← Back
Elevator apt, semi-fireproof without stores
351 EAST 54 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1087327
💬 Discuss this project
2001Year Built
6Stories
D1Building Class
R10Zoning
9,938 sfGross Floor Area
12Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: EAST 54TH STREET HOUSING DEVELOPMENT FUND CORP. · 2,008 sf lot · 4.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Filed — no permit issued24p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
351 EAST 541203/21/2026
MET COUNCIL403/21/2026
ALROSE HOLDING303/21/2026
EAST SIDE AFFORDABLE HDFC203/21/2026
EAST 54TH STREET HOUSING DEVELOPMENT FUND CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING311/06/2025
CTA ARCHITECTS106/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD ESPOSITOElectrical103/21/2026
Building Lifecycle
All (64)Filed (4)Violation (60)
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
B
02/04/2026
Violation issued (FDNY_NOV, closed)
12/27/2025
Violation issued (HPD, closed)
B
12/27/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
11/06/2025
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01214880-I1
11/06/2025
Filed — Alteration
SCOPE INCLUDES BOILER REPLACEMENTS, INSTALLING CONSTANT AIRFLOW REGULATORS, AND INSTALLING HEATING AND COOLING SYSTEM FOR MACHINE ROOM AS PER PLANS FILES HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01210879-I1
11/06/2025
Filed — Alteration
M01218373-I1
11/05/2025
Violation issued (HPD, closed)
B
10/17/2025
Violation issued (HPD, closed)
B
10/07/2025
Violation issued (HPD, closed)
B
09/15/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
C
08/12/2025
Violation issued (HPD, closed)
C
06/25/2025
Filed — Alteration
ROOF REPLACEMENT, WINDOW REPLACEMENT, ELEVATOR REHAB AND BOILER REPLACEMENT, LOCALIZED FISP WORK, AGING IN PLACE IN LOCALIZED APARTMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01210368-I1
05/14/2025
Violation issued (HPD, closed)
A
05/14/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
I
05/12/2025
Violation issued (HPD, closed)
I
05/12/2025
Violation issued (HPD, closed)
I
05/12/2025
Violation issued (HPD, closed)
I
04/30/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
B
04/25/2025
Violation issued (HPD, closed)
C
04/23/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_ORDER, closed)
02/14/2025
Violation issued (HPD, closed)
B
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
C
01/18/2025
Violation issued (HPD, closed)
B
01/18/2025
Violation issued (HPD, closed)
B
10/04/2024
Violation issued (HPD, open)
C
05/30/2024
Violation issued (HPD, closed)
B
04/28/2024
Violation issued (FDNY_NOV, closed)
04/10/2024
Violation issued (ECB, closed)
Elevators
03/21/2024
Violation issued (FDNY_NOV, closed)
12/17/2023
Violation issued (FDNY_NOV, closed)
11/15/2023
Violation issued (HPD, closed)
I
10/18/2023
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/14/2023
Violation issued (HPD, closed)
C
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISEQISSUEDHRH CONST CORP04/04/2003
BIS—ISSUEDHRH CONSTR.04/04/2003
BISEQISSUEDHRH CONST CORP12/31/2002
BISSPISSUEDQUEENS, THE MECHANICAL CORP.12/09/2002
BIS—ISSUEDHRH CONSTR.04/09/2002
BISEQISSUEDHRH CONST CORP04/09/2002
BISPLISSUEDMO CAR MECH02/15/2002
BISEQISSUEDWEATHERBEE02/27/1996
BISEQISSUEDWEATHERBEE02/27/1996
BIS—ISSUEDWEATHERBEE02/21/1996
BISOTISSUEDWEATHERBEE CONSTRUCTION12/04/1995
1 project · most recent 11/06/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
11/06/2025——Air Conditioning Systems, Heating Systems
1 project · most recent 11/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/06/2025——Gas, Water/Sanitary
1 project · most recent 04/23/2025
FiledStatusContractorScope
04/23/2025Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/05/2026HVAC-R and service water piping design and insulation—energy_progress
12/10/2025Chimneys and vents—special
05/09/2025Maintenance information—energy_progress
05/09/2025Fire-Resistant Penetrations and Joints—special
05/09/2025Energy Code Compliance Inspections—progress
05/09/2025HVAC-R and service water heating equipment—energy_progress
05/09/2025HVAC-R and service water heating system controls—energy_progress
04/23/2025Tenant Protection Plan Compliance—special
04/15/2025Maintenance information—energy_progress
04/15/2025HVAC-R and service water heating system controls—energy_progress
04/15/2025Duct leakage testing, insulation and design—energy_progress
04/15/2025HVAC-R and service water heating equipment—energy_progress
04/15/2025Tenant Protection Plan Compliance—special
04/15/2025Mechanical Systems—special
04/15/2025Fire-Resistant Penetrations and Joints—special
04/15/2025Post-installed Anchors—special
04/15/2025Energy Code Compliance Inspections—progress
04/15/2025Final—progress
04/15/2025HVAC-R and service water piping design and insulation—energy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026M01210368-I1Request digital key ↗
08/23/2026M01210368-P1Request digital key ↗
08/21/2026M01218373-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026M01210368-I1Open ↗
08/23/2026M01210368-P1Open ↗
08/21/2026M01218373-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01214880-I1Open ↗
08/13/2026M01210879-I1Open ↗