← Back
Elevator cooperative
353 RIVERSIDE DRIVE
MANHATTAN · BIN 1057292
💬 Discuss this project
1901Year Built
5Stories
D4Building Class
R8Zoning
10,670 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Elevator cooperative · 4,108 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOODSTOCK TENANT CORP.2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COSMO VENEZIALE, ARCHITECT, P.L.L.C105/23/2023
H2 CONSULTING PE PC105/23/2023
THE VSA GROUP203/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
VSA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DINO KOLJENOVIC BDC CORPGeneral Contractor603/21/2026
GC LEADER CONSTRUCTION COGeneral Contractor407/08/2026
SENAD MEHOVICElectrical203/21/2026
PINPOINT ELECTRIC CORPElectrical103/22/2026
GRZEGORZ CZYZEWSKIGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H2 CONSULTING PE PC835205/23/2023
SOCOTEC ENGINEERING4983203/31/2023
STUDIO NYANDAK ARCHITECTU8378103/31/2023
THE VSA GROUP1767102/02/2023
Building Lifecycle
All (48)Filed (4)Permit Issued (4)Signed Off (4)Violation (29)Special Inspection (7)
10/03/2025
Violation issued (HPD, closed)
C
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
C
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
A
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
A
06/22/2025
Violation issued (HPD, closed)
A
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
A
06/22/2025
Violation issued (HPD, closed)
A
04/25/2025
Violation issued (ECB, closed)
Construction
04/14/2025
Signed off — Alteration
Structural supporting framing for elevator bulkhead approved under application M00821989-I1. No change of use, occupancy or egress.
M00821989-I1
03/28/2025
Signed off — Alteration
Structural supporting framing for elevator bulkhead approved under application M00821989-I1. No change of use, occupancy or egress.
M00821989-S1
09/06/2024
Signed off — Alteration
Herewith filing to Install new steel lintel for new glass sliding doors opening as per the drawings. No change in use, egress or occupancy.
M00815400-S1
09/05/2024
Signed off — Alteration
Herewith filing to Install new steel lintel for new glass sliding doors opening as per the drawings. No change in use, egress or occupancy.
M00815400-I1
09/04/2024
Permit issued — Structural
M00815400-S1-ST
09/29/2023
Permit issued — General Construction
M00815400-I1-GC
05/23/2023
Filed — Alteration
Herewith filing to Install new steel lintel for new glass sliding doors opening as per the drawings. No change in use, egress or occupancy.
M00815400-S1
05/23/2023
Filed — Alteration
Herewith filing to Install new steel lintel for new glass sliding doors opening as per the drawings. No change in use, egress or occupancy.
M00815400-I1
04/19/2023
Permit issued — Structural
M00821989-S1-ST
04/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Harry Hong
03/31/2023
Filed — Alteration
Structural supporting framing for elevator bulkhead approved under application M00821989-I1. No change of use, occupancy or egress.
M00821989-S1
03/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Cosmo Veneziale
03/15/2023
Violation issued (HPD, closed)
A
02/21/2023
Permit issued — General Construction
M00821989-I1-GC
02/02/2023
Filed — Alteration
Structural supporting framing for elevator bulkhead approved under application M00821989-I1. No change of use, occupancy or egress.
M00821989-I1
02/02/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Francesco Bruni
02/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Francesco Bruni
02/01/2023
Special inspection requirement — Final
Francesco Bruni
01/19/2023
Special inspection requirement — Final
Cosmo Veneziale
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
09/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/17/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/19/2007
Violation issued (ECB, closed)
Boilers
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/01/2002
Violation issued (ECB, closed)
Elevators
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGC LEADER CONSTRUCTION CO09/04/2024
DOB NOWGeneral ConstructionSigned-offGC LEADER CONSTRUCTION CO09/29/2023
DOB NOWStructuralSigned-offDINO KOLJENOVIC BDC CORP04/19/2023
DOB NOWGeneral ConstructionSigned-offDINO KOLJENOVIC BDC CORP02/21/2023
BISBLISSUEDNEW YORK HEATING CORP11/17/2006
BISPLISSUEDNEW YORK HEATING CORP11/17/2006
3 projects · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompleteE & M ELECTRICAL NY CORPGeneral Wiring
06/11/2024CompleteELBUD ELECTRICAL CORPGeneral Wiring
08/26/2021Permit IssuedPINPOINT ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/12/2023Tenant Protection Plan ComplianceHarry Hongspecial
03/21/2023Energy Code Compliance InspectionsCosmo Venezialeprogress
02/02/2023Wall Panels, Curtain Walls, and VeneersFrancesco Brunispecial
02/02/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
02/02/2023Energy Code Compliance InspectionsFrancesco Bruniprogress
02/01/2023FinalFrancesco Bruniprogress
01/19/2023FinalCosmo Venezialeprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026M00821989-I1Request digital key ↗
08/31/2026M00821989-S1Request digital key ↗
08/31/2026M00815400-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit4
08/13/2026M00821989-S1Open ↗
08/13/2026M00815400-I1Open ↗
08/13/2026M00815400-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/06/2022100794972Open ↗
10/18/2021100794972Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00815400-S1Open ↗
08/13/2026M00815400-I1Open ↗
08/13/2026M00821989-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026M00815400-I1Open ↗
08/23/2026M00815400-I1Open ↗
08/22/2026M00821989-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M00815400-I1Open ↗
08/22/2026M00821989-I1Open ↗
08/22/2026M00821989-I1Open ↗
▸Safety & Tenant Protection1
▸BIS* SHORING 27-10101
12/19/2022100794972Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00821989-I1Open ↗
08/13/2026M00821989-S1Open ↗
08/13/2026M00815400-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/24/2023100794972Open ↗
02/16/2023100794972Open ↗
11/21/2022100794972Open ↗
Showing 3 of 4 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
12/19/2022100794972Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/27/2023100794972Open ↗
11/22/2017104603564Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/24/2023100794972Open ↗
11/22/2017104603564Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
09/21/2022100794972Open ↗
▸BISBOROUGH INTAKE FORM1
11/22/2017104603564Open ↗
▸Other Documents2
▸BIS* FIRE STOPS 27-3451
12/19/2022100794972Open ↗
▸BIS* UNDERPINNING 27-7241
12/19/2022100794972Open ↗