← Back
Two stories - detached, small or mid-size
3545 EDSON AVENUE
BRONX · BIN 2065664
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R5Zoning
2,264 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,600 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof9p · 1 filing · 13 docs
Bulkhead2p · 1 filing · 13 docs
Floor 231p · 1 filing · 13 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 44p · 1 filing · 13 docs
Floor 34p · 1 filing · 13 docs
Floor 26p · 1 filing · 13 docs
Floor 15p · 1 filing · 13 docs
1 job · most recent 04/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2026——Heating and Air Conditioning Systems
Heat / Cool
Amana PTH123J35 11,600 BTU · Ptac ×11
PTH073J35 7,000 BTU · Ptac ×10
PTH093J35 9,000 BTU · Ptac ×10
PTH153J35 14,400 BTU · Ptac ×8
1 job · most recent 04/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/20/2026——Gas, Storm, Water/Sanitary
1 job · most recent 04/20/2026
Steel
FiledStatusContractorScope
04/20/2026——Steel
1 job · most recent 05/04/2026
Fence
FiledStatusContractorScope
05/04/2026——Fence
Building Lifecycle
All (44)Filed (7)Objection (8)Special Inspection (29)
05/16/2026
Objection raised — Other
05/04/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
X01395621-I1
04/28/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Resolved
04/20/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-S5
04/15/2026
Objection raised — Other
04/15/2026
Special inspection requirement — Post-installed Anchors
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/13/2026
Objection raised — Energy
03/31/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-S3
03/29/2026
Objection raised — Energy
03/29/2026
Objection raised — Admin
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/27/2026
Special inspection requirement — Maintenance information
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-S2
03/24/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-S1
03/23/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-S4
03/23/2026
Special inspection requirement — Structural Steel - Welding
03/23/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/23/2026
Special inspection requirement — Structural Cold-Formed Steel
03/23/2026
Special inspection requirement — Structural Steel - Details
03/18/2026
Special inspection requirement — Sprinkler Systems
03/17/2026
Special inspection requirement — Final
01/29/2026
Objection raised — Admin
01/12/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN-CONJUNCTION TO NB FILING #X01344208-I1
X01344208-I1
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/08/2026
Special inspection requirement — Lighting controls
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
01/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/08/2026
Special inspection requirement — Lighting in dwelling units
01/08/2026
Special inspection requirement — Air barrier — testing
01/08/2026
Special inspection requirement — Fenestration air leakage
01/08/2026
Special inspection requirement — Air barrier - visual inspection
01/08/2026
Special inspection requirement — Maintenance information
01/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/08/2026
Special inspection requirement — Exterior lighting power
01/08/2026
Special inspection requirement — Metering
01/08/2026
Special inspection requirement — Insulation placement and R values
01/08/2026
Special inspection requirement — Interior lighting power
01/08/2026
Special inspection requirement — Fenestration areas
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVAMP NYC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/08/2023$780K—— → —$345/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC405/04/2026
VASILIOS ARTEMIOU PE304/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)103/21/2026
XPDITE GROUP 103103/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/15/2026Post-installed Anchors—special
04/15/2026Fire-Resistant Penetrations and Joints—special
03/27/2026HVAC-R and service water heating system controls—energy_progress
03/27/2026HVAC-R and service water heating equipment—energy_progress
03/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/27/2026Maintenance information—energy_progress
03/27/2026Fire-Resistant Penetrations and Joints—special
03/27/2026HVAC-R and service water piping design and insulation—energy_progress
03/23/2026Structural Steel - Welding—special
03/23/2026Structural Steel - High Strength Bolting—special
03/23/2026Structural Cold-Formed Steel—special
03/23/2026Structural Steel - Details—special
03/18/2026Sprinkler Systems—special
03/17/2026Final—progress
01/08/2026Fire-Resistant Penetrations and Joints—special
01/08/2026Lighting controls—energy_progress
01/08/2026Energy Code Compliance Inspections—progress
01/08/2026Fire-Resistance Rated Construction—progress
01/08/2026Lighting in dwelling units—energy_progress
01/08/2026Air barrier — testing —energy_progress
01/08/2026Fenestration air leakage—energy_progress
01/08/2026Air barrier - visual inspection—energy_progress
01/08/2026Maintenance information—energy_progress
01/08/2026Fenestration and door U-factor and product ratings—energy_progress
01/08/2026Exterior lighting power—energy_progress
Latest 25 of 29.
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026X01344208-S1Request digital key ↗
08/17/2026X01344208-S3Request digital key ↗
08/17/2026X01344208-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01344208-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026X01344208-S3Open ↗
08/17/2026X01344208-S2Open ↗
08/17/2026X01344208-S1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/17/2026X01344208-S1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial2
08/17/2026X01344208-I1Open ↗
08/13/2026X01344208-I1Open ↗