Elevator apt, semi-fireproof without stores
355 SHEPHERD AVENUE
BROOKLYN · BIN 3429466
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R6AZoning
81,341 sfGross Floor Area
126Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SHEPHERD GLENMORE HOUSING DEVELOPMENT FU ND CORPORA · 18,500 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof1p · 1 filing · 2 docs
Floor 2161p · 1 filing · 20 docs
Floor 1184p · 1 filing · 20 docs
Cellar175p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY607/08/2026
SHEPHERD GLENMORE HDFC2007/08/2026
STEEL CONSTRUCTION607/08/2026
SHEPHERD GLENMORE HOUSING DEVELOPMENT FU ND CORPORA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1903/21/2026
SUNKEEPER SOLAR ELECTRIC LLC403/21/2026
BMB BUILDING CONSULTING403/21/2026
PATUXENT ENGINEERING203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN REALTORS LLCGeneral Contractor3007/08/2026
PRIME PIPING & HEATING INPlumbing607/08/2026
VAYA RESTORATION INCGeneral Contractor507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
PRIME PIPING & HEATING INFire Protection407/08/2026
ANGAD CONSTRUCTION CORPGeneral Contractor303/21/2026
SUNKEEPER SOLAR ELECTRICGeneral Contractor204/09/2026
STEEL CONSTRUCTION LLCGeneral Contractor107/08/2026
DIFALZO ELECTRIC NY, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES J STOUT ARCHITECTS5913202/20/2026
METRIC CONSULTING AND INS18031909/19/2025
Building Lifecycle
All (202)Filed (27)Permit Issued (32)Signed Off (13)Violation (32)Inspection (12)Objection (56)Special Inspection (30)
03/02/2026
Signed off — Alteration
B01011999-I1
02/20/2026
Filed — Alteration
B01011999-P1
02/20/2026
Special inspection requirement — Final
JAMES J STOUT
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
02/20/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
02/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
02/13/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
02/13/2026
Special inspection requirement — Final
JAMES J STOUT
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
02/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
11/07/2025
Permit issued — Solar
B01011999-I1-SL
10/17/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Metering
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Air barrier — testing
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
10/17/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
10/03/2025
Objection raised — Other
10/03/2025
Objection resolved — Addressed
10/02/2025
Signed off — New Building
Plumbing work for NB
B00594970-S3
10/02/2025
Signed off — New Building
Plumbing work for NB
B00594970-S4
09/22/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00904646-I1
09/19/2025
Filed — New Building
Plumbing work for NB
B00594970-A9
09/19/2025
Permit issued — Sidewalk Shed
B00904646-I1-SH
09/15/2025
Signed off — Alteration
INSTALLATION OF MULTI-POINT & 2 POINT SUSPENEDED SCAFFOLD DURING NEW BUILDING CONSTRUCTION. HORIZONTAL NETTING SHALL COMPLY WITH NYCC 2022 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00863355-I1
09/15/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
09/12/2025
Signed off — Alteration
B00850783-I1
08/28/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00908660-I1
07/31/2025
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE FOR NEWBUILDING NB # B00594970.
B00808882-I1
06/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2025
Signed off — New Building
Plumbing work for NB
B00594970-S8
04/24/2025
Signed off — New Building
Plumbing work for NB
B00594970-S5
03/27/2025
Filed — New Building
Plumbing work for NB
B00594970-A6
03/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/13/2025
Filed — New Building
Plumbing work for NB
B00594970-A5
02/26/2025
Permit issued — Plumbing
B00594970-S4-PL
02/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/22/2025
Filed — New Building
Plumbing work for NB
B00594970-A3
01/08/2025
Permit issued — Boiler Equipment
B00594970-S8-BE
12/26/2024
Permit issued — General Construction
B00594970-I1-GC
12/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/20/2024
Objection resolved — Addressed
Latest 60 of 202 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNKEEPER SOLAR ELECTRIC11/07/2025
DOB NOWSidewalk ShedSigned-offANGAD CONSTRUCTION CORP09/19/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/26/2025
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN01/08/2025
DOB NOWGeneral ConstructionPermit IssuedGREEN REALTORS LLC12/26/2024
DOB NOWSolarSigned-offSUNKEEPER SOLAR ELECTRIC12/02/2024
DOB NOWConstruction FenceSigned-offGREEN REALTORS LLC11/22/2024
DOB NOWFoundationSigned-offGREEN REALTORS LLC10/25/2024
DOB NOWStructuralSigned-offGREEN REALTORS LLC10/24/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC07/11/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/11/2024
DOB NOWMechanical SystemsSigned-offGREEN REALTORS LLC07/02/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/01/2024
DOB NOWGeneral ConstructionSigned-offVAYA RESTORATION INC04/30/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/13/2024
DOB NOWGeneral ConstructionPermit IssuedGREEN REALTORS LLC12/11/2023
DOB NOWConstruction FenceSigned-offGREEN REALTORS LLC12/07/2023
DOB NOWFoundationSigned-offGREEN REALTORS LLC11/22/2023
DOB NOWStructuralSigned-offGREEN REALTORS LLC11/22/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC07/31/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/26/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/03/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC07/03/2023
DOB NOWMechanical SystemsSigned-offGREEN REALTORS LLC06/30/2023
DOB NOWGeneral ConstructionSigned-offVAYA RESTORATION INC04/27/2023
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC03/28/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/26/2023
DOB NOWConstruction FenceSigned-offGREEN REALTORS LLC01/19/2023
DOB NOWSupport of ExcavationSigned-offGREEN REALTORS LLC01/18/2023
DOB NOWGeneral ConstructionPermit IssuedGREEN REALTORS LLC01/17/2023
DOB NOWFoundationSigned-offGREEN REALTORS LLC12/21/2022
DOB NOWStructuralSigned-offGREEN REALTORS LLC12/21/2022
1 project · most recent 09/19/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2025Permit IssuedGREEN REALTORS LLCAir Conditioning Systems, Ventilation Systems
Cooling
Islandaire 8RSNU07 8,100 BTU · Ptac ×178
8RSNU09 9,700 BTU · Ptac ×100
8RSNU13 12,800 BTU · Ptac ×56
8RSNU15 14,400 BTU · Ptac ×20
Lg ARUM048GSS5 48,000 BTU · Vrf Outdoor ×2
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×2
ARUM216BTE5 216,000 BTU · Vrf Outdoor ×2
LS180HSV4 18,200 BTU · Condensing Unit ×1
Ventilation
Captiveaire CASRTU3-I.500-20-20T-DOAS 4,200 CFM · Makeup Air ×2
Lg ARVU063ZEA2 600 CFM · Vrf Outdoor ×2
1 project · most recent 09/19/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/19/2025Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
6 projects · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
10/01/2025CompleteDENNISON ELECTRIC CORPGeneral Wiring
03/07/2024CompleteSUNKEEPER SOLAR LLC—
08/11/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
07/28/2023CompleteRICHARD NEU—
05/03/2023CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
1 project · most recent 09/19/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/19/2025Signed-offA M B MECHANICAL INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/30/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/18/2023Pass-Final House ConnectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
02/20/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
02/20/2026FinalJAMES J STOUTprogress
02/20/2026Air barrier - visual inspectionJAMES J STOUTenergy_progress
02/20/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
02/20/2026Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
02/13/2026Air barrier - visual inspectionJAMES J STOUTenergy_progress
02/13/2026FinalJAMES J STOUTprogress
02/13/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
02/13/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
02/13/2026Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
10/17/2025Sprayed fire-resistant materialsSAMI HAJJAR P.Especial
10/17/2025Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
10/17/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/17/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
10/17/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
10/17/2025Fenestration areasSAMI HAJJAR P.Eenergy_progress
10/17/2025MeteringSAMI HAJJAR P.Eenergy_progress
10/17/2025Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
10/17/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
10/17/2025Air barrier — testing SAMI HAJJAR P.Eenergy_progress
10/17/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
10/17/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
10/17/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
10/17/2025VestibulesSAMI HAJJAR P.Eenergy_progress
10/17/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 136.
▾Documents — 254 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/31/2026B00594970-A3Request digital key ↗
08/31/2026B00594970-A2Request digital key ↗
08/31/2026B00594970-S8Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION4
01/05/2026322158437Open ↗
07/28/2023322158437Open ↗
07/25/2023322158437Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
01/20/2026322158437Open ↗
11/08/2023322158437Open ↗
08/16/2022322158437Open ↗
▸DOB NOWHPD - Permit Notice2
08/13/2026B00594970-A9Open ↗
08/13/2026B00594970-I1Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00594970-A9Open ↗
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00594970-A9Open ↗
08/13/2026B00594970-P3Open ↗
08/13/2026B00594970-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00594970-A9Open ↗
08/13/2026B00594970-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00594970-I1Open ↗
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature52
09/02/2026B01011999-P1Open ↗
09/02/2026B01011999-P1Open ↗
09/02/2026B00594970-A6Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/31/2026B00594970-P7Open ↗
08/31/2026B00594970-P4Open ↗
08/31/2026B00594970-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026B01011999-P1Open ↗
09/02/2026B01011999-P1Open ↗
09/02/2026B00594970-A6Open ↗
Showing 3 of 19 on file for this type
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-P4Open ↗
08/13/2026B00594970-P7Open ↗
Showing 3 of 6 on file for this type
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
11/08/2023322158437Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist6
08/31/2026B00594970-P4Open ↗
08/31/2026B00594970-P3Open ↗
08/15/2026B00594970-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
07/25/2023322158437Open ↗
08/16/2022322158437Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/08/2023322158437Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/08/2023322158437Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/15/2026B00594970-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B00594970-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWOER: Notice to Proceed13
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-S3Open ↗
08/13/2026B00594970-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-S3Open ↗
08/13/2026B00594970-S2Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/19/2025322158437Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
11/08/2023322158437Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00594970-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00594970-S1Open ↗
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00594970-S1Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/31/2026B00594970-A2Open ↗
08/31/2026B00594970-P4Open ↗
08/31/2026B00594970-S3Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/16/2022322158437Open ↗
08/16/2022322158437Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/20/2026322158437Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01011999-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISINSURANCE: LIABILITY1
01/16/2026322158437Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
01/16/2026322158437Open ↗
▸BISINSURANCE: DISABILITY1
01/16/2026322158437Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
01/20/2026322158437Open ↗
01/20/2026322158437Open ↗
11/08/2023322158437Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
07/19/2022322158437Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/16/2022322158437Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/13/2026B00594970-P4Open ↗
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00594970-I1Open ↗
08/13/2026B00594970-P2Open ↗
08/13/2026B00594970-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/31/2026B00594970-P4Open ↗
08/31/2026B00594970-P3Open ↗
08/15/2026B00594970-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
08/16/2022322158437Open ↗
▸DOB NOWHPD - Completion Notice1
08/15/2026B00594970-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/15/2026B00594970-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00594970-S6Open ↗