← Back
BRONX
3547 WEBSTER AVENUE
BRONX · BIN 2131294
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 4 docs
Floor 81 filing · 2 docs
Floor 741p · 2 filings · 20 docs
Floor 637p · 2 filings · 20 docs
Floor 5Under Construction36p · 3 filings · 20 docs
Floor 435p · 2 filings · 20 docs
Floor 335p · 2 filings · 20 docs
Floor 236p · 2 filings · 20 docs
Floor 138p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GENARO URUETA INC.507/02/2026
VASILIOS ARTEMIOU PE611/25/2025
PAUL PERDEK, PROF. ENG. PLLC812/18/2024
R & O ENGINEERING611/01/2024
H & O ENGINEERING, DPC507/10/2024
STUDIO GALLOS203/13/2024
MJE PROFESSIONAL SERVICES212/18/2023
CHOSEN MEP, CORP.107/13/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941507/02/2026
LEO Y LEE ASSOCIATES2481107/22/2024
H & O ENGINEERING, DPC5595307/10/2024
MJE CONSULTING ENGINEERIN8522110/27/2023
HRF SERVICES CORP5616206/08/2022
Building Lifecycle
All (183)Filed (35)Permit Issued (26)Signed Off (13)Violation (2)Inspection (17)Objection (60)Special Inspection (30)
07/06/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Paul Raymond
07/06/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
07/06/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
07/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
07/06/2026
Special inspection requirement — Masonry
Paul Raymond
07/06/2026
Special inspection requirement — Interior lighting power
Paul Raymond
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
07/06/2026
Special inspection requirement — Maintenance information
Paul Raymond
07/06/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
07/06/2026
Special inspection requirement — Metering
Paul Raymond
07/06/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
07/06/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
07/06/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
07/06/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
07/06/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
07/06/2026
Special inspection requirement — Fenestration areas
Paul Raymond
07/06/2026
Special inspection requirement — Lighting controls
Paul Raymond
07/06/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
07/02/2026
Filed — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-A1
05/20/2026
Filed — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-P9
02/06/2026
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S7
01/29/2026
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S8
01/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/31/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/30/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/29/2025
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S5
12/29/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
12/23/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
12/23/2025
Special inspection requirement — Maintenance information
Paul Raymond
12/23/2025
Special inspection requirement — Post-installed Anchors
Paul Raymond
12/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
12/23/2025
Special inspection requirement — Mechanical Systems
Paul Raymond
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/22/2025
Permit issued — Standpipe
X00709422-S8-EW-SD
12/22/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Other
11/25/2025
Filed — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-P6
11/25/2025
Filed — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-P5
11/25/2025
Filed — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-P7
11/18/2025
Signed off — Alteration
APPLICATION FILED FOR THE INSTALLATION OF A SINGLE FOOTING ELEMENT AS PER DRAWINGS. ALL WORK IN CONJUNCTION WITH THE NEW BUILDING UNDER JOB NUMBER X00709422-I1
X00741702-I1
11/18/2025
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S3
11/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Permit issued — Mechanical Systems
X00709422-S5-MS
10/27/2025
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S1
10/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2025
Signed off — New Building
Proposed eight (8) story mixed used development. This NB has been accepted in the HUB per consultation on February 1st with Mr. Rami Bitar. Filing for the 421a deadline.
X00709422-S6
10/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/03/2025
Permit issued — Curb Cut
X00709422-S6-CC
10/03/2025
Objection resolved — Addressed
08/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offA M B MECHANICAL INC12/22/2025
DOB NOWMechanical SystemsSigned-offB CONTRACTORS GROUP LLC10/29/2025
DOB NOWCurb CutSigned-offB CONTRACTORS GROUP LLC10/03/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC05/19/2025
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC05/19/2025
DOB NOWStandpipeSigned-offPRIME PIPING & HEATING IN01/09/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/02/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC12/13/2024
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC12/11/2024
DOB NOWStructuralSigned-offB CONTRACTORS GROUP LLC12/11/2024
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA08/08/2024
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA08/08/2024
DOB NOWFoundationSigned-offB CONTRACTORS GROUP LLC07/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC07/25/2024
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC06/18/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC06/11/2024
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC06/11/2024
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA12/19/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/20/2023
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA11/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offN TECH DESIGN OF AMERICA11/01/2023
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA10/26/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2023
DOB NOWFoundationSigned-offR & S CONTRACTING NY INC06/10/2022
DOB NOWConstruction FenceSigned-offR & S CONTRACTING NY INC05/31/2022
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST03/09/2022
1 project · most recent 07/02/2026
Sprinkler System
FiledStatusContractorScope
07/02/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 07/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/02/2026Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
5 projects · most recent 11/27/2025
General Wiring
FiledStatusContractorScope
11/27/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
12/18/2024CompleteDENALI ELECTRIC CORP—
07/10/2024Permit IssuedSOLAS ELECTRICAL CORP—
01/11/2024CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
03/06/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 07/02/2026
Concrete
FiledStatusContractorScope
07/02/2026Signed-offA M B MECHANICAL INCConcrete
2 projects · most recent 07/02/2026
Fence Sidewalk Shed
FiledStatusContractorScope
07/02/2026Signed-offA M B MECHANICAL INCFence
12/18/2024Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
01/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/30/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/29/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/22/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
07/06/2026Maintenance informationPaul Raymondenergy_progress
07/06/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
07/06/2026MasonryPaul Raymondspecial
07/06/2026Wall Panels, Curtain Walls, and VeneersPaul Raymondspecial
07/06/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/06/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
07/06/2026Energy Code Compliance InspectionsPaul Raymondprogress
07/06/2026Fenestration air leakagePaul Raymondenergy_progress
07/06/2026Exterior lighting powerPaul Raymondenergy_progress
07/06/2026MeteringPaul Raymondenergy_progress
07/06/2026Lighting in dwelling unitsPaul Raymondenergy_progress
07/06/2026Air barrier continuity plan testingPaul Raymondenergy_progress
07/06/2026Air barrier - visual inspectionPaul Raymondenergy_progress
07/06/2026Insulation placement and R valuesPaul Raymondenergy_progress
07/06/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
07/06/2026Fenestration areasPaul Raymondenergy_progress
07/06/2026Lighting controlsPaul Raymondenergy_progress
07/06/2026Electrical motors and elevatorsPaul Raymondenergy_progress
07/06/2026Air barrier — testing Paul Raymondenergy_progress
07/06/2026Interior lighting powerPaul Raymondenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
12/23/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
12/23/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
12/23/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
12/23/2025Shutoff dampersPaul Raymondenergy_progress
Latest 25 of 87.
▾Documents — 258 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/24/2026X00693238-P2Request digital key ↗
08/24/2026X00693238-I1Request digital key ↗
08/24/2026X00693238-P1Request digital key ↗
Showing 3 of 38 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-A1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/16/2026X00709422-P4Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X00709422-I1Open ↗
▸Seals & Professional Certifications138
▸DOB NOWProgress Inspector Seal & Signature59
09/25/2026X00709422-S1Open ↗
09/25/2026X00709422-S1Open ↗
09/02/2026X00709422-S7Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/25/2026X00709422-S1Open ↗
09/25/2026X00709422-S1Open ↗
09/25/2026X00709422-S1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/24/2026X00693238-I1Open ↗
08/24/2026X00693238-P1Open ↗
08/24/2026X00741702-I1Open ↗
Showing 3 of 34 on file for this type
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/16/2026X00709422-I1Open ↗
08/16/2026X00709422-P4Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/16/2026X00709422-I1Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/16/2026X00709422-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026X00709422-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWOER: Notice to Proceed13
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-A1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/16/2026X00709422-S5Open ↗
08/16/2026X00709422-S3Open ↗
08/16/2026X00709422-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026X00914078-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/16/2026X00709422-S5Open ↗
08/16/2026X00709422-S7Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/16/2026X00709422-I1Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification8
08/16/2026X00709422-I1Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/16/2026X00709422-I1Open ↗
08/16/2026X00709422-P4Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/16/2026X00709422-I1Open ↗
08/16/2026X00709422-P9Open ↗
08/16/2026X00709422-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/16/2026X00709422-S1Open ↗