DOB07/25/2026REQUESTING AN ENGINEER'S REPORT DUE TO CHARRED JOISTS, SECTIONS OF ROOF OPEN, FIRE AND WATER DAMAGES THROUGHOUT BUILDING IN ALL FLOORS. AN ENGINEER'S REPORT IS REQUIRED TO ASSESS ALL WOOD JOISTS INCLUDING CHARRED WOOD JOISTS AND STABILITY OF BUILDING IN ALL FLOORS DUE TO FIRE DAMAGES.
DOB07/25/2026STRUCTURE RENDERED NON-COMPLIANT. 3-STORY BUILDING SUSTAINED DAMAGES DUE TO FIRE. OBSERVED CHARRED JOISTS, DAMAGED WALLS/CEILINGS, WATER DAMAGE THROUGHOUT BUILDING, BROKEN WINDOWS THROUGHOUT. ALSO OBSERVED SECTIONS OF ROOF OPEN ROOF LEAVING PROPERTY EXPOSED TO ALL ELEMENTS.
HPD02/15/2023§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD02/15/2023§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Three families · 1,800 sf lot · 1.68 FAR built · Flood zone X