Two family frame
355 LELAND AVENUE
BRONX · BIN 2020396
💬 Discuss this project
1925Year Built
1.5Stories
B2Building Class
R3AZoning
1,570 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2018$402K—Private party → Private party$256/sf building
01/15/2015$289K—— → —$184/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN TRANS ENGINEERING, LLC309/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROBERT STAR PLBG AND HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292309/08/2020
Building Lifecycle
All (23)Filed (3)Permit Issued (1)Signed Off (1)Special Inspection (18)
01/13/2021
Signed off — Alteration
FILING ALT 2 FOR THE INSTALLATION OF ONE GAS METER AND THE INSTALLATION OF ONE WALL MOUNTED DUAL UNIT ( BOILER./ HW COIL). AS PER PLANS SUBMITTED HEREWITH THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEAN OF EGRESS UNDER THIS APPLICATION.
X00214731-I1
09/08/2020
Filed — Alteration
FILING ALT 2 FOR THE INSTALLATION OF ONE GAS METER AND THE INSTALLATION OF ONE WALL MOUNTED DUAL UNIT ( BOILER./ HW COIL). AS PER PLANS SUBMITTED HEREWITH THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEAN OF EGRESS UNDER THIS APPLICATION.
X00214731-P3
09/08/2020
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
09/08/2020
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
09/08/2020
Special inspection requirement — Maintenance information
Jose Santos
09/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
09/08/2020
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
09/08/2020
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
09/02/2020
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
09/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
09/02/2020
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
09/02/2020
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
09/02/2020
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
09/02/2020
Special inspection requirement — Maintenance information
Jose Santos
07/13/2020
Filed — Alteration
FILING ALT 2 FOR THE INSTALLATION OF ONE GAS METER AND THE INSTALLATION OF ONE WALL MOUNTED DUAL UNIT ( BOILER./ HW COIL). AS PER PLANS SUBMITTED HEREWITH THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEAN OF EGRESS UNDER THIS APPLICATION.
X00214731-P2
06/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
06/15/2020
Special inspection requirement — Maintenance information
Jose Santos
06/15/2020
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
06/15/2020
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
06/15/2020
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
06/15/2020
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
09/12/2019
Permit issued — Plumbing
X00214731-I1-PL
08/26/2019
Filed — Alteration
FILING ALT 2 FOR THE INSTALLATION OF ONE GAS METER AND THE INSTALLATION OF ONE WALL MOUNTED DUAL UNIT ( BOILER./ HW COIL). AS PER PLANS SUBMITTED HEREWITH THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEAN OF EGRESS UNDER THIS APPLICATION.
X00214731-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROBERT STAR PLBG AND HTG09/12/2019
1 project · most recent 02/18/2019
General Wiring
FiledStatusContractorScope
02/18/2019CompleteECO ELECTRICAL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/08/2020HVAC and service water heating equipment Jose Santosenergy_progress
09/08/2020HVAC and service water heating system controls Jose Santosenergy_progress
09/08/2020Maintenance informationJose Santosenergy_progress
09/08/2020Fire-Resistant Penetrations and JointsJose Santosspecial
09/08/2020Fire-Resistance Rated ConstructionJose Santosprogress
09/08/2020Energy Code Compliance InspectionsJose Santosprogress
09/02/2020HVAC and service water heating equipment Jose Santosenergy_progress
09/02/2020Fire-Resistant Penetrations and JointsJose Santosspecial
09/02/2020Energy Code Compliance InspectionsJose Santosprogress
09/02/2020Fire-Resistance Rated ConstructionJose Santosprogress
09/02/2020HVAC and service water heating system controls Jose Santosenergy_progress
09/02/2020Maintenance informationJose Santosenergy_progress
06/15/2020Fire-Resistant Penetrations and JointsJose Santosspecial
06/15/2020Maintenance informationJose Santosenergy_progress
06/15/2020HVAC and service water heating equipment Jose Santosenergy_progress
06/15/2020HVAC and service water heating system controls Jose Santosenergy_progress
06/15/2020Fire-Resistance Rated ConstructionJose Santosprogress
06/15/2020Energy Code Compliance InspectionsJose Santosprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00214731-I1Request digital key ↗
08/15/2026X00214731-P3Request digital key ↗
08/15/2026X00214731-P2Request digital key ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature15
08/29/2026X00214731-P3Open ↗
08/29/2026X00214731-P3Open ↗
08/29/2026X00214731-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00214731-P2Open ↗
08/26/2026X00214731-I1Open ↗
08/26/2026X00214731-P3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026X00214731-P3Open ↗
08/28/2026X00214731-P2Open ↗
08/23/2026X00214731-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026X00214731-P3Open ↗
08/26/2026X00214731-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00214731-I1Open ↗