Elevator apt, semi-fireproof without stores
353 BAY RIDGE PARKWAY
BROOKLYN · Bay Ridge · BIN 3148285
💬 Discuss this project
1961Year Built
6Stories
D1Building Class
R5BZoning
30,000 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized3 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Epsilon 353 2F · 7,500 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Eftri Holdings LLC2p · 1 filing · 2 docs
CellarEftri Holdings LLC4p · 2 filings · 7 docs
Site & exteriorInstallation of Temporary Pipe Scaffold11p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Eftri Holdings1107/08/2026
The Baldwin1103/21/2026
Epsilon Holdings303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2021$7.2M—THE BALDWIN, LLC → EPSILON 353 2F LLC$242/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Basic Groups110/03/2022
Syed Engineering208/26/2022
Enthink Engineers110/26/2021
New York & Company210/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Expediting203/21/2026
Basic Groups203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cube Builders Group NYGeneral Contractor303/21/2026
MNK EnterprisesScaffold303/21/2026
KJK ElectricElectrical203/21/2026
Dong TangGeneral Contractor103/21/2026
Master ConstructionGeneral Contractor107/08/2026
Topline NYC ContractingScaffold107/08/2026
Bell Fuel OilPlumbing107/08/2026
Approved EnergyPlumbing110/02/2015
Casella ConstructionGeneral Contractor109/09/2014
Everest ScaffoldingGeneral Contractor107/20/2011
Jade RestorationGeneral Contractor108/01/2011
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Andrew Goodrich, P.E.965110/03/2022
Syed Engineering7054208/26/2022
New York Engineering Associates851110/21/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/02/2026
Elevator Category 1 inspection report filed
07/09/2026
Closed: Partial vacate order-as observed by facade inspector on 08/09/2022 there is a loose coping stone and mortar joints at top of chimney at EXP4 east…
DOB violation · closed on the city's record
05/11/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/28/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND EAST WALL IN THE BATHROOM LOCATED AT…
HPD violation · closed
147 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTopline NYC Contracting04/28/2023
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY03/13/2023
DOB NOWGeneral ConstructionSigned-offMaster Construction11/12/2021
DOB NOWPlumbingSigned-offApproved Energy11/01/2021
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn11/01/2021
DOB NOWSidewalk ShedSigned-offMNK Enterprises10/27/2021
BISOTISSUEDDong & Tang02/17/2016
BISBLRE-ISSUEDApproved Oil Co of Brooklyn10/02/2015
BISPLISSUEDBell Fuel Oil10/02/2015
BISOTISSUEDCasella Construction09/09/2014
BISOTISSUEDJade Restoration08/01/2011
BISEQISSUEDEverest Scaffolding07/20/2011
2 projects · most recent 09/01/2022
General Wiring
FiledStatusContractorScope
09/01/2022Permit IssuedKJK ElectricGeneral Wiring
10/27/2021CompleteRichard Neu—
1 project · most recent 08/26/2022
Scaffold
FiledStatusContractorScope
08/26/2022Permit IssuedTopline NYC ContractingScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/15/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/18/2022Post-installed AnchorsRAFI HAMIDspecial
94 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account