351 WEST 84TH STREET
MANHATTAN · BIN 1033842
💬 Discuss this project
1897Year Built
5Stories
C5Building Class
R8BZoning
5,080 sfGross Floor Area
4Units
Rent Stabilized5 Active Violations ▸
Converted dwellings or rooming house · Owner of record: 84 Street Owners · 1,635 sf lot · 3.11 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionLandscape
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofToilet replacement and floor refinishing4p · 3 filings · 20 docs
Floor 5Unit 50426p · 4 filings · 20 docs
Floor 4Unit 40429p · 5 filings · 20 docs
Floor 3Toilet replacement and floor refinishing34p · 6 filings · 20 docs
Floor 2Second Floor Plumbing Work23p · 5 filings · 20 docs
Floor 1Second Floor Plumbing Work18p · 5 filings · 20 docs
CellarSecond Floor Plumbing Work21p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Stone Co3510/04/2026
84 Street Owners103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2023$2.2M—— → —$443/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Luke Licalzi, P.E2009/04/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Belair1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E S Concept ConstructionGeneral Contractor1307/08/2026
Dynamic Blue Water MechanicalPlumbing507/08/2026
All Pro Plumbing & HeatingGeneral Contractor103/21/2026
Bent Mechanicalspecialty_contractor107/08/2026
Veneziano CrescenzoGeneral Contractor103/21/2026
All Pro Plumbing & HeatingPlumbing110/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jon Libasci30682009/04/2026
Jack Green Associates422102/23/2024
Building Lifecycle
All (185)Filed (20)Permit Issued (15)Signed Off (5)Violation (60)Inspection (9)Objection (46)Special Inspection (30)
09/04/2026
Filed — Alteration CO
obtain certificate of occupancy for the building - modify 3rd, 4th and 5th floors to convert to class 'A'
M01014868-P3
09/04/2026
Special inspection requirement — Interior lighting power
jon libasci
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
09/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
09/04/2026
Special inspection requirement — Lighting in dwelling units
jon libasci
09/04/2026
Special inspection requirement — Lighting controls
jon libasci
07/29/2026
Objection raised — Accessibility
07/29/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Structural
06/30/2026
Objection raised — Structural
06/30/2026
Objection raised — Accessibility
06/08/2026
Objection raised — Admin
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Accessibility
06/08/2026
Objection resolved — Addressed
05/21/2026
Filed — Alteration CO
obtain certificate of occupancy for the building - modify 3rd, 4th and 5th floors to convert to class 'A'
M01014868-P2
04/29/2026
Violation issued (HPD, closed)
A
04/07/2026
Signed off — Alteration
Interior renovation (plumbing work type) installation of 4 water closets, 4 lavatories, 1 tub, 2 showers 1 residential sink, 1 dishwasher, 1washer, 1 gas dryer, 1residential stove and 1 gas fireplaces as per plan. No change in egress, occupancy or use.
M00917706-I1
03/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/23/2026
Permit issued — Plumbing
M00917706-I1-PL
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
01/16/2026
Permit issued — Plumbing
M00917706-I1-PL
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Plumbing
01/06/2026
Objection raised — Plumbing
12/22/2025
Filed — Alteration
Interior renovation (plumbing work type) installation of 4 water closets, 4 lavatories, 1 tub, 2 showers 1 residential sink, 1 dishwasher, 1washer, 1 gas dryer, 1residential stove and 1 gas fireplaces as per plan. No change in egress, occupancy or use.
M00917706-P5
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
12/19/2025
Signed off — Alteration
interior renovation Plumbing work type, cap and remove 9 fixtures, relocate and or add 11 fixtures, relocate or replace 4 gas fixtures, no change in egress occupancy or use.
M01039380-I1
11/17/2025
Violation issued (HPD, closed)
I
09/04/2025
Signed off — Alteration
interior renovation , sprinkler work, modification of existing sprinkler system, cellar, 01 ,02 . no change in egress occupancy or use.
M00917786-I1
08/15/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2025
Signed off — Alteration
interior renovation and combination of three existing units on 1st and 2nd floor demolition and construction of non bearing partitions fittings fixtures and finishes as per bplans PL and MH filed separately. No change in egress occupancy or use
M00908436-I1
05/30/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Zoning
04/28/2025
Objection raised — Accessibility
04/21/2025
Signed off — Alteration
M01167445-I1
04/19/2025
Filed — Alteration CO
obtain certificate of occupancy for the building - modify 3rd, 4th and 5th floors to convert to class 'A'
M01014868-P1
04/17/2025
Filed — Alteration
interior renovation and combination of three existing units on 1st and 2nd floor demolition and construction of non bearing partitions fittings fixtures and finishes as per bplans PL and MH filed separately. No change in egress occupancy or use
M00908436-P1
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
04/16/2025
Special inspection requirement — Final
PAUL SELETSKY
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
04/16/2025
Special inspection requirement — Lighting controls
jon libasci
04/16/2025
Special inspection requirement — Interior lighting power
jon libasci
04/16/2025
Special inspection requirement — Lighting in dwelling units
jon libasci
04/16/2025
Special inspection requirement — Lighting controls
jon libasci
04/16/2025
Special inspection requirement — Lighting in dwelling units
jon libasci
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSuper Plumbers02/23/2026
DOB NOWPlumbingSigned-offSuper Plumbers01/16/2026
DOB NOWMechanical SystemsSigned-offBent Mechanical04/15/2025
DOB NOWSprinklersSigned-offAll Pro Plumbing & Heating01/27/2025
DOB NOWPlumbingSigned-offSuper Plumbers01/07/2025
DOB NOWGeneral ConstructionPermit IssuedE S Concept Construction11/12/2024
DOB NOWGeneral ConstructionPermit IssuedE S Concept Construction11/12/2024
DOB NOWGeneral ConstructionSigned-offE S Concept Construction11/12/2024
DOB NOWPlumbingSigned-offSuper Plumbers07/25/2024
DOB NOWGeneral ConstructionPermit IssuedE S Concept Construction06/14/2024
DOB NOWGeneral ConstructionSigned-offE S Concept Construction06/14/2024
DOB NOWGeneral ConstructionPermit IssuedE S Concept Construction04/05/2024
DOB NOWGeneral ConstructionSigned-offE S Concept Construction10/30/2023
DOB NOWGeneral ConstructionSigned-offE S Concept Construction10/12/2023
DOB NOWPlumbingSigned-offSuper Plumbers09/15/2023
1 project · most recent 10/25/2023
General Wiring
FiledStatusContractorScope
10/25/2023Permit IssuedOptimal ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
09/04/2026Interior lighting powerjon libascienergy_progress
09/04/2026Fire-Resistant Penetrations and Jointsjon libascispecial
09/04/2026Energy Code Compliance Inspectionsjon libasciprogress
09/04/2026Fire-Resistance Rated Constructionjon libasciprogress
09/04/2026Lighting in dwelling unitsjon libascienergy_progress
09/04/2026Lighting controlsjon libascienergy_progress
02/04/2026Energy Code Compliance Inspectionsjon libasciprogress
02/04/2026Fire-Resistant Penetrations and Jointsjon libascispecial
12/22/2025Fire-Resistant Penetrations and Jointsjon libascispecial
12/22/2025Energy Code Compliance Inspectionsjon libasciprogress
04/16/2025Fire-Resistance Rated Constructionjon libasciprogress
04/16/2025FinalPAUL SELETSKYprogress
04/16/2025Fire-Resistant Penetrations and Jointsjon libascispecial
04/16/2025Energy Code Compliance Inspectionsjon libasciprogress
04/16/2025Fire-Resistant Penetrations and Jointsjon libascispecial
04/16/2025Energy Code Compliance Inspectionsjon libasciprogress
04/16/2025Fire-Resistance Rated Constructionjon libasciprogress
04/16/2025Lighting controlsjon libascienergy_progress
04/16/2025Interior lighting powerjon libascienergy_progress
04/16/2025Lighting in dwelling unitsjon libascienergy_progress
04/16/2025Lighting controlsjon libascienergy_progress
04/16/2025Lighting in dwelling unitsjon libascienergy_progress
04/16/2025Interior lighting powerjon libascienergy_progress
04/15/2025Fire-Resistant Penetrations and Jointsjon libascispecial
04/15/2025Energy Code Compliance Inspectionsjon libasciprogress
Latest 25 of 41.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/28/2026M00965078-I1Request digital key ↗
08/27/2026M00917786-I1Request digital key ↗
08/26/2026M00917706-P4Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits19
▸DOB NOWLPC Approval/Permit19
10/05/2026M01014868-P3Open ↗
08/14/2026M01014868-P2Open ↗
08/13/2026M01039380-I1Open ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01014868-I1Open ↗
08/13/2026M01014868-P1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature28
10/05/2026M01014868-P3Open ↗
10/05/2026M01014868-P3Open ↗
10/05/2026M01014868-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
10/05/2026M01014868-P3Open ↗
08/28/2026M00965078-I1Open ↗
08/27/2026M00917786-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/05/2026M01014868-P3Open ↗
09/23/2026M00917786-I1Open ↗
09/23/2026M00917786-I1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist9
10/05/2026M01014868-P3Open ↗
08/14/2026M01014868-P2Open ↗
08/13/2026M01167445-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWStreet Tree Checklist4
10/05/2026M01014868-P3Open ↗
08/14/2026M01014868-P2Open ↗
08/13/2026M01014868-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
10/05/2026M01014868-P3Open ↗
08/28/2026M00965078-I1Open ↗
08/27/2026M00917786-I1Open ↗
Showing 3 of 20 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
10/05/2026M01014868-P3Open ↗
08/17/2026M01014868-I1Open ↗
08/14/2026M01014868-P2Open ↗
Showing 3 of 4 on file for this type