← Back
Four families
3521 TRYON AVENUE
BRONX · BIN 2018276
💬 Discuss this project
1920Year Built
2Stories
C3Building Class
R7-1Zoning
3,485 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGT ARCHITECTURE P.C.108/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513108/09/2024
Building Lifecycle
All (36)Filed (1)Permit Issued (1)Signed Off (1)Violation (22)Inspection (2)Special Inspection (9)
12/20/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. 2-STORY RESIDENTIAL BUILDING. WORK ON 1ST AND 2ND FLOOR FRONT APARTMENTS ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X01071476-I1
11/13/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/07/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/16/2024
Permit issued — General Construction
X01071476-I1-GC
08/09/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. 2-STORY RESIDENTIAL BUILDING. WORK ON 1ST AND 2ND FLOOR FRONT APARTMENTS ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
X01071476-I1
07/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
06/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
06/24/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
06/24/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
06/24/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
06/24/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
06/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
04/03/2024
Violation issued (HPD, closed)
A
03/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, closed)
A
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
C
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
C
08/31/2023
Violation issued (HPD, open)
C
03/17/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
10/12/2018
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
12/29/2004
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC08/16/2024
1 project · most recent 07/31/2024
General Wiring
FiledStatusContractorScope
07/31/2024CompleteDD&G ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/13/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/07/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/22/2024Tenant Protection Plan ComplianceDEZHANG FANGspecial
06/24/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
06/24/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
06/24/2024Insulation placement and R valuesDEZHANG FANGenergy_progress
06/24/2024Interior lighting powerDEZHANG FANGenergy_progress
06/24/2024Fenestration areasDEZHANG FANGenergy_progress
06/24/2024Fenestration air leakageDEZHANG FANGenergy_progress
06/24/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
06/24/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01071476-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X01071476-I1Open ↗
08/26/2026X01071476-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01071476-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01071476-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01071476-I1Open ↗