← Back
Zoned commercial or Manhattan residential
3527 SHORE FRONT PARKWAY
QUEENS · BIN 4624807
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C4-4Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 107,853 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction79p · 2 filings · 20 docs
Floor 11Under Construction1 filing · 2 docs
Floor 10Under Construction78p · 2 filings · 20 docs
Floor 9Under Construction82p · 3 filings · 20 docs
Floor 8Under Construction80p · 3 filings · 20 docs
Floor 7Under Construction82p · 3 filings · 20 docs
Floor 6Under Construction80p · 3 filings · 20 docs
Floor 5Under Construction81p · 3 filings · 20 docs
Floor 4Under Construction79p · 3 filings · 20 docs
Floor 3Under Construction79p · 3 filings · 20 docs
Floor 2Under Construction80p · 3 filings · 20 docs
Floor 1Under Construction194p · 1 filing · 20 docs
CellarUnder Construction51p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RNC INDUSTRIES209/12/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
WILLIAM VITACCO ASSOCIATES1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONGRESS BUILDERS LLCGeneral Contractor1307/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor507/30/2026
RAEL AUTOMATIC SPR.CO INCFire Protection306/28/2026
RNC INDUSTRIES LLCGeneral Contractor207/30/2026
4 BROTHERS & SONS FENCEGeneral Contractor104/09/2026
PARKVIEW P&H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842803/17/2026
GEODESIGN, INC., P.C.627211/07/2023
Building Lifecycle
All (113)Filed (21)Permit Issued (21)Signed Off (1)Violation (1)Inspection (15)Objection (24)Special Inspection (30)
08/11/2026
Violation issued (ECB, open)
Construction
07/29/2026
Filed — Alteration
Application for the installation and use of material platform as per plans filed herein. No change in egress, use, or occupancy.
Q01358179-I1
07/29/2026
Permit issued — Sidewalk Shed
Q01394815-I1-SH
07/29/2026
Permit issued — Protection and Mechanical Methods
Q01358179-I1-PMM
07/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/06/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01408879-I1
07/06/2026
Permit issued — Protection and Mechanical Methods
Q01408879-I1-PMM
06/22/2026
Permit issued — Protection and Mechanical Methods
Q01394815-S2-PMM
06/18/2026
Filed — Alteration
Q01394815-S2
06/18/2026
Filed — New Building
Drilling and horizontal/vertical piping installation for Geothermal.
Q00858246-P3
06/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Permit issued — Protection and Mechanical Methods
Q01394815-S3-PMM
05/15/2026
Permit issued — Protection and Mechanical Methods
Q01394815-S4-PMM
05/14/2026
Filed — Alteration
Q01394815-S3
05/14/2026
Filed — Alteration
Q01394815-S4
05/04/2026
Permit issued — Sidewalk Shed
Q01394815-I1-SH
05/01/2026
Filed — Alteration
Q01394815-I1
04/16/2026
Inspection — Pass-Final House Connection
Pass
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/06/2026
Signed off — Alteration
Application file for test pile filed in conjunction with NB Q00858246-I1
Q01307214-I1
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2026
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
03/25/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
CONNIE PISANI
03/25/2026
Special inspection requirement — Protection of exposed foundation insulation
CONNIE PISANI
03/25/2026
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
03/25/2026
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
03/25/2026
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
03/25/2026
Special inspection requirement — Fenestration areas
CONNIE PISANI
03/25/2026
Special inspection requirement — Air barrier continuity plan testing
CONNIE PISANI
03/25/2026
Special inspection requirement — Vestibules
CONNIE PISANI
03/25/2026
Special inspection requirement — Lowest Floor Elevation
CONNIE PISANI
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
03/25/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
CONNIE PISANI
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
03/25/2026
Special inspection requirement — Combustible Exterior Wall Coverings
03/25/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
03/23/2026
Objection resolved — Addressed
03/20/2026
Permit issued — Mechanical Systems
Q00858246-S4-MS
03/19/2026
Objection raised — Other
03/18/2026
Permit issued — Standpipe
Q00858246-S6-EW-SP
03/18/2026
Permit issued — Standpipe
Q00858246-S6-EW-SD
03/17/2026
Filed — New Building
Drilling and horizontal/vertical piping installation for Geothermal.
Q00858246-P2
03/12/2026
Special inspection requirement — Combustible Exterior Wall Coverings
03/11/2026
Permit issued — General Construction
Q00858246-I1-GC
03/11/2026
Special inspection requirement — Air barrier continuity plan testing
CONNIE PISANI
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
03/11/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
CONNIE PISANI
03/11/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
CONNIE PISANI
03/11/2026
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
03/11/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
03/11/2026
Special inspection requirement — Lowest Floor Elevation
CONNIE PISANI
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP07/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedRNC INDUSTRIES LLC07/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedRNC INDUSTRIES LLC07/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP06/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP05/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP05/15/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP05/04/2026
DOB NOWMechanical SystemsPermit IssuedCONGRESS BUILDERS LLC03/20/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC03/18/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC03/18/2026
DOB NOWGeneral ConstructionPermit IssuedCONGRESS BUILDERS LLC03/11/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC03/09/2026
DOB NOWEarth WorkPermit IssuedCONGRESS BUILDERS LLC03/04/2026
DOB NOWEarth WorkPermit IssuedCONGRESS BUILDERS LLC02/26/2026
DOB NOWPlumbingPermit IssuedPARKVIEW P&H INC02/12/2026
DOB NOWStructuralPermit IssuedCONGRESS BUILDERS LLC02/05/2026
DOB NOWFoundationPermit IssuedCONGRESS BUILDERS LLC01/27/2026
DOB NOWSupport of ExcavationPermit IssuedCONGRESS BUILDERS LLC01/27/2026
DOB NOWFoundationSigned-offCONGRESS BUILDERS LLC01/16/2026
DOB NOWFoundationSigned-offCONGRESS BUILDERS LLC12/17/2025
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/23/2025
1 project · most recent 06/18/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedCONGRESS BUILDERS LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Others
Other
Armstrong Air Design envelope 4300 1 BTU · Pump ×4
Heat / Cool
— TSM12 500 CFM · Wshp ×1
TSM15 600 CFM · Wshp ×1
TSM24 850 CFM · Wshp ×1
TSM36 1,200 CFM · Wshp ×1
Climatemaster TSM09 400 CFM · Wshp ×1
TSM18 700 CFM · Wshp ×1
TSM30 1,000 CFM · Wshp ×1
1 project · most recent 06/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/18/2026Permit IssuedPARKVIEW P&H INCStorm, Water/Sanitary
6 projects · most recent 04/29/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
04/29/2026Permit IssuedAMBER LITE ELECTRIC CORP.1 meters, 1 new_meters
04/29/2026Permit IssuedANTHONY G FERRY INC—
03/24/2026CancelledGLO ELECTRIC LLC—
03/24/2026CancelledGLO ELECTRIC LLC1 meters, 1 new_meters
12/03/2025Permit IssuedGLO ELECTRIC LLCGeneral Wiring, Lighting, HVAC Wiring
11/25/2025Permit IssuedAMBER LITE ELECTRIC CORP.—
1 project · most recent 06/18/2026
Concrete
FiledStatusContractorScope
06/18/2026Permit IssuedCONGRESS BUILDERS LLCConcrete
1 project · most recent 11/20/2025
Fence
FiledStatusContractorScope
11/20/2025Permit Issued4 BROTHERS & SONS FENCEFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Pass-Final House ConnectionPassView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/18/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/25/2026Sprayed fire-resistant materialsCONNIE PISANIspecial
03/25/2026Mastic and Intumescent Fire-resistant CoatingsCONNIE PISANIspecial
03/25/2026Protection of exposed foundation insulationCONNIE PISANIenergy_progress
03/25/2026Fenestration air leakageCONNIE PISANIenergy_progress
03/25/2026Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
03/25/2026Insulation placement and R valuesCONNIE PISANIenergy_progress
03/25/2026Air barrier - visual inspectionCONNIE PISANIenergy_progress
03/25/2026Fenestration areasCONNIE PISANIenergy_progress
03/25/2026Air barrier continuity plan testingCONNIE PISANIenergy_progress
03/25/2026VestibulesCONNIE PISANIenergy_progress
03/25/2026Lowest Floor ElevationCONNIE PISANIprogress
03/25/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
03/25/2026Fire-Resistance Rated ConstructionCONNIE PISANIprogress
03/25/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)CONNIE PISANIspecial
03/25/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
03/25/2026Combustible Exterior Wall Coverings—special
03/25/2026Wall Panels, Curtain Walls, and Veneers—special
03/12/2026Combustible Exterior Wall Coverings—special
03/11/2026Air barrier continuity plan testingCONNIE PISANIenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
03/11/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)CONNIE PISANIspecial
03/11/2026Mastic and Intumescent Fire-resistant CoatingsCONNIE PISANIspecial
03/11/2026Sprayed fire-resistant materialsCONNIE PISANIspecial
03/11/2026Wall Panels, Curtain Walls, and Veneers—special
03/11/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
Latest 25 of 60.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/23/2026Q00858246-P3Request digital key ↗
08/23/2026Q00858246-P2Request digital key ↗
08/23/2026Q00858246-Z1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits9
▸DOB NOWDEP Stormwater Construction Permit5
08/13/2026Q00858246-I1Open ↗
08/13/2026Q00858246-S3Open ↗
08/13/2026Q00858246-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
10/24/2024440816057Open ↗
01/30/2024440816057Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/01/2024440816057Open ↗
10/24/2024440816057Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWRestrictive Declaration/Easement 19
08/23/2026Q00858246-P3Open ↗
08/23/2026Q00858246-S8Open ↗
08/13/2026Q00858246-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWRestrictive Declaration/Easement 27
08/23/2026Q00858246-P3Open ↗
08/23/2026Q00858246-S8Open ↗
08/13/2026Q00858246-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00858246-P2Open ↗
08/13/2026Q00858246-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00858246-I1Open ↗
08/13/2026Q00858246-P2Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/23/2026Q00858246-S1Open ↗
08/23/2026Q00858246-S2Open ↗
08/23/2026Q00858246-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q00858246-S5Open ↗
09/02/2026Q00858246-S5Open ↗
09/01/2026Q00858246-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00858246-S6Open ↗
09/01/2026Q00858246-I1Open ↗
09/01/2026Q00858246-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/26/2024440816057Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/26/2024440816057Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00858246-I1Open ↗
08/13/2026Q00858246-P2Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00858246-I1—
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
11/01/2024440816057Open ↗
01/26/2024440816057Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00858246-I1Open ↗
08/13/2026Q00858246-P2Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/01/2024440816057Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00858246-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/23/2026Q00858246-P3Open ↗
08/13/2026Q00858246-S5Open ↗
08/13/2026Q00858246-S3Open ↗
Showing 3 of 15 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/01/2024440816057Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026Q01307214-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/26/2024440816057Open ↗
▸Other Documents20
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/23/2026Q00858246-P2Open ↗
08/23/2026Q00858246-I1Open ↗
08/15/2026Q00858246-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00858246-P2Open ↗
08/13/2026Q00858246-Z1Open ↗
08/13/2026Q00858246-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00858246-I1Open ↗
08/13/2026Q00858246-P2Open ↗
08/13/2026Q00858246-Z1Open ↗
▸BISSupporting Document: Fee Exempt2
11/01/2024440816057Open ↗
10/24/2024440816057Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00858246-S3Open ↗
08/13/2026Q00858246-Z1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00858246-P2Open ↗
08/23/2026Q00858246-I1Open ↗
▸DOB NOWWaiver Document2
08/23/2026Q00858246-P3Open ↗
08/23/2026Q00858246-S8Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/01/2024440816057Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/24/2024440816057Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1