← Back
BuildNYC
Primarily 2 family with 1 store or office
354 7TH AVENUE
BROOKLYN · Park Slope · BIN 3022706
💬 Discuss this project
1885Year Built
3Stories
S2Building Class
R6AZoning
3,781 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Seventh K Realty · 1,527 sf lot · 2.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Third K Realty LLC38p · 3 filings · 20 docs
CellarThird K Realty LLC43p · 2 filings · 20 docs
Site & exteriorHanco's28p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Seventh K Realty2007/08/2026
Third K Realty903/21/2026
Atlantic K Realty503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2014$2.1M—— → —$569/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SY Engineering712/15/2022
NYX Engineering101/21/2022
Adam Aaron Architect104/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting703/21/2026
Franklyn Estrella Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & L Service NYCGeneral Contractor407/08/2026
Ultra General ContractingGeneral Contractor203/21/2026
E & M Electrical ContractingElectrical103/22/2026
A1 SpecializedSign hanger107/08/2026
Pinnacle Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY Engineering5149312/15/2022
Adam Aaron Architect6408104/28/2021
Alpha Engineering3448104/28/2021
Building Lifecycle
All (56)Filed (9)Permit Issued (5)Signed Off (4)Violation (5)Inspection (5)Special Inspection (28)
09/29/2025
Violation issued (FDNY_ORDER, closed)
09/29/2025
Violation issued (FDNY_ORDER, closed)
09/29/2025
Violation issued (FDNY_ORDER, closed)
03/03/2023
Signed off — Alteration
Interior renovation of existing commercial space to be a eating and drinki ng establishemnt with commercial cooking equipments at 001, and accessaory storage use on cellar , PL work filed seperatedly, no change in use, egress or occupancy
B00609523-I1
02/28/2023
Signed off — Alteration
file plumbing work for eating and drinking estatblisehemnt with cooking equipemtns at 001, no change in use, egress or occupancy
B00610331-I1
02/14/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2022
Special inspection requirement — Maintenance information
SUNGBOM YI
12/16/2022
Special inspection requirement — Mechanical Systems
SUNGBOM YI
12/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SUNGBOM YI
12/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
12/16/2022
Special inspection requirement — Final
SUNGBOM YI
12/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
SUNGBOM YI
12/16/2022
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
12/16/2022
Special inspection requirement — Shutoff dampers
SUNGBOM YI
12/16/2022
Special inspection requirement — Interior lighting power
SUNGBOM YI
12/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
12/16/2022
Special inspection requirement — Electrical motors and elevators
SUNGBOM YI
12/16/2022
Special inspection requirement — Metering
SUNGBOM YI
12/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
12/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
12/15/2022
Filed — Alteration
Interior renovation of existing commercial space to be a eating and drinki ng establishemnt with commercial cooking equipments at 001, and accessaory storage use on cellar , PL work filed seperatedly, no change in use, egress or occupancy
B00609523-P3
12/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
12/08/2022
Special inspection requirement — Mechanical Systems
SUNGBOM YI
12/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SUNGBOM YI
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
12/08/2022
Special inspection requirement — Final
SUNGBOM YI
12/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
SUNGBOM YI
12/08/2022
Special inspection requirement — Maintenance information
SUNGBOM YI
12/08/2022
Special inspection requirement — Metering
SUNGBOM YI
12/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
12/08/2022
Special inspection requirement — Electrical motors and elevators
SUNGBOM YI
12/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
12/08/2022
Special inspection requirement — Shutoff dampers
SUNGBOM YI
12/08/2022
Special inspection requirement — Interior lighting power
SUNGBOM YI
12/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
12/01/2022
Filed — Alteration
file plumbing work for eating and drinking estatblisehemnt with cooking equipemtns at 001, no change in use, egress or occupancy
B00610331-P3
04/11/2022
Signed off — Alteration
B00646047-I1
04/05/2022
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
03/30/2022
Permit issued — Sign
B00646047-I1-SG
01/28/2022
Filed — Alteration
file plumbing work for eating and drinking estatblisehemnt with cooking equipemtns at 001, no change in use, egress or occupancy
B00610331-P2
01/28/2022
Permit issued — Mechanical Systems
B00609523-I1-GC-CX
01/21/2022
Filed — Alteration
B00646047-I1
01/11/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/03/2022
Filed — Alteration
file plumbing work for eating and drinking estatblisehemnt with cooking equipemtns at 001, no change in use, egress or occupancy
B00610331-P1
12/16/2021
Filed — Alteration
Interior renovation of existing commercial space to be a eating and drinki ng establishemnt with commercial cooking equipments at 001, and accessaory storage use on cellar , PL work filed seperatedly, no change in use, egress or occupancy
B00609523-P1
11/10/2021
Permit issued — Plumbing
B00610331-I1-PL
10/28/2021
Permit issued — Mechanical Systems
B00609523-I1-GC-CX
10/20/2021
Filed — Alteration
Interior renovation of existing commercial space to be a eating and drinki ng establishemnt with commercial cooking equipments at 001, and accessaory storage use on cellar , PL work filed seperatedly, no change in use, egress or occupancy
B00609523-I1
10/20/2021
Filed — Alteration
file plumbing work for eating and drinking estatblisehemnt with cooking equipemtns at 001, no change in use, egress or occupancy
B00610331-I1
08/24/2021
Signed off — Alteration
B00508581-I1
06/25/2021
Permit issued — General Construction
B00508581-I1-GC
04/28/2021
Filed — Alteration
B00508581-I1
04/24/1989
Violation issued (ECB, closed)
Boilers
04/11/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMad Signs03/30/2022
DOB NOWMechanical SystemsSigned-offJ & L Service NYC01/28/2022
DOB NOWPlumbingSigned-offPinnacle Plumbing & Heating11/10/2021
DOB NOWMechanical SystemsSigned-offJ & L Service NYC10/28/2021
DOB NOWGeneral ConstructionSigned-offUltra General Contracting06/25/2021
BISMHISSUEDWT Builders09/30/2015
BISPLISSUEDHenry Myers P & H08/17/2015
BISOTISSUEDWT Builders08/12/2015
BISOTISSUEDWT Builders05/06/2015
BISPLISSUEDHenry Myers P & H04/08/2015
BISOTISSUEDWT Builders03/02/2015
4 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteE & M Electrical NYGeneral Wiring
07/18/2025CompleteE & M Electrical ContractingGeneral Wiring
11/01/2024CancelledE & M Electrical NYGeneral Wiring
11/15/2021CompleteFirst Star ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/05/2022Pass-Final Sign Permit InspectionPassView ↗
01/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/16/2022Maintenance informationSUNGBOM YIenergy_progress
12/16/2022Mechanical SystemsSUNGBOM YIspecial
12/16/2022Structural Stability – Alterations of existing buildingsSUNGBOM YIspecial
12/16/2022Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
12/16/2022FinalSUNGBOM YIprogress
12/16/2022Fire-Resistance Rated ConstructionSUNGBOM YIprogress
12/16/2022Energy Code Compliance InspectionsSUNGBOM YIprogress
12/16/2022Shutoff dampersSUNGBOM YIenergy_progress
12/16/2022Interior lighting powerSUNGBOM YIenergy_progress
12/16/2022HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
12/16/2022Electrical motors and elevatorsSUNGBOM YIenergy_progress
12/16/2022MeteringSUNGBOM YIenergy_progress
12/16/2022HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
12/16/2022HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
12/08/2022Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
12/08/2022Mechanical SystemsSUNGBOM YIspecial
12/08/2022Structural Stability – Alterations of existing buildingsSUNGBOM YIspecial
12/08/2022Energy Code Compliance InspectionsSUNGBOM YIprogress
12/08/2022FinalSUNGBOM YIprogress
12/08/2022Fire-Resistance Rated ConstructionSUNGBOM YIprogress
12/08/2022Maintenance informationSUNGBOM YIenergy_progress
12/08/2022MeteringSUNGBOM YIenergy_progress
12/08/2022HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
12/08/2022Electrical motors and elevatorsSUNGBOM YIenergy_progress
12/08/2022HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hanco'sRestaurant / Food Service—
Project B00646047 Alteration · LOC Issued · 01/21/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00508581-I1Request digital key ↗
09/01/2026B00610331-P1Request digital key ↗
09/01/2026B00610331-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits19
▸DOB NOWLPC Approval/Permit9
08/13/2026B00609523-I1Open ↗
08/13/2026B00609523-P3Open ↗
08/13/2026B00610331-P3Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
10/06/2015321118492Open ↗
08/18/2015321118492Open ↗
08/13/2015321118492Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/13/2023321091643Open ↗
08/07/2015321118492Open ↗
05/07/2015321118492Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00508581-I1Open ↗
09/01/2026B00610331-P1Open ↗
09/01/2026B00610331-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/23/2026B00609523-P3Open ↗
08/23/2026B00609523-P3Open ↗
08/23/2026B00609523-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026B00609523-P3Open ↗
08/23/2026B00609523-P3Open ↗
08/23/2026B00609523-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/24/2015321091643Open ↗
10/22/2015321118492Open ↗
05/07/2015321118492Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/02/2015321091643Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/02/2015321091643Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/07/2015321118492Open ↗
05/07/2015321118492Open ↗
03/02/2015321091643Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/04/2015321091643Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/07/2015321118492Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00508581-I1Open ↗
09/01/2026B00610331-I1Open ↗
09/01/2026B00610331-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/07/2015321118492Open ↗
03/02/2015321091643Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/22/2015321118492Open ↗
05/07/2015321118492Open ↗
03/02/2015321091643Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/22/2015321118492Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00609523-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLANDMARKS APPROVAL3
10/22/2015321118492Open ↗
05/14/2015321118492Open ↗
03/02/2015321091643Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2015321118492Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/22/2015321118492Open ↗
05/07/2015321118492Open ↗
03/02/2015321091643Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/07/2015321118492Open ↗
03/02/2015321091643Open ↗