ECB07/24/2025FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: THE PREMISES IS IN A STATE OF SEVERE DISREPAIR THROUGHOUT WITH PARTIALLY COLLAPSED FLOORS AND CEILINGS. THERE IS EXCESSIVE CLUTTER THROUGHOUT WITH DOORS AND W$12K due
DOB07/23/2025PREMISES IN A STATE OF SEVERE DISREPAIR WITH WATER DAMAGE THROUGHOUT AND PARTIALLY COLLAPSED FLOORS AND CEILINGS.
ECB06/28/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER : AT TIME OF INSPECTION OF A 2 STORY BUILDING OBSERVED BRICKS AND MASONRY STEPS AT EXPO. #1 BROKEN AND MISSING. GUTTER SYSTEM AT EXPO. #4 MISSING AND DISREP$3K due
ECB08/18/2018FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. OBSERVED BRICK MASONRY STEPS AT EXP#1 BROKEN & MISSING W/DISLODGED BRICKS. REMEDY: MAINTAIN EXTERIOR BLDG.$500 due
Two family frame · 2,268 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.