ECB02/26/2026AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED IN PLACE; REVIEW OF DEPARTMENT RECORDS INDICATES NO PERMIT WAS EVER OBTAINED FOR THIS TEMPORARY CONSTRUCTION EQUIPMENT. CONTRARY TO AC 28-105.1, REQUIRED PERMITS WE$6K due
ECB02/26/2026AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED WITH INADEQUATE ILLUMINATION AS REQUIRED. CONTRARY TO BC 3307.6.4.8, FAILURE TO PROVIDE REQUIRED LIGHTING BENEATH SHED CREATES UNSAFE CONDITION FOR PEDESTRIANS AND$10K due
ECB08/11/2025FAILURE TO COMPLY AND SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 35676654R ISSUED ON 02/22/2024 FOR FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES., MAINTAIN EXTERIOR BUILDING WALL$25K due
ECB08/11/2025FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39057571Y ISSUED ON 38/07/2022 FOR FAILURE TO MAINTAIN BUILDING., FILE A CERTIFICATE OF CORRECTION$6K due
DOB02/23/2024INSTALL A SIDEWALK SHED 19 FEET AT THE FRONNT OF THE BUILDING PLUS 5 F EET ON EACH SIDE
ECB02/22/2024FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. DEFECTS NOTED: EXTERIOR FRONT FACADE IS CRACKED IN VARIOUS PLACES. CONCRETE WINDOWS LINTEL MISSING AND CRACKED ON 2ND AND 3RD FLOOR. REMEDY: MAINTAIN EXTER$12K due
ECB05/26/2023WORK WITHOUT PERMIT. OBSERVED A DECK CONSTRUCTED OVER GROUND FLOOR EXTENSION AT 1ST FLOOR ROOF LEVEL APPROXIMATELY 400 SQUARE FEET IN DIAMETER. FENCING ALSO WAS CONSTRUCTED APPROXIMATELY 6FT X 20FT ABOVE DECK.$6K due
DOB03/07/2022FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGED STAIR TREAD ON THE FIRE ESCAPE BETWEEN THE 2ND AND 3RD FLOORS OF EXPOSURE #1. ALSO OBSERVED CRACKS/STAIRCASING TO BRICK AND MORTAR JOINTS, MISSING PART OF THE STONE HEADER ABOVE THE 2ND FLOOR WINDOW AND CRACK TO THE ROOF CORNICE,
ECB03/07/2022FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGED STAIR TREAD ON THE FIRE ESCAPE BETWEEN THE 2ND AND 3RD FLOORS OF EXPOSURE #1. ALSO OBSERVED CRACKS/STAIRCASING TONothing owed — awaiting certificate of correction