← Back
Four families
353 VERNON AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3042913
💬 Discuss this project
1931Year Built
2.5Stories
C3Building Class
R6BZoning
2,625 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Four families · Owner of record: PSA 353 VERNON LLC · 2,000 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalGeneral
Roof2p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSA BROOKLYN DEVELOPMENT LLC1807/08/2026
PSA 353 VERNON LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/12/2023$1.4M—— → —$543/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.604/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor407/08/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781404/05/2024
Building Lifecycle
All (109)Filed (6)Permit Issued (3)Signed Off (3)Violation (60)Inspection (7)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, closed)
A
05/15/2024
Signed off — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-S2
05/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2024
Signed off — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-I1
04/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/17/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/12/2024
Violation issued (HPD, closed)
A
04/08/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
04/08/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/05/2024
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-P3
04/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/25/2024
Signed off — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-S3
03/22/2024
Permit issued — Mechanical Systems
B00969709-S3-MS
03/21/2024
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-S3
03/20/2024
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-P2
03/11/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/11/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/08/2024
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-P1
03/04/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
12/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/19/2023
Permit issued — Plumbing
B00969709-S2-PL
12/07/2023
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-S2
12/05/2023
Permit issued — General Construction
B00969709-I1-GC
11/30/2023
Filed — Alteration
EXISTING 4 FAMILY BUILDING WITH MECHANICAL WORK IN CONJUNCTION WITH ALT2 JOB # B00969709-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00969709-I1
11/17/2023
Violation issued (HPD, closed)
I
04/17/2023
Violation issued (HPD, closed)
A
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMORELL BUILDERS INC03/22/2024
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC12/19/2023
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC12/05/2023
1 project · most recent 04/05/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/05/2024Signed-offMORELL BUILDERS INCHeating and Air Conditioning Systems
Heat / Cool
Durastar DRHP14A42AJ2ANA 42,000 BTU · Condensing Unit ×12
Bryant 114SAN03600NABAB 36,000 BTU · Condensing Unit ×4
1 project · most recent 04/05/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/05/2024Signed-offVMC PLUMBING & HEATING INGas, Storm, Water/Sanitary
1 project · most recent 05/08/2024
General Wiring
FiledStatusContractorScope
05/08/2024Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/17/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
04/08/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/08/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/08/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/08/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/08/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/08/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
04/08/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/08/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/08/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
04/08/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
04/08/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/08/2024MeteringCHRISTIAN LOZADAenergy_progress
04/04/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/04/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
04/04/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/04/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
04/04/2024MeteringCHRISTIAN LOZADAenergy_progress
04/04/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/04/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/04/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
04/04/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/04/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/04/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/04/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/11/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
Latest 25 of 53.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00969709-I1Request digital key ↗
08/26/2026B00969709-P3Request digital key ↗
08/26/2026B00969709-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00969709-I1Open ↗
09/01/2026B00969709-I1Open ↗
09/01/2026B00969709-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00969709-I1Open ↗
08/26/2026B00969709-P3Open ↗
08/26/2026B00969709-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00969709-I1Open ↗
08/26/2026B00969709-P2Open ↗
08/23/2026B00969709-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00969709-I1Open ↗
08/26/2026B00969709-P3Open ↗
08/26/2026B00969709-P2Open ↗
Showing 3 of 6 on file for this type