← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
351 WEST BROADWAY
MANHATTAN · BIN 1007060
💬 Discuss this project
1889Year Built
5Stories
RMBuilding Class
M1-5/R7XZoning
14,216 sfGross Floor Area
6Units
Rent Stabilized11 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,096 sf lot · 4.59 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 13 docs
Floor 5Under Construction7p · 1 filing · 13 docs
Floor 4
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
351 WEST BROADWAY CONDOMINUM803/22/2026
351 W BROADWAY CONDO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PROFESSIONAL ENGINEERING SERVICE302/18/2026
THE SRA GROUP LLC605/06/2022
WAYPOINT CONSULTING GROUP210/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KDV DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLAS BUILDING CONSULTINGGeneral Contractor707/08/2026
JC HI TECH INCGeneral Contractor303/21/2026
CISNE CONTRACTING INCGeneral Contractor303/21/2026
CATHEDRA LLCGeneral Contractor207/08/2026
FAST BUILDERS GROUP LLCGeneral Contractor104/09/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
TOUGH STALLION LLCElectrical103/21/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
NONSTOP PLUMBERS CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KENNETH KOONS, ARCHITECTS1548107/30/2025
THE SRA GROUP LLC3222505/06/2022
PCMARCHITECTS PLLC2812110/28/2021
WAYPOINT CONSULTING GROUP6175106/25/2021
Building Lifecycle
All (113)Filed (11)Permit Issued (12)Signed Off (5)Violation (44)Inspection (9)Objection (2)Special Inspection (30)
06/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/17/2026
Permit issued — General Construction
M01201694-I1-GC
04/17/2026
Permit issued — Mechanical Systems
M01201694-I1-MS
02/18/2026
Filed — Alteration
plumbing work for 5th floor apartment renovation
M01201694-P1
02/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2025
Permit issued — Plumbing
M01201694-S1-PL
12/01/2025
Permit issued — Plumbing
M01201694-S1-PL
11/17/2025
Violation issued (HPD, closed)
I
10/09/2025
Permit issued — General Construction
M01201694-I1-GC
08/18/2025
Filed — Alteration
plumbing work for 5th floor apartment renovation
M01201694-S1
07/30/2025
Filed — Alteration
plumbing work for 5th floor apartment renovation
M01201694-I1
06/04/2025
Violation issued (HPD, open)
A
04/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kenneth Koons
04/02/2025
Special inspection requirement — Heating Systems
Kenneth Koons
03/27/2025
Special inspection requirement — Mechanical Systems
Kenneth Koons
03/27/2025
Special inspection requirement — Final
Kenneth Koons
01/17/2025
Signed off — Alteration
Remove partition, doors flooring material and cabinets. No change in use, Egress or Occupancy
M00499220-I1
01/17/2025
Signed off — Alteration
M00531083-I1
04/02/2024
Violation issued (HPD, open)
A
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/16/2023
Violation issued (HPD, open)
A
03/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/16/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2023
Signed off — Alteration
Modification of existing sprinkler system and renovation of rough plumbing for renovation of bathrooms
M00531245-I1
11/02/2022
Violation issued (HPD, closed)
I
05/10/2022
Special inspection requirement — Maintenance information
STEVEN ROWLAND
05/10/2022
Special inspection requirement — Sprinkler Systems
STEVEN ROWLAND
05/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEVEN ROWLAND
05/06/2022
Filed — Alteration
Modification of existing sprinkler system and renovation of rough plumbing for renovation of bathrooms
M00531245-P3
05/05/2022
Special inspection requirement — Maintenance information
STEVEN ROWLAND
05/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEVEN ROWLAND
05/05/2022
Special inspection requirement — Sprinkler Systems
STEVEN ROWLAND
04/13/2022
Signed off — Alteration
Interior renovation of 1st FL Retail Space, incl. demolition of non-bearing interior partitions, removal of suspended ceilings, relocation of light fixtures, removal of plumbing fixtures, removal of floor finishes, installation of new finishes throughout
M00546738-I1
03/28/2022
Signed off — Alteration
Interior renovation of 1st FL Retail Space, incl. demolition of non-bearing interior partitions, removal of suspended ceilings, relocation of light fixtures, removal of plumbing fixtures, removal of floor finishes, installation of new finishes throughout
M00546738-S1
03/24/2022
Permit issued — Sprinklers
M00531245-I1-EW-SP
03/23/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/16/2022
Violation issued (HPD, open)
A
11/23/2021
Permit issued — Mechanical Systems
M00546738-S1-MS
11/10/2021
Permit issued — General Construction
M00546738-I1-GC
11/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/28/2021
Filed — Alteration
Interior renovation of 1st FL Retail Space, incl. demolition of non-bearing interior partitions, removal of suspended ceilings, relocation of light fixtures, removal of plumbing fixtures, removal of floor finishes, installation of new finishes throughout
M00546738-S1
10/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Alejandro Molina
10/28/2021
Special inspection requirement — Mechanical Systems
Sugnam Chang
10/28/2021
Special inspection requirement — Heating Systems
Sugnam Chang
10/28/2021
Special inspection requirement — Final
Alejandro Molina
10/28/2021
Special inspection requirement — Energy Code Compliance Inspections
Alejandro Molina
10/28/2021
Special inspection requirement — Fire-Resistance Rated Construction
Alejandro Molina
10/28/2021
Special inspection requirement — Maintenance information
Alejandro Molina
10/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALEJANDRO MOLINA
10/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
Alejandro Molina
10/20/2021
Filed — Alteration
Modification of existing sprinkler system and renovation of rough plumbing for renovation of bathrooms
M00531245-P2
10/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEVEN ROWLAND
10/20/2021
Special inspection requirement — Sprinkler Systems
STEVEN ROWLAND
10/20/2021
Special inspection requirement — Maintenance information
STEVEN ROWLAND
10/05/2021
Filed — Alteration
Modification of existing sprinkler system and renovation of rough plumbing for renovation of bathrooms
M00531245-P1
10/05/2021
Special inspection requirement — Sprinkler Systems
STEVEN ROWLAND
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCATHEDRA LLC04/17/2026
DOB NOWMechanical SystemsPermit IssuedCATHEDRA LLC04/17/2026
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP12/30/2025
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP12/01/2025
DOB NOWGeneral ConstructionPermit IssuedFAST BUILDERS GROUP LLC10/09/2025
DOB NOWSprinklersSigned-offNONSTOP PLUMBERS CORP03/24/2022
DOB NOWMechanical SystemsSigned-offJC HI TECH INC11/23/2021
DOB NOWGeneral ConstructionSigned-offATLAS BUILDING CONSULTING11/10/2021
DOB NOWGeneral ConstructionSigned-offCISNE CONTRACTING INC09/10/2021
DOB NOWSprinklersSigned-offAUTHENTIC PLBG CORP09/01/2021
DOB NOWGeneral ConstructionSigned-offATLAS BUILDING CONSULTING07/19/2021
DOB NOWGeneral ConstructionSigned-offATLAS BUILDING CONSULTING07/01/2021
BISEQISSUEDS & E MAINTENANCE INC04/19/2006
BISEQISSUEDOUTDOOR INSTALL LLC06/08/2005
BISPLISSUEDTHEODORE WAGNER PLBG & HTG CORP09/07/2001
BISMHISSUEDKBU CONSTRUCTON CORP06/14/2001
BISSPISSUEDPYROSEVESTIC MECHANICAL CORP.12/06/2000
BISPLISSUEDSKYVIEW HTG&AIR CON CORP04/14/2000
BISMHISSUEDMARCO INTERIORS INC02/07/2000
BISOTISSUEDHONG KONG CHOY CONST.02/04/2000
BISPLISSUEDK & BH PLUMBING & HTG INC09/14/1999
BISEQISSUEDT.B.R. INC.07/12/1999
BISOTISSUEDTEAM WORKS CONTRACTING INC06/04/1999
BISPLISSUEDWAGNER PLG & HTG06/29/1998
BIS—ISSUEDBURDA CONSTRUCTION CORP07/30/1997
1 project · most recent 02/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedCATHEDRA LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin FBQ30TBVJU 30,000 BTU · Vrf Indoor ×2
FBQ48TBVJU Vrf Indoor ×1
RZQ48TBVJUB 4 tons · Condensing Unit ×1
5 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
01/07/2026Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
11/08/2021CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
08/31/2021CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
07/14/2021CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
1 project · most recent 02/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/18/2026Permit IssuedCATHEDRA LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
04/02/2025Fire-Resistance Rated ConstructionKenneth Koonsprogress
04/02/2025Heating SystemsKenneth Koonsspecial
03/27/2025Mechanical SystemsKenneth Koonsspecial
03/27/2025FinalKenneth Koonsprogress
05/10/2022Maintenance informationSTEVEN ROWLANDenergy_progress
05/10/2022Sprinkler SystemsSTEVEN ROWLANDspecial
05/10/2022Fire-Resistant Penetrations and JointsSTEVEN ROWLANDspecial
05/05/2022Maintenance informationSTEVEN ROWLANDenergy_progress
05/05/2022Fire-Resistant Penetrations and JointsSTEVEN ROWLANDspecial
05/05/2022Sprinkler SystemsSTEVEN ROWLANDspecial
10/28/2021HVAC-R and service water piping design and insulationAlejandro Molinaenergy_progress
10/28/2021Mechanical SystemsSugnam Changspecial
10/28/2021Heating SystemsSugnam Changspecial
10/28/2021FinalAlejandro Molinaprogress
10/28/2021Energy Code Compliance InspectionsAlejandro Molinaprogress
10/28/2021Fire-Resistance Rated ConstructionAlejandro Molinaprogress
10/28/2021Maintenance informationAlejandro Molinaenergy_progress
10/28/2021HVAC-R and service water heating system controlsALEJANDRO MOLINAenergy_progress
10/28/2021HVAC-R and service water heating equipmentAlejandro Molinaenergy_progress
10/20/2021Fire-Resistant Penetrations and JointsSTEVEN ROWLANDspecial
10/20/2021Sprinkler SystemsSTEVEN ROWLANDspecial
10/20/2021Maintenance informationSTEVEN ROWLANDenergy_progress
10/05/2021Sprinkler SystemsSTEVEN ROWLANDspecial
10/05/2021Maintenance informationSTEVEN ROWLANDenergy_progress
10/05/2021Fire-Resistant Penetrations and JointsSTEVEN ROWLANDspecial
Latest 25 of 41.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00531245-P2Request digital key ↗
09/03/2026M00531245-P3Request digital key ↗
09/03/2026M00531245-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/15/2026M00499220-I1Open ↗
08/13/2026M00531245-P3Open ↗
08/13/2026M00531245-P1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature21
09/23/2026M00531245-I1Open ↗
09/01/2026M00531245-P2Open ↗
08/31/2026M00546738-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M00531245-I1Open ↗
09/23/2026M00531245-I1Open ↗
09/01/2026M00531245-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00499220-I1Open ↗
09/03/2026M00531245-P2Open ↗
09/03/2026M00531245-P3Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00531245-P2Open ↗
09/03/2026M00531245-P3Open ↗
09/03/2026M00531245-P1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026M00531083-I1Open ↗
08/13/2026M00546738-S1Open ↗
08/13/2026M00531245-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M01201694-I1Open ↗