Geffner House II
351 WEST 42ND STREET · BIN 1024937
💬 Discuss this project
1929Year Built
20Stories
N9Building Class
C6-4Zoning
107,679 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized24 Active Violations 22 unresolved · 2 paperwork only ▸FISP: SAFE
Miscellaneous asylum / home · Owner of record: Holland Hotel Housing Development Fund C Orporation · 8,030 sf lot · 13.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsProject RenewalUnder Construction2 filings
RoofProject Renewal5p · 3 filings
Floor 21 filing
Floor 1Project Renewal2 filings
Site & exteriorProject Renewal4 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Project Renewal7107/08/2026
Holland Hotel HDFC1303/22/2026
MRG Partners503/21/2026
Subway303/21/2026
42-43 Realty203/21/2026
Ascential Expediting103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP Engineering1507/29/2026
Office of James Ruderman208/21/2025
Rigid Structural Design206/16/2025
PS Engineers105/08/2025
Facade MD Architecture and Engineering101/09/2025
Arquitectura Varela104/18/2024
KZ Engineering103/13/2024
Prospect Associates105/17/2023
Scalar Architecture109/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers403/21/2026
Paul Fusco Consulting2403/21/2026
Synergy Building Consultants103/21/2026
Green Light Expediting603/21/2026
BMB Building Consulting203/21/2026
Rigid Structural Design403/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor807/08/2026
Everest ScaffoldingScaffold507/08/2026
American Standard PlumbingFire Protection207/08/2026
Maspeth ContractingGeneral Contractor207/08/2026
Andamio ScaffoldingScaffold204/09/2026
American Standard P&H CororpPlumbing207/08/2026
JC Contracting ManagementGeneral Contractor107/08/2026
Unitech DesignSign hanger107/08/2026
Caputek Electrical ServicesElectrical103/22/2026
Classic Consulting GroupScaffold104/09/2026
Haber Electric CoElectrical103/22/2026
Maspeth ContractingScaffold104/09/2026
Petri ElectricElectrical103/21/2026
Techno-Volt ElectricElectrical103/22/2026
Caputek Electrical ServicesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP Inspections and Commis70791807/29/2026
Sag Engineering & Consulting608110/17/2019
Building Lifecycle
All (172)Filed (26)Permit Issued (22)Signed Off (10)Facade (FISP) (22)Violation (60)Inspection (2)Special Inspection (30)
09/25/2026
Violation issued (ECB, open)
Elevators
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
C
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
A
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
08/05/2026
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
08/05/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
07/29/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-A3
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
07/21/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
07/21/2026
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Violation issued (HPD, open)
C
07/10/2026
Violation issued (HPD, open)
B
07/10/2026
Violation issued (HPD, open)
B
07/10/2026
Violation issued (HPD, closed)
B
07/09/2026
Cycle 9 facade report signed — SAFE
06/23/2026
Violation issued (HPD, closed)
B
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
B
06/16/2026
Cycle 9 facade inspection completed
06/10/2026
Violation issued (HPD, open)
A
05/27/2026
Cycle 9 facade report submitted
05/12/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-A1
05/12/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-A2
04/26/2026
Violation issued (HPD, closed)
A
04/26/2026
Violation issued (HPD, closed)
B
04/26/2026
Violation issued (HPD, closed)
B
04/26/2026
Violation issued (HPD, open)
B
03/24/2026
Permit issued — Mechanical Systems
M01053692-S1-MS
03/23/2026
Permit issued — General Construction
M01053692-I1-GC
03/09/2026
Violation issued (HPD, closed)
C
01/27/2026
Signed off — Alteration
FILE-SUPPORTED PIPE SCAFFOLD AS SHOWN ON THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01194487-I1
01/21/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01179406-I1
01/20/2026
Permit issued — Sidewalk Shed
M01179406-I1-SH
01/05/2026
Cycle 9 facade inspection completed
01/05/2026
Cycle 9 facade report signed — SWARMP
01/02/2026
Violation issued (ECB, open)
Elevators
12/19/2025
Violation issued (HPD, closed)
A
12/19/2025
Violation issued (HPD, closed)
A
12/16/2025
Signed off — Alteration
Filing Structural Steel repair at facade areas as per plans. No change in use, egress, or occupancy under this application.
M01128591-S1
12/16/2025
Signed off — Alteration
Filing Structural Steel repair at facade areas as per plans. No change in use, egress, or occupancy under this application.
M01128591-I1
12/11/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-P8
12/04/2025
Signed off — Alteration
M01194477-I1
12/01/2025
Signed off — Alteration
PROPOSED INSTALLATION OF SYSTEM SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01038565-I1
11/21/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-P7
11/21/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01053692-P9
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
11/21/2025
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
11/21/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/14/2025
Violation issued (HPD, closed)
C
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction03/24/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/23/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/20/2026
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp10/07/2025
DOB NOWSprinklersPermit IssuedAmerican Standard Plumbing10/06/2025
DOB NOWStructuralSigned-offMaspeth Contracting09/05/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction07/10/2025
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction07/07/2025
DOB NOWSupported ScaffoldSigned-offMaspeth Contracting05/09/2025
DOB NOWGeneral ConstructionSigned-offMaspeth Contracting05/07/2025
DOB NOWSuspended ScaffoldSigned-offMaspeth Contracting04/04/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding02/13/2025
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp07/17/2024
DOB NOWSprinklersPermit IssuedAmerican Standard Plumbing07/17/2024
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction07/15/2024
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction07/15/2024
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group04/19/2024
DOB NOWSignSigned-offUnitech Design05/18/2023
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/31/2020
DOB NOWStructuralSigned-offJC Contracting Management02/10/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding08/22/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/21/2018
BISMHISSUEDG.bassolino Plumbing05/07/2020
BIS—ISSUEDOcv Architects11/26/2019
BISMHISSUEDG.bassolino Plumbing06/13/2019
BISOTISSUEDJC Contracting Management04/01/2019
BIS—ISSUEDOcv Architects07/03/2018
BISOTISSUEDMDG Design & Construction02/02/2017
BISPLISSUEDJ-J Plumbing11/30/2016
BISOTISSUEDMDG Design & Construction02/08/2016
BISPLISSUEDJ-J Plumbing12/08/2015
BISOTISSUEDMDG Design & Construction02/05/2015
BISPLISSUEDJ-J Plumbing01/06/2015
BISFBISSUEDEfficient Comb & Cooling Co11/03/2014
BISOTISSUEDMDG Design & Construction02/12/2014
BISPLISSUEDJ-J Plumbing12/30/2013
BISOTISSUEDMDG Design & Construction12/24/2013
BISPLISSUEDLosman Plumbing and Heating05/03/2013
BISOTISSUEDConstruction 6 General Co04/29/2013
BISOTISSUEDMasonry Services05/29/2012
+ 32 more permits on file
1 project · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026Permit IssuedAmerican Standard Plumbing222 heads
1 project · most recent 07/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/29/2026Permit IssuedAmerican Standard P&HGas, Water/Sanitary
13 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedDanube Electric CoGeneral Wiring
08/04/2026CompleteTechno-Volt ElectricGeneral Wiring
08/04/2026Permit IssuedTechno-Volt ElectricGeneral Wiring
07/29/2026Permit IssuedDanube Electric Co—
03/03/2025Permit IssuedCaputek Electrical Services—
02/06/2025CompleteBorowide Elect'l Contractors—
07/29/2024Permit IssuedOmd Electrical1 meters, 1 new_meters
10/17/2023CompleteDanube Electric CoGeneral Wiring
05/22/2023CompleteAtmos Electric Svce—
05/13/2022CompleteHaber Electric CoGeneral Wiring
12/15/2021Permit IssuedCole ElectricGeneral Wiring
09/06/2021CompleteHaber Electric CoGeneral Wiring
09/17/2018CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2023Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/05/2026Tenant Protection Plan Compliance—special
08/05/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
08/05/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
08/05/2026Sprinkler SystemsMOLLY GLENNspecial
08/05/2026Post-installed AnchorsMOLLY GLENNspecial
07/21/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
07/21/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
07/21/2026Post-installed AnchorsMOLLY GLENNspecial
07/21/2026Sprinkler SystemsMOLLY GLENNspecial
07/21/2026Tenant Protection Plan Compliance—special
11/21/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
11/21/2025Sprinkler SystemsMOLLY GLENNspecial
11/21/2025Post-installed AnchorsMOLLY GLENNspecial
11/21/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
11/21/2025Tenant Protection Plan Compliance—special
07/23/2025Tenant Protection Plan Compliance—special
07/23/2025FinalMOLLY GLENNprogress
07/23/2025Fire-Resistance Rated ConstructionMOLLY GLENNprogress
07/23/2025Interior lighting powerMOLLY GLENNenergy_progress
07/23/2025Lighting controlsMOLLY GLENNenergy_progress
07/23/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
06/16/2025Tenant Protection Plan Compliance—special
06/16/2025FinalMOLLY GLENNprogress
06/16/2025Fire-Resistance Rated ConstructionMOLLY GLENNprogress
06/16/2025Interior lighting powerMOLLY GLENNenergy_progress
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Project RenewalCommunity FacilityFloor 1, Roof
Project M01194487 Alteration · LOC Issued · 05/08/2025
Project M01179406 Alteration · LOC Issued · 02/12/2025
Project M01053692 Alteration · Permit Entire · 06/10/2024
Project M00867983 Alteration · LOC Issued · 05/17/2023
Project M00079568 Alteration · LOC Issued · 09/20/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
09/06/2026M00079568-I1Request digital key ↗
08/31/2026M00867983-I1Request digital key ↗
08/27/2026M01014554-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00232219-I1Request digital key ↗
▸Applications & Permits81
▸BISPLAN / WORK APPROVAL APPLICATION60
11/04/2024123255878Open ↗
10/23/2024123255878Open ↗
07/23/2024123255878Open ↗
Showing 3 of 60 on file for this type
▸BISWORK PERMIT APPLICATION20
11/27/2019123255878Open ↗
06/13/2019123475346Open ↗
04/01/2019123580384Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/31/2018123255878Open ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00232219-I1Open ↗
08/31/2026M00867983-I1Open ↗
08/27/2026M01014554-I1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
03/06/2020123580384Open ↗
03/06/2020123580384Open ↗
07/25/2018123475346Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01053692-A3Open ↗
09/12/2026M01053692-P3Open ↗
09/01/2026M01053692-P5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M01053692-A3Open ↗
09/12/2026M01053692-P3Open ↗
09/01/2026M01053692-P5Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/25/2018123475346Open ↗
06/26/2018123580384Open ↗
06/15/2018121728960Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/25/2018123475346Open ↗
06/26/2018123580384Open ↗
12/11/2017123255878Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/29/2013140072418Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/29/2013140072418Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/20/2017121728960Open ↗
01/17/2017121728960Open ↗
09/15/2016121728960Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
07/29/2013121728960Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
06/27/2013140072418Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/16/2015120808199Open ↗
▸Safety & Tenant Protection64
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist25
08/17/2026M01053692-A2Open ↗
08/17/2026M01053692-P9Open ↗
08/17/2026M01053692-P7Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist25
08/17/2026M01053692-P9Open ↗
08/17/2026M01053692-P7Open ↗
08/17/2026M01053692-P5Open ↗
Showing 3 of 25 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
07/31/2018123475346Open ↗
06/29/2018123580384Open ↗
04/29/2013140072418Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
07/25/2018123475346Open ↗
06/26/2018123580384Open ↗
11/29/2021120789361Open ↗
▸BISSTREET TREE CHECKLIST2
04/04/2018123255878Open ↗
07/29/2013121728960Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
06/26/2018123580384Open ↗
09/25/2013121728960Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
04/29/2013140072418Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
03/19/2024123255878Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00232219-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/05/2026M00232219-I1Open ↗
08/31/2026M00867983-I1Open ↗
08/21/2026M01128591-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/25/2018123475346Open ↗
06/26/2018123580384Open ↗
09/25/2013121728960Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/15/2018121728960Open ↗
06/15/2018121728960Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/06/2020123580384Open ↗
03/06/2020123580384Open ↗
07/25/2018123475346Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/19/2021123475346Open ↗
03/06/2020123580384Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/19/2021123475346Open ↗
04/29/2013140072418Open ↗
▸BISNYCECC ANALYSIS1
04/29/2013140072418Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/29/2013140072418Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/29/2021120789361Open ↗
11/29/2021120789361Open ↗
04/19/2021123475346Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs57
▸BISSCHEDULE A - OCCUPANCY / USE16
10/23/2024123255878Open ↗
07/18/2024123255878Open ↗
03/03/2023123255878Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/27/2026M01014554-I1Open ↗
08/17/2026M01053692-S1Open ↗
08/17/2026M01053692-I1Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/29/2021120789361Open ↗
05/06/2021102009791Open ↗
04/19/2021123475346Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/09/2020123255878Open ↗
07/03/2018123255878Open ↗
04/22/2016120808199Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
11/29/2021120789361Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
04/19/2021123475346Open ↗
03/06/2020123580384Open ↗
07/25/2018123475346Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms32
▸BISBOROUGH INTAKE FORM11
03/26/2020123255878Open ↗
03/09/2020123255878Open ↗
03/06/2020123580384Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
07/25/2018123475346Open ↗
06/26/2018123580384Open ↗
12/11/2017123255878Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
10/29/2024123255878Open ↗
07/23/2024123255878Open ↗
10/05/2015121728960Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/13/2019123475346Open ↗
02/05/2019123255878Open ↗
06/15/2018121728960Open ↗
Showing 3 of 4 on file for this type
▸BISDHCR DOCUMENT1
05/04/2021102009791Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
05/06/2021102009791Open ↗
▸BISPLOT DIAGRAM1
07/29/2013121728979Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00079568-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01194477-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01194477-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00079568-I1Open ↗