Elevator apt, fireproof with stores
352 SHEPHERD AVENUE
BROOKLYN · BIN 3088713
💬 Discuss this project
2024Year Built
7Stories
D6Building Class
R6AZoning
51,405 sfGross Floor Area
54Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 362 SHEPHERD DEVELOPMENT LLC · 10,000 sf lot · 5.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Floor 7170p · 1 filing · 20 docs
Floor 6163p · 1 filing · 20 docs
Floor 5165p · 1 filing · 20 docs
Floor 4164p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 2168p · 1 filing · 20 docs
Floor 1166p · 1 filing · 20 docs
Cellar180p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SHINE BUILDERS INC DBA BLUE SK3907/08/2026
APPLE REALTY CAPITAL1107/08/2026
OWNER'S REP1407/08/2026
YL INTERIOR LLC603/22/2026
ALL STAR 1403/22/2026
THE OWNER OF 352 SHEPEARD103/22/2026
THE OWNER OF 362 SHEPEARD103/22/2026
SILVERCUPSCAFFOLDING103/22/2026
BLUE SKY BUILDERS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/20/2021$2.9M—SHEPHERD 1 PLAZA LLC → 362 SHEPHERD DEVELOPMENT LLC— not available
03/03/2021$1.7M—BONDOM CORP → SHEPHERD 1 PLAZA LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U2603/21/2026
THE GREEN STUDIO303/21/2026
GEIGER E A GROUP203/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor2307/08/2026
GWT ENTERPRISES INCGeneral Contractor1007/08/2026
Y&L INTERIOR LLCGeneral Contractor707/08/2026
JEONG YUNGElectrical503/21/2026
INTELOGIC ELECTRIC INC 003404General Contractor503/22/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
HIVOLTS ELECTRICAL INC 004090General Contractor203/22/2026
BLUE SHINE BUILDERS INCGeneral Contractor107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
SHMUEL WIEDERElectrical103/21/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162312/01/2025
Building Lifecycle
All (169)Filed (31)Permit Issued (26)Signed Off (17)Violation (10)Inspection (18)Objection (34)Special Inspection (30)Tax Incentive (3)
06/01/2027
421-a(16) construction completed
06/22/2026
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-I1
12/01/2025
Filed — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-A4
11/27/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/27/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
11/27/2025
Special inspection requirement — Metering
FAHAD FATEH
11/27/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/27/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/27/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/27/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/27/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
11/27/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/27/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/27/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/27/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FAHAD FATEH
11/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/27/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
11/27/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
11/27/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
02/05/2025
Objection resolved — Addressed
02/04/2025
Objection raised — Zoning
01/30/2025
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S5
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/28/2025
Filed — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-A3
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/22/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/22/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/22/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
01/22/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/22/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
01/22/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/22/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2025
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S9
01/14/2025
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-Z1
01/14/2025
Filed — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-A2
01/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
12/23/2024
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S4
12/16/2024
Filed — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-A1
12/13/2024
Objection resolved — Addressed
12/09/2024
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S7
12/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/04/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/27/2024
Signed off — Alteration
B00610383-I1
11/27/2024
Objection raised — Other
11/26/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/22/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
11/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/19/2024
Filed — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-P9
11/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/18/2024
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S3
11/18/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/13/2024
Signed off — New Building
PROPOSED NEW EIGHT STORY & CELLAR MIXED USE BUILDING.
B00610324-S2
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUE SHINE BUILDERS INC10/03/2024
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC09/04/2024
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC07/23/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC07/01/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC07/01/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC06/20/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/20/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC06/20/2024
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC06/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC06/14/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC05/22/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC05/22/2024
DOB NOWPlumbingSigned-offYG SERVICES INC05/15/2024
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC05/09/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC05/09/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC05/09/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC03/18/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC02/16/2024
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC02/16/2024
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC02/06/2024
DOB NOWEarth WorkSigned-offINNOVATIVE CONSTR NYC LLC01/18/2024
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC01/08/2024
DOB NOWConstruction FenceSigned-offY&L INTERIOR LLC06/09/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/31/2022
DOB NOWEarth WorkSigned-offY&L INTERIOR LLC06/08/2022
DOB NOWConstruction FenceSigned-offY&L INTERIOR LLC04/28/2022
BIS—ISSUEDSTAR COMPANIESS LLC10/13/2022
BIS—ISSUEDALL STAR 1 LLC05/26/2022
BISBLISSUEDHI-TECH HEATING CORP11/14/2014
1 project · most recent 12/01/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2025Signed-offINNOVATIVE CONSTR NYC LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×1
5MXS48WVJU9 47,500 BTU · Condensing Unit ×1
Heating
Daikin 4MXS36WMVJU9 36,000 BTU · Condensing Unit ×1
5MXS48WVJU9 48,500 BTU · Condensing Unit ×1
Ventilation
Rupp Air CFA150RA 50 CFM · Exhaust Fan ×30
DR33HRA 550 CFM · Exhaust Fan ×3
CFA-150RA 80 CFM · Exhaust Fan ×2
DR50HRA 750 CFM · Exhaust Fan ×2
CFA250RA 100 CFM · Exhaust Fan ×1
DR12HRA 375 CFM · Exhaust Fan ×1
1 project · most recent 12/01/2025
Sprinkler System
FiledStatusContractorScope
12/01/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 12/01/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/01/2025Signed-offMPI PLUMBING CORPGas, Storm, Water/Sanitary
5 projects · most recent 12/24/2024
General Wiring
FiledStatusContractorScope
12/24/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
04/15/2024CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
04/12/2024CompleteSOLAS ELECTRICAL CORP—
03/29/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
03/28/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 12/01/2025
Concrete Masonry
FiledStatusContractorScope
12/01/2025Signed-offINNOVATIVE CONSTR NYC LLCConcrete, Masonry
1 project · most recent 12/01/2025
Earthwork
FiledStatusContractorScope
12/01/2025Signed-offINNOVATIVE CONSTR NYC LLCEarthwork
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/22/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/21/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/21/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/28/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/27/2025Exterior lighting powerFAHAD FATEHenergy_progress
11/27/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/27/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/27/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
11/27/2025Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
11/27/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
11/27/2025MeteringFAHAD FATEHenergy_progress
11/27/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
11/27/2025Interior lighting powerFAHAD FATEHenergy_progress
11/27/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/27/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/27/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
11/27/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/27/2025Fenestration areasFAHAD FATEHenergy_progress
11/27/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/27/2025Maintenance informationFAHAD FATEHenergy_progress
11/27/2025Fenestration air leakageFAHAD FATEHenergy_progress
11/27/2025Lighting controlsFAHAD FATEHenergy_progress
11/27/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
01/22/2025Exterior lighting powerFAHAD FATEHenergy_progress
01/22/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/22/2025Interior lighting powerFAHAD FATEHenergy_progress
01/22/2025Maintenance informationFAHAD FATEHenergy_progress
01/22/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/22/2025Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
Latest 25 of 150.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/31/2026B00670316-I1Request digital key ↗
08/31/2026B00610383-I1Request digital key ↗
08/26/2026B00937625-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION9
09/18/2024321025886Open ↗
08/12/2024340833744Open ↗
08/09/2024340833744Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
10/13/2022322099037Open ↗
11/18/2014321025886Open ↗
11/18/2014321025886Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD - Permit Notice3
08/23/2026B00610324-I1Open ↗
08/13/2026B00610324-I1Open ↗
08/13/2026B00610324-S7Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/29/2024340833744Open ↗
02/28/2022340833744Open ↗
▸Zoning, Tax Lot & Property Records36
▸DOB NOWRestrictive Declaration/Easement 119
08/13/2026B00610324-P6Open ↗
08/13/2026B00610324-S9Open ↗
08/13/2026B00610324-P8Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram7
08/13/2026B00610324-A3Open ↗
08/13/2026B00610324-A4Open ↗
08/13/2026B00610324-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/13/2026B00610324-A1Open ↗
08/13/2026B00610324-A3Open ↗
08/13/2026B00610324-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026B00610324-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications108
▸DOB NOWSpecial Inspector Seal & Signature34
09/19/2026B00610324-S7Open ↗
09/19/2026B00610324-S7Open ↗
09/02/2026B00610324-P7Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/19/2026B00610324-S7Open ↗
09/02/2026B00610324-P7Open ↗
09/02/2026B00610324-P7Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/31/2026B00610383-I1Open ↗
08/28/2026B00792130-I1Open ↗
08/26/2026B00937625-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/17/2015321025886Open ↗
04/17/2015321025886Open ↗
04/17/2015321025886Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2014321025886Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/28/2022340833744Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/18/2014321025886Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/13/2026B00610324-A3Open ↗
08/13/2026B00610324-A4Open ↗
08/13/2026B00610324-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
04/17/2015321025886Open ↗
04/17/2015321025886Open ↗
11/18/2014321025886Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026B00610324-I1—
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist7
08/23/2026B00610324-A1Open ↗
08/23/2026B00610324-P6Open ↗
08/23/2026B00610324-P5Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
10/29/2024340833744Open ↗
02/28/2022340833744Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/29/2024340833744Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/08/2022322099037Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/08/2022322099037Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00610324-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸DOB NOWOER: Notice to Proceed18
08/13/2026B00610324-S7Open ↗
08/13/2026B00610324-S2Open ↗
08/13/2026B00610324-P9Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026B00610324-S3Open ↗
08/13/2026B00610324-S2Open ↗
08/13/2026B00610324-S7Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/03/2024340833744Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/29/2024340833744Open ↗
▸BISRODENT CONTROL1
10/13/2022322099037Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/18/2014321025886Open ↗
11/18/2014321025886Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/23/2026B00610324-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT6
08/13/2026B00610324-S2Open ↗
08/13/2026B00610324-S1Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/13/2022322099037Open ↗
10/13/2022322099037Open ↗
10/13/2022322099037Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/18/2014321025886Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/13/2022322099037Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
10/13/2022322099037Open ↗
05/06/2015321025886Open ↗
04/17/2015321025886Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/28/2022340833744Open ↗
11/18/2014321025886Open ↗
▸BISEFILING COVER SHEET1
08/20/2021322099037Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/29/2024340833744Open ↗
▸BISBOROUGH INTAKE FORM1
08/20/2021322099037Open ↗
▸Other Documents29
▸DOB NOWSite Survey: Initial7
08/13/2026B00610324-A4Open ↗
08/13/2026B00610324-P2Open ↗
08/13/2026B00610324-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/23/2026B00610324-P5Open ↗
08/23/2026B00610324-P6Open ↗
08/23/2026B00610324-A1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00610324-S1Open ↗
08/13/2026B00610324-S2Open ↗
08/13/2026B00610324-S7Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/29/2024340833744Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD - Completion Notice1
08/23/2026B00610324-I1Open ↗