← Back
BuildNYC
Walk-up apt, over six families with stores
354 SARATOGA AVENUE
BROOKLYN · Ocean Hill · BIN 3039059
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
R6Zoning
11,520 sfGross Floor Area
16Units
Rent Stabilized13 Active Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: S-Five Properties · 3,217 sf lot · 3.58 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 52 filings
Floor 43 filings
Floor 33 filings
Floor 23 filings
Floor 13 filings
Cellar1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Neighborhood Restore H.D.F.C403/21/2026
CB Emmanuel Realty307/08/2026
S-Five Properties203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
French & Parrello Associates111/15/2023
Michael Ivanhoe McCaw Architect602/01/2023
Jose L. Pena, P.E204/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar403/21/2026
GC1 Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CBCS ConstructionGeneral Contractor807/08/2026
Michael McCawElectrical203/21/2026
Aranda Plumbing & HeatingPlumbing207/08/2026
TristruxGeneral Contractor203/22/2026
L.S. Sign CoSign hanger207/08/2026
TristruxGeneral Contractor203/21/2026
TristruxElectrical103/21/2026
Bass ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
French & Parrello Associates1271111/15/2023
Michael Ivanhoe McCaw Architects4583602/01/2023
Sandeep Gunnala Engineering8482202/01/2023
Building Lifecycle
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/05/2026
§ 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B , 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
01/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/17/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EVIDENCE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st…
HPD violation · closed
07/26/2025
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
258 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Tristrux—
DOB NOW—Aranda Plumbing & Heating—
DOB NOW—CBCS Construction—
DOB NOW—CBCS Construction—
DOB NOW—Aranda Plumbing & Heating—
DOB NOW—CBCS Construction—
DOB NOW—CBCS Construction—
DOB NOW—Weinfeld, Elliot—
DOB NOW—Weinfeld, Elliot—
BIS—Fire Command Co—
BIS—Orbit Plumbing & Heating—
BIS—Squan Construction Services—
BIS—Orbit Plumbing & Heating—
BIS—CBCS Construction—
BIS—Squan Construction Services—
BIS—CBCS Construction—
BIS—CBCS Construction—
BIS—Orbit Plumbing & Heating—
BIS—Rock Group NY—
BIS—CBCS Construction—
BIS—CBCS Construction—
BIS—Tri-State Telecom—
BIS—Deelek Petro Fuel Oil—
BIS—Todino Sewer and Water Service—
BIS—Delek Petro Fuel Oil—
Nothing on file for this building.
Nothing on file for this building.
140 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account