← Back
BROOKLYN
3510 GLENWOOD ROAD
BROOKLYN · East Flatbush-Farragut · BIN 3430511
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1 filing · 20 docs
Floor 71 filing · 20 docs
Floor 61 filing · 20 docs
Floor 51 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
Site & exterior4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NOS REALTY506/27/2026
LEWIS 26109/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO1703/19/2026
MSM ENGINEERING SERVICES, PLLC205/20/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A.N. CONSTRUCTION CORPGeneral Contractor506/27/2026
MEJ PLUMBING LLCFire Protection206/27/2026
MEJ PLUMBING LLCPlumbing206/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62521403/19/2026
S&S CONCRETE & SOIL TESTI1008105/29/2024
Building Lifecycle
All (93)Filed (20)Permit Issued (20)Signed Off (11)Inspection (12)Special Inspection (30)
07/16/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-I1
03/19/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P9
03/18/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S2
03/18/2026
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Lighting controls
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Metering
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Air barrier — testing
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Protection of exposed foundation insulation
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Lighting in dwelling units
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
03/18/2026
Special inspection requirement — Electrical motors and elevators
INDARDEO PARBHUNATH
03/17/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S1
03/16/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S5
03/16/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S6
03/07/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/07/2026
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — Shutoff dampers
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
03/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
03/06/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/02/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P8
02/24/2026
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
02/24/2026
Special inspection requirement — Shutoff dampers
INDARDEO PARBHUNATH
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
02/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
02/02/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P7
01/23/2026
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S4
01/07/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P6
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S3
11/26/2025
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-S7
11/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/08/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01052903-I1
11/08/2025
Signed off — Alteration
B01030522-I1
10/28/2025
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P5
09/16/2025
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P4
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Permit issued — Sprinklers
B00676117-S2-PL
08/06/2025
Permit issued — Sprinklers
B00676117-S2-EW-SP
03/24/2025
Permit issued — Curb Cut
B00676117-S3-CC
03/24/2025
Permit issued — General Construction
B00676117-I1-GC
03/12/2025
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER SYSTEMS FOR MULTI-FAMILY RESIDENTIAL BUILDING.
B00676117-P3
02/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offKAY PLUMBING INC08/06/2025
DOB NOWSprinklersSigned-offMEJ PLUMBING LLC08/06/2025
DOB NOWCurb CutSigned-offV.A.N. CONSTRUCTION CORP03/24/2025
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP03/24/2025
DOB NOWMechanical SystemsSigned-offV.A.N. CONSTRUCTION CORP12/06/2024
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP11/25/2024
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP10/15/2024
DOB NOWPlumbingSigned-offMEJ PLUMBING LLC09/05/2024
DOB NOWPlumbingSigned-offKAY PLUMBING INC09/05/2024
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP05/20/2024
DOB NOWStructuralSigned-offV.A.N. CONSTRUCTION CORP05/09/2024
DOB NOWFoundationSigned-offV.A.N. CONSTRUCTION CORP05/08/2024
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP04/05/2024
DOB NOWStructuralSigned-offV.A.N. CONSTRUCTION CORP03/22/2024
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP03/21/2024
DOB NOWFoundationSigned-offV.A.N. CONSTRUCTION CORP11/21/2023
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP11/21/2023
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP11/13/2023
DOB NOWSupport of ExcavationSigned-offV.A.N. CONSTRUCTION CORP11/13/2023
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT01/01/2022
1 project · most recent 03/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2026Permit IssuedV.A.N. CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Lg ARUN038GSS4 ARNU093SJS4 ARUN024GSS4 43,000 BTU · Vrf Outdoor ×22
ARUN024GSS4 27,000 BTU · Vrf Outdoor ×6
ARUN038GSS4 54,000 BTU · Vrf Outdoor ×1
KUSAB121A 13,600 BTU · Vrf Outdoor ×1
1 project · most recent 03/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/19/2026Signed-offMEJ PLUMBING LLCStorm, Water/Sanitary
4 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026CompleteTF ELECTRICAL CORPGeneral Wiring
12/29/2025CompleteA.R.I.S. ELECTRIC INCGeneral Wiring
04/04/2024CompleteRICHARD NEU—
01/30/2024CompleteA.R.I.S. ELECTRIC INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/06/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/03/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
03/18/2026Electrical motors and elevatorsINDARDEO PARBHUNATHenergy_progress
03/18/2026Lighting controlsINDARDEO PARBHUNATHenergy_progress
03/18/2026Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
03/18/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
03/18/2026Air barrier — testing INDARDEO PARBHUNATHenergy_progress
03/18/2026MeteringINDARDEO PARBHUNATHenergy_progress
03/18/2026Interior lighting powerINDARDEO PARBHUNATHenergy_progress
03/18/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
03/18/2026Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
03/18/2026Protection of exposed foundation insulationINDARDEO PARBHUNATHenergy_progress
03/18/2026Exterior Insulation and Finish Systems (EIFS)INDARDEO PARBHUNATHspecial
03/18/2026Wall Panels, Curtain Walls, and VeneersINDARDEO PARBHUNATHspecial
03/18/2026Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
03/18/2026Lighting in dwelling unitsINDARDEO PARBHUNATHenergy_progress
03/18/2026Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
03/07/2026HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
03/07/2026Shutoff dampersINDARDEO PARBHUNATHenergy_progress
03/07/2026HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
03/07/2026HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
03/07/2026Maintenance informationINDARDEO PARBHUNATHenergy_progress
03/07/2026FinalNAVEEN KUMARprogress
03/07/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
03/07/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/07/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
02/24/2026FinalNAVEEN KUMARprogress
Latest 25 of 109.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/31/2026B00643709-I1Request digital key ↗
08/25/2026B01030522-I1Request digital key ↗
08/25/2026B01052903-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/25/2026B00676117-P9Open ↗
08/13/2026B00676117-P5Open ↗
08/13/2026B00676117-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/25/2026B00676117-P9Open ↗
08/13/2026B00676117-P2Open ↗
08/13/2026B00676117-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/25/2026B00676117-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature26
09/27/2026B00676117-P8Open ↗
09/27/2026B00676117-P8Open ↗
09/27/2026B00676117-P8Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026B01030522-I1Open ↗
08/25/2026B00676117-S4Open ↗
08/25/2026B00676117-P9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/27/2026B00676117-P1Open ↗
09/27/2026B00676117-P8Open ↗
09/14/2026B00676117-P5Open ↗
Showing 3 of 17 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/25/2026B00676117-P9Open ↗
08/13/2026B00676117-I1Open ↗
08/13/2026B00676117-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/25/2026B00676117-P2Open ↗
08/25/2026B00676117-I1Open ↗
08/25/2026B00676117-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/25/2026B00676117-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00676117-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/25/2026B00676117-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00676117-S1Open ↗
08/13/2026B00676117-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00676117-I1Open ↗
▸Other Documents11
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/25/2026B00676117-P9Open ↗
08/13/2026B00676117-P2Open ↗
08/13/2026B00676117-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026B00676117-I1Open ↗
08/25/2026B00676117-P9Open ↗
08/25/2026B00676117-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial1
08/25/2026B00676117-P9Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00676117-S4Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00676117-I1Open ↗