← Back
Five to six families
354 Central Park West House
354 CENTRAL PARK WEST · BIN 1031726
💬 Discuss this project
1893Year Built
5Stories
C2Building Class
R10AZoning
5,000 sfGross Floor Area
5Units
Rent Stabilized12 Open Violations ▸
Five to six families · Owner of record: 33 WEST 9TH STREET CCN238 LLC · 1,000 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 18 docs
Floor 41p · 1 filing · 8 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 12 docs
Basement1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP507/08/2026
33 WEST 9TH STREET CCN238 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2023$5.8M—— → —$1,160/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITY BUILDING NY ARCHITECT P.C.1001/31/2025
PAUL PERDEK, PROF. ENG. PLLC204/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FCO PROPERTY MAINTENANCE*General Contractor603/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY BUILDING NY ARCHITEC1394601/31/2025
Building Lifecycle
All (72)Filed (12)Permit Issued (6)Signed Off (6)Violation (15)Inspection (4)Special Inspection (29)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
03/31/2025
Signed off — Alteration
Facade work. Repair and repoint existing face brick at the building facade. Replace windows. No change in use, egress or occupancy under this application.
M01006071-I1
02/18/2025
Signed off — Alteration
M01006164-I1
02/10/2025
Special inspection requirement — Mechanical Systems
YING HAO LI
02/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
02/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
02/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
02/10/2025
Special inspection requirement — Final
YING HAO LI
01/31/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01037456-I1
01/31/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01037446-I1
01/31/2025
Filed — Alteration
M01006164-P2
01/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2025
Special inspection requirement — Final
YING HAO LI
01/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
01/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
01/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
01/27/2025
Special inspection requirement — Mechanical Systems
YING HAO LI
01/21/2025
Signed off — Alteration
M01006052-I1
01/21/2025
Signed off — Alteration
M01006156-I1
01/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
12/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
YING HAO LI
12/17/2024
Special inspection requirement — Insulation placement and R values
YING HAO LI
12/17/2024
Special inspection requirement — Interior lighting power
YING HAO LI
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
12/13/2024
Filed — Alteration
M01006052-P2
11/22/2024
Violation issued (HPD, open)
I
11/22/2024
Special inspection requirement — Fenestration areas
YING HAO LI
11/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
YING HAO LI
11/22/2024
Special inspection requirement — Fenestration air leakage
YING HAO LI
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
11/15/2024
Filed — Alteration
Facade work. Repair and repoint existing face brick at the building facade. Replace windows. No change in use, egress or occupancy under this application.
M01006071-P1
08/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2024
Permit issued — General Construction
M01006071-I1-GC
05/14/2024
Filed — Alteration
M01006164-P1
05/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
05/07/2024
Special inspection requirement — Mechanical Systems
YING HAO LI
05/07/2024
Special inspection requirement — Final
YING HAO LI
05/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
05/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
05/06/2024
Permit issued — Mechanical Systems
M01006164-I1-MS
04/18/2024
Filed — Alteration
M01006052-P1
04/18/2024
Filed — Alteration
M01006156-P1
04/18/2024
Permit issued — Sidewalk Shed
M01037446-I1-SH
04/18/2024
Permit issued — Supported Scaffold
M01037456-I1-SF
04/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01037456-I1
04/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01037446-I1
04/09/2024
Permit issued — Plumbing
M01006156-I1-PL
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
04/08/2024
Special inspection requirement — Interior lighting power
YING HAO LI
04/08/2024
Special inspection requirement — Insulation placement and R values
YING HAO LI
04/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
YING HAO LI
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
04/01/2024
Permit issued — General Construction
M01006052-I1-GC
04/01/2024
Violation issued (HPD, open)
A
03/08/2024
Filed — Alteration
Facade work. Repair and repoint existing face brick at the building facade. Replace windows. No change in use, egress or occupancy under this application.
M01006071-I1
03/08/2024
Filed — Alteration
M01006164-I1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFCO PROPERTY MAINTENANCE*07/02/2024
DOB NOWMechanical SystemsSigned-offFCO PROPERTY MAINTENANCE*05/06/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/18/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/18/2024
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN04/09/2024
DOB NOWGeneral ConstructionSigned-offFCO PROPERTY MAINTENANCE*04/01/2024
BIS—ISSUEDSAME05/01/1996
BISOTISSUEDTHE ALFRED T. TEBBENS STEEL CORP03/21/1994
2 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteSEGA ELECTRIC LLCGeneral Wiring
04/22/2024CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
02/10/2025Mechanical SystemsYING HAO LIspecial
02/10/2025HVAC-R and service water heating system controlsYING HAO LIenergy_progress
02/10/2025HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
02/10/2025HVAC-R and service water heating equipmentYING HAO LIenergy_progress
02/10/2025FinalYING HAO LIprogress
01/27/2025FinalYING HAO LIprogress
01/27/2025HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
01/27/2025HVAC-R and service water heating system controlsYING HAO LIenergy_progress
01/27/2025HVAC-R and service water heating equipmentYING HAO LIenergy_progress
01/27/2025Mechanical SystemsYING HAO LIspecial
12/17/2024Fire-Resistant Penetrations and JointsYING HAO LIspecial
12/17/2024Fire-Resistance Rated ConstructionYING HAO LIprogress
12/17/2024Insulation placement and R valuesYING HAO LIenergy_progress
12/17/2024Interior lighting powerYING HAO LIenergy_progress
12/17/2024Energy Code Compliance InspectionsYING HAO LIprogress
11/22/2024Fenestration areasYING HAO LIenergy_progress
11/22/2024Fenestration and door U-factor and product ratingsYING HAO LIenergy_progress
11/22/2024Fenestration air leakageYING HAO LIenergy_progress
11/22/2024Energy Code Compliance InspectionsYING HAO LIprogress
05/07/2024HVAC-R and service water heating system controlsYING HAO LIenergy_progress
05/07/2024Mechanical SystemsYING HAO LIspecial
05/07/2024FinalYING HAO LIprogress
05/07/2024HVAC-R and service water heating equipmentYING HAO LIenergy_progress
05/07/2024HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
04/08/2024Fire-Resistant Penetrations and JointsYING HAO LIspecial
Latest 25 of 29.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026M01006156-P1Request digital key ↗
08/27/2026M01006156-I1Request digital key ↗
08/27/2026M01006071-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026M01006156-I1Open ↗
08/13/2026M01006156-P1Open ↗
08/13/2026M01006052-P1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M01006071-I1Open ↗
09/01/2026M01006071-I1Open ↗
09/01/2026M01006071-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026M01006156-I1Open ↗
08/27/2026M01006156-P1Open ↗
08/27/2026M01006071-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026M01006164-P2Open ↗
08/27/2026M01006164-P1Open ↗
08/25/2026M01006052-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026M01006156-I1Open ↗
08/27/2026M01006156-P1Open ↗
08/27/2026M01006071-P1Open ↗
Showing 3 of 10 on file for this type