Two family converted from one family
355 1 STREET
BROOKLYN · BIN 3020646
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
2,700 sfGross Floor Area
2Units
Two family converted from one family · 1,875 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof3p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar3p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2022$4.0M—Private party → Private party$1,480/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC209/27/2024
NEW AGE ENGINEERING PLLC508/28/2023
JULIE MEE SCHMIDT ARCHITECTURE PLLC206/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AZAR ASSOCIATES203/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARK DESIGN & BUILD INCGeneral Contractor303/21/2026
KAMTECH RESTORATION CORPGeneral Contractor203/21/2026
HP SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802209/27/2024
NEW AGE ENGINEERING PLLC7746508/28/2023
CHANG PARK ARCH. P.C.663206/29/2023
Building Lifecycle
All (50)Filed (9)Permit Issued (4)Signed Off (4)Inspection (4)Objection (8)Special Inspection (21)
12/17/2024
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01082830-I1
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
10/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
10/15/2024
Special inspection requirement — Final
Kaijin Liang
10/15/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
09/27/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01082830-P1
09/18/2024
Permit issued — Solar
B01082830-I1-SL
09/05/2024
Objection resolved — Addressed
08/06/2024
Objection raised — Scope
07/18/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01082830-I1
09/07/2023
Signed off — Alteration
INSTALL REPLACEMENT WATER HEATER AND ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT LINES ARE PER PLANS. CAP AND REMOVAL OF GAS PIPING AND GAS-FIRED APPLIANCES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00812787-I1
08/28/2023
Filed — Alteration
INSTALL REPLACEMENT WATER HEATER AND ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT LINES ARE PER PLANS. CAP AND REMOVAL OF GAS PIPING AND GAS-FIRED APPLIANCES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00812787-P2
08/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2023
Signed off — Alteration
INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00812794-I1
08/21/2023
Special inspection requirement — Maintenance information
Stephen Shishko
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
08/21/2023
Special inspection requirement — Final
Stephen Shishko
08/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
08/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
08/21/2023
Special inspection requirement — Mechanical Systems
Stephen Shishko
08/17/2023
Filed — Alteration
INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00812794-P1
07/25/2023
Signed off — Alteration
MINOR NON STRUCTURAL PARTITION REMOVAL, NEW FIISH FLOORING, NEW PARTITIONS, DROPPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00815061-I1
06/30/2023
Special inspection requirement — Lighting in dwelling units
Chang Park
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
06/30/2023
Special inspection requirement — Final
Chang Park
06/30/2023
Special inspection requirement — Lighting controls
Chang Park
06/30/2023
Special inspection requirement — Interior lighting power
Chang Park
06/29/2023
Filed — Alteration
MINOR NON STRUCTURAL PARTITION REMOVAL, NEW FIISH FLOORING, NEW PARTITIONS, DROPPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00815061-P1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
06/29/2023
Special inspection requirement — Final
Chang Park
06/29/2023
Special inspection requirement — Lighting in dwelling units
Chang Park
06/29/2023
Special inspection requirement — Interior lighting power
Chang Park
06/29/2023
Special inspection requirement — Lighting controls
Chang Park
05/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2023
Filed — Alteration
INSTALL REPLACEMENT WATER HEATER AND ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT LINES ARE PER PLANS. CAP AND REMOVAL OF GAS PIPING AND GAS-FIRED APPLIANCES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00812787-P1
02/10/2023
Permit issued — Plumbing
B00812787-I1-PL
02/09/2023
Permit issued — General Construction
B00815061-I1-GC
02/07/2023
Permit issued — Mechanical Systems
B00812794-I1-MS
01/24/2023
Objection raised — Other
01/24/2023
Objection resolved — Addressed
01/24/2023
Objection raised — Other
01/24/2023
Objection resolved — Addressed
01/24/2023
Objection raised — Other
01/24/2023
Objection resolved — Addressed
01/20/2023
Filed — Alteration
INSTALL REPLACEMENT WATER HEATER AND ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT LINES ARE PER PLANS. CAP AND REMOVAL OF GAS PIPING AND GAS-FIRED APPLIANCES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00812787-I1
01/20/2023
Filed — Alteration
INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00812794-I1
01/20/2023
Filed — Alteration
MINOR NON STRUCTURAL PARTITION REMOVAL, NEW FIISH FLOORING, NEW PARTITIONS, DROPPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00815061-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP09/18/2024
DOB NOWPlumbingSigned-offHP SERVICES INC02/10/2023
DOB NOWGeneral ConstructionSigned-offARK DESIGN & BUILD INC02/09/2023
DOB NOWMechanical SystemsSigned-offARK DESIGN & BUILD INC02/07/2023
BISOTISSUEDBURDA CONSTRUCTION CORP09/28/2005
1 project · most recent 09/09/2024
FiledStatusContractorScope
09/09/2024CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
10/15/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
10/15/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
10/15/2024Energy Code Compliance InspectionsKaijin Liangprogress
10/15/2024FinalKaijin Liangprogress
10/15/2024Air barrier - visual inspectionKaijin Liangenergy_progress
08/21/2023Maintenance informationStephen Shishkoenergy_progress
08/21/2023Fire-Resistant Penetrations and JointsStephen Shishkospecial
08/21/2023FinalStephen Shishkoprogress
08/21/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
08/21/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
08/21/2023Mechanical SystemsStephen Shishkospecial
06/30/2023Lighting in dwelling unitsChang Parkenergy_progress
06/30/2023Fire-Resistant Penetrations and JointsChang Parkspecial
06/30/2023FinalChang Parkprogress
06/30/2023Lighting controlsChang Parkenergy_progress
06/30/2023Interior lighting powerChang Parkenergy_progress
06/29/2023Fire-Resistant Penetrations and JointsChang Parkspecial
06/29/2023FinalChang Parkprogress
06/29/2023Lighting in dwelling unitsChang Parkenergy_progress
06/29/2023Interior lighting powerChang Parkenergy_progress
06/29/2023Lighting controlsChang Parkenergy_progress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B00812794-I1Request digital key ↗
08/27/2026B00812794-P1Request digital key ↗
08/27/2026B00812787-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B01082830-I1Open ↗
09/01/2026B01082830-I1Open ↗
09/01/2026B01082830-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00812794-I1Open ↗
08/27/2026B00812794-P1Open ↗
08/27/2026B00812787-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01082830-I1Open ↗
09/01/2026B01082830-I1Open ↗
08/28/2026B00815061-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00812794-I1Open ↗
08/27/2026B00812794-P1Open ↗
08/27/2026B00812787-P2Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01082830-I1Open ↗