RoofUnder Construction81p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 4 drawing sheets
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 10 docs
Civil
Pl: Civil plumbing for sanitary and storm drainage and backflow preventer and internal water main piping. All main plumbing work is covered under NB Job# 210182069 and Plumbing application # X00432072-I1.
On file for this project
10 documents · 1 drawing sheet
Floor 40Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 39Under Construction75p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 38Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 37Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 36Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 35Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 34Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 33Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 32Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 31Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 30Under Construction71p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 29Under Construction74p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
INSTALLATION OF EMERGENCY GAS GENERATOR IN CONJUNCTION WITH NEW BUILDING APPLICATION 210182069. ALL GAS WORK COVERED UNDER NB PLUMBING APPLICATION X00432072
On file for this project
4 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 28Under Construction76p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
INSTALLATION OF EMERGENCY GAS GENERATOR IN CONJUNCTION WITH NEW BUILDING APPLICATION 210182069. ALL GAS WORK COVERED UNDER NB PLUMBING APPLICATION X00432072
On file for this project
4 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 27Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 26Under Construction76p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 2 drawing sheets
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 25Under Construction74p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 24Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 23Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 22Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 21Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 20Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 19Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 18Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 17Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 16Under Construction76p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 15Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 14Under Construction78p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 2 drawing sheets
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 13Under Construction72p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 12Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 11Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 10Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 9Under Construction73p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 8Under Construction75p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 7Under Construction75p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 6Under Construction74p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 5Under Construction75p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 7 filings on this floor.
Floor 4Under Construction76p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 2 drawing sheets
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction79p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 3 drawing sheets
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2Under Construction74p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 1Under Construction76p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
Boiler filing as per plans filed
On file for this project
3 documents
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarUnder Construction76p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW BUILDING PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION 210182069
On file for this project
9 documents · 1 drawing sheet
NEW INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEMS FOR NEW BUILDING APPLICATION 210182069
On file for this project
10 documents · 1 drawing sheet
PROVIDE NEW TEMPORARY DRY STANDPIPE SYSTEM FOR NEW BUILDING JOB# 210182069
On file for this project
2 documents
Latest 3 of 6 filings on this floor.