration
Proposed new curb cut (curb cut 1)
X00229885-I1
08/18/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/18/2023
Special inspection requirement — Permanent certificate
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
08/18/2023
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
08/15/2023
Filed — Alteration
INSTALLATION OF NEW GAS BOILER AS PER PLANS.
X00887288-P1
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
08/14/2023
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO07/09/2024
DOB NOWBoiler EquipmentSigned-offSCIALLI & SONS INC08/04/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC06/21/2023
DOB NOWGeneral ConstructionSigned-offAMBROSINO CONSULTANT CORP01/06/2023
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP11/28/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/21/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/21/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/19/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/15/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/08/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/08/2022
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO11/08/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/08/2022
DOB NOWGeneral ConstructionSigned-offAMBROSINO CONSULTANT CORP10/17/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI08/19/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI08/19/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI08/19/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI08/19/2022
DOB NOWCurb CutSigned-offAMBROSINO CONSULTANT CORP08/19/2022
DOB NOWCurb CutSigned-offAMBROSINO CONSULTANT CORP08/19/2022
DOB NOWStructuralSigned-offINTERBORO SIGN & MAINTENA08/10/2022
DOB NOWCurb CutSigned-offAMBROSINO CONSULTANT CORP08/10/2022
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC06/21/2022
DOB NOWStructuralSigned-offINTERBORO SIGN & MAINTENA01/12/2022
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP12/28/2021
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP11/09/2021
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP08/03/2021
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC07/16/2021
DOB NOWStructuralSigned-offINTERBORO SIGN & MAINTENA06/30/2021
DOB NOWPlumbingSigned-offSCIALLI & SONS INC06/25/2021
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI05/26/2021
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI05/26/2021
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI05/26/2021
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI05/26/2021
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP03/10/2021
DOB NOWConstruction FenceSigned-offAMBROSINO CONSULTANT CORP03/10/2021
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI10/20/2020
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI10/20/2020
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI10/20/2020
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI10/20/2020
+ 14 more permits on file
10 projects · most recent 08/21/2023
General Wiring Lighting
FiledStatusContractorScope
08/21/2023CompletePOWER CONNECT ELECTRIC COGeneral Wiring, Lighting
05/17/2023CompleteCITY ELEC'L SIGN ERECTORS—
05/17/2023CompleteCITY ELEC'L SIGN ERECTORS—
05/17/2023CompleteCITY ELEC'L SIGN ERECTORS—
05/17/2023CompleteCITY ELEC'L SIGN ERECTORS—
05/17/2023CompleteCITY ELEC'L SIGN ERECTORS—
04/10/2023CompleteCITY ELEC'L SIGN ERECTORS—
04/10/2023CompleteCITY ELEC'L SIGN ERECTORS—
09/02/2022CompleteJAM ELECTRICAL CORP—
10/19/2021CompletePOWER CONNECT ELECTRIC CO1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/19/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/11/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/14/2021Pass-Final PL - UndergroundPassView ↗
08/17/2021Pass-Final PL - UndergroundPassView ↗
07/21/2021Pass-Final PL - UndergroundPassView ↗
06/30/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
01/03/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
01/03/2024Subgrade InspectionsSEBASTIAN SETTEDUCATE JR., P.Especial
01/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
10/05/2023FinalFAHAD FATEHprogress
09/12/2023FinalFAHAD FATEHprogress
09/12/2023FinalFAHAD FATEHprogress
08/18/2023Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/18/2023HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/18/2023HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/18/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
08/18/2023Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
08/18/2023HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/18/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/14/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
08/14/2023Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
08/14/2023HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/14/2023HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/14/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/14/2023HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/14/2023Permanent certificateSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/27/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/27/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/21/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/21/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/16/2023FinalFAHAD FATEHprogress
Latest 25 of 44.
▾Documents — 287 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch12
08/25/2026X00500158-I1Request digital key ↗
08/25/2026X00500158-P2Request digital key ↗
08/23/2026X08007161-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sign8
08/26/2026X00166980-I1Request digital key ↗
08/26/2026X00166987-I1Request digital key ↗
08/26/2026X00166998-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/23/2026X00407693-P5Request digital key ↗
08/23/2026X00407693-P4Request digital key ↗
08/15/2026X00407693-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut3
08/15/2026X00229890-I1Request digital key ↗
08/14/2026X00229885-I1Request digital key ↗
08/14/2026X00229893-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026X00187773-I1Request digital key ↗
08/14/2026X00187778-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00229903-P1Request digital key ↗
08/15/2026X00229903-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00261347-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION30
12/12/2025210179509Open ↗
09/20/2023220716116Open ↗
08/07/2023210179509Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION7
07/06/2022210179509Open ↗
10/01/2021220726007Open ↗
08/21/2020210179509Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/23/2020220716116Open ↗
05/26/2020220716116Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/29/2024220726007Open ↗
▸BISCertificate Of Occupancy Application1
04/27/2023210179509Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZoning Diagram1
10/07/2019210179509Open ↗
▸BISFlood Zone Design Certification1
12/02/2025210179509Open ↗
▸BISZoning Exhibit I Certification1
09/27/2019210179509Open ↗
▸BISVERIFY TAX LOT1
01/14/2025210179509Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/19/2025210179509Open ↗
▸BISZoning Exhibit Iii Desc Amp Ownrshp Stmnt1
09/27/2019210179509Open ↗
▸Seals & Professional Certifications62
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/26/2026X00166980-I1Open ↗
08/26/2026X00166998-I1Open ↗
08/26/2026X00166966-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/30/2026X00187773-I1Open ↗
09/30/2026X00187773-I1Open ↗
09/30/2026X00187773-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/30/2026X00187773-I1Open ↗
09/23/2026X00887288-I1Open ↗
09/02/2026X00166980-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/18/2020220726007Open ↗
▸Trade Schedules & Equipment10
▸BISSchedule B Plumbing9
08/07/2023210179509Open ↗
02/13/2023210179509Open ↗
07/13/2022210179509Open ↗
Showing 3 of 9 on file for this type
▸BISFa Fdny Approval Fd Faa1
04/01/2020210179509Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan8
08/26/2026X00166980-I1Open ↗
08/26/2026X00166998-I1Open ↗
08/26/2026X00166966-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST2
11/07/2019210179509Open ↗
08/14/2019210179509Open ↗
▸BISSTREET TREE SIGNOFF2
01/14/2025210179509Open ↗
01/16/2024220716116Open ↗
▸Energy Compliance14
▸BISTechnical Report Energy Code Responsibility7
06/12/2024210179509Open ↗
06/14/2023210179509Open ↗
06/26/2020210179509Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/18/2020220726007Open ↗
11/07/2019210179509Open ↗
▸BISAs Built Energy Analysis En22
06/12/2024210179509Open ↗
01/30/2024220726007Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/22/2024220726007Open ↗
▸BISPreliminary Commissioning Report Certification1
12/02/2025210179509Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/30/2024220726007Open ↗
▸Inspections & Test Reports27
▸BISTechnical Report Responsibility13
09/03/2025210179509Open ↗
01/15/2025210179509Open ↗
01/14/2025210179509Open ↗
Showing 3 of 13 on file for this type
▸BISTechnical Report Responsibility Certification3
11/07/2019210179509Open ↗
11/07/2019210179509Open ↗
11/07/2019210179509Open ↗
▸BISTechnical Report Concrete Design Mix3
03/19/2021210179509Open ↗
11/07/2019210179509Open ↗
10/15/2020220726007Open ↗
▸BISTr2 Concrete Field Testing Technical Report2
02/11/2026210179509Open ↗
02/10/2026210179509Open ↗
▸BISTechnical Report Concrete Test Cylinder2
11/07/2019210179509Open ↗
10/15/2020220726007Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/30/2024220726007Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/30/2024220726007Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/14/2025210179509Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/30/2024220726007Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE5
05/03/2023210179509Open ↗
04/27/2023210179509Open ↗
04/04/2023210179509Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/08/2020220726007Open ↗
07/08/2020220726007Open ↗
07/08/2020220726007Open ↗
Showing 3 of 4 on file for this type
▸BISNys Dec Tidal Wetlands Approval2
04/01/2020210179509Open ↗
06/22/2020220716116Open ↗
▸BISAdministrative Objections1
09/27/2019210179509Open ↗
▸BISSuperseding Letter1
11/29/2021210179509Open ↗
▸Cost, Insurance & Ownership10
▸BISProject Specific Gl Insurance4
07/06/2022210179509Open ↗
11/29/2021210179509Open ↗
07/31/2020210179509Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT3
02/22/2024220726007Open ↗
02/18/2020220726007Open ↗
08/05/2013220324735Open ↗
▸BISInsurance Liability1
07/01/2020210179509Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/30/2024220726007Open ↗
▸BISInsurance Workers Compensation1
07/01/2020210179509Open ↗
▸Filing & Intake Forms33
▸BISAdditional Information25
07/19/2023210179509Open ↗
05/19/2023210179509Open ↗
03/27/2023210179509Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET6
02/18/2020220726007Open ↗
10/01/2019220716116Open ↗
05/06/2019210179509Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/06/2022210179509Open ↗
11/29/2021210179509Open ↗
▸Other Documents19
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation8
08/26/2026X00166980-I1Open ↗
08/26/2026X00166998-I1Open ↗
08/26/2026X00166966-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHydraulic Calculations5
08/13/2026X00407693-P2Open ↗
08/13/2026X00407693-P1Open ↗
08/13/2026X00407693-P5Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/29/2024220726007Open ↗
07/08/2020220726007Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
06/22/2020220716116Open ↗
▸BISFema Elevation Cert 086 0 33 Floodproofing Cert 086 0 341
12/02/2025210179509Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/26/2020220716116Open ↗
▸BISPLOT DIAGRAM1
05/13/2019210179509Open ↗