ECB03/09/2019FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35305026W ISSUED ON 01/10/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO COMPLIANCE RECORDEDNothing owed — awaiting certificate of correction
ECB01/10/2019FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.@TIME OF INSPECTION I NOTED @EXP#1 THE FRONT YARD PROPERLY LINE KEPT OPEN AND UNSECURED, THERE IS NO FENCE OR GATES, NO SECURITY MEASURES THIS IS A RECURRNothing owed — awaiting certificate of correction
ECB01/05/2019FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# 35297083M ISSUED ON 12/05/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR WORK WITHOUT A PERNothing owed — awaiting certificate of correction
ECB11/30/2018FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35297083M ISSUED ON 12/5/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT.COMNothing owed — awaiting certificate of correction
ECB11/21/2018WORK WITHOUT A PERMIT. AT TIME OF INSPECTION. NOTED A BLOCK/RETAINING WALL THAT MEASURES AROUND 52FT LONG BY 9FT HIGH AT EXP #1. BLOCK MEASURES 24 INCHES X 24 INCHES X 5FT. NO PERMIT ON FILE WITH DOB. REM: OBTANothing owed — awaiting certificate of correction
ECB10/11/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS. NOTEDOBSERVED CONCRETE PLANT W/TRUCKS & MIXES FOR DELIVERY & TRAILER ON SITE FOR OFFICE. REMEDY: DISCONTINUE ILLEGAL USE OR AMEND C OF O.Nothing owed — awaiting certificate of correction
ECB10/03/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35297083M ISSUED ON 12/05/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NO COMPLIANCE RECORDED FOR WWP. NO APPLICATION FILED OR PERMIT.Nothing owed — awaiting certificate of correction
ECB09/15/2018ALTERED CHANGED BUILDING OCCUPIED WITHOUT A VALID C OF O LOT IS OCCUPIED AS A CONCRETE MIXING COMPANY.C OF O SAY TO BE OCCUPANCY AS AUTO WRECKING.OBTAIN VALID C OF OR DISCONTINUE ILLEGAL USENothing owed — awaiting certificate of correction
ECB09/06/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O OR DOB RECORDS.NOTED:OBSERVED CONCRETE PLANTS WITH TRUCKS AND MIXER FOR DELIVERY AND TRAILER ON SITE FOR OFFICE.CONTRARY TO C OF O #51055 WHICH STATES AS A AUTO WRECNothing owed — awaiting certificate of correction
ECB08/18/2018FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35297083M ISSUED 12/05/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK WITHOUT A PERMIT. RENothing owed — awaiting certificate of correction
ECB08/11/2018ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1;28-118.3.2. NOTED: LOT IS OCCUPIED AS A CONCRETE MIX COMPANY CONTRARY TO C OF O#51055 THAT STATE OCCUPANCY AS AN AUTO ERACK. CONCRETE MIX MACHINothing owed — awaiting certificate of correction
ECB07/31/2018FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35297083M ISSUED 12/05/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK WITHOUT A PERMIT. NONothing owed — awaiting certificate of correction
ECB07/17/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O OR DOB RECORDS. @ TIME OF INSP & OBSERVED CONCRETE PLANTS W/ SEVERAL MIXER TRUCKS FOR DELIVERY & TRAILER ON SITE FOR OFFICE, CONTRARY TO C OF O# 51055 STATED AS A AUNothing owed — awaiting certificate of correction
ECB06/26/2018ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY PER 28-118.3.2.AT THE TIME OF INSPECTION ENCLOSED AT OCCUPIED LOTIS A CONCRETE MIX COMPANY CONTRARY TO COFO #51055 STATED AS A AUTO WRENothing owed — awaiting certificate of correction
ECB05/18/2018FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35297083M ISSUED ON 12/05/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NOTE:NO DOCUMENT FILE FONothing owed — awaiting certificate of correction
ECB04/09/2018ALTERED/CHANGED BLDG OCCUIPED W/OUT A VALID C OF O PER (28-113.1 & 28-118.3.2) NOTED:LAND OCCUPIED/USED AS CONCRETE MIX COMPANY (AL TRANSIT MIX) CONTRARY TO C OF O #51055 STATE SHOULD BE AUTO WRECKING YARD APPLNothing owed — awaiting certificate of correction
ECB03/28/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35297083M ISSUED ON 12/5/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. NOTED: ERECTED APPROX 40'X12'X8'HIGH OFFICENothing owed — awaiting certificate of correction
ECB03/28/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS. NOTED: AT PREMISES CONCRETE PLANT W/5 TRUCKS FOR DELIVERY & A TRAILERFOR OFFICE USE CONTRARY TO C OF O#51055. REMEDY: DISC ILLEGAL USE ORNothing owed — awaiting certificate of correction
ECB03/08/2018WORK W/OUT A PERMIT. @ TIME OF INSP NOTED: @ EXP#1 METAL FENCE THAT IS AROUND 9'X16' & EXP#4 METAL FENCE IS AROUND 80'X20' LONG. NO PERMIT ONFILE W/ DOB. REM: OBTAIN ALL PERMITS.Nothing owed — awaiting certificate of correction
ECB01/19/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS. NOTED: AT PREMISES A CONCRETE PLANT WITH 4 TRUCKS FOR DELIVERY AND A TRAILER FOR OFFICE USE CONTRARY TO COFO #51055Nothing owed — awaiting certificate of correction
ECB01/12/2018FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: OBSERVED AT TIME OF INSPECTION AT EXP#1 THE FRONT YARD LINE OF THE PROPERTY KEPT OPEN & UNSECURED ,THERE IS NO FENCE & GATE NO SECURITY MEASURES. THENothing owed — awaiting certificate of correction
ECB12/05/2017OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O ON BUILDING DEPT.RECORDS.NOTED: PER DOB RECORD C OF O NO.51055 DATED JAN 14,1977 PREMISES SHOULD BE ON AUTO WRECKING YARD.AT THE TIME OF MY INSPECTION OBSERVEDNothing owed — awaiting certificate of correction
ECB12/05/2017WORK WITHOUT A PERMIT.NOTED: ERECTED APPROX 40'X12'X8H OFFICE TRAILER FURNISHED WITH DISPATCH OFFICE AND 2PC BATHROOM SUPPORTED BY STEEL STRUCTURE IN THE GROUND.OFFICE TRAILER IS SET UP ON STEEL STRUCTURE APPRNothing owed — awaiting certificate of correction