355 WEST 120 STREET
MANHATTAN · Harlem (South) · BIN 1059131
💬 Discuss this project
1901Year Built
3Stories
A5Building Class
R7BZoning
3,940 sfGross Floor Area
1Units
Rent Stabilized21 Open Violations ▸
One family attached or semi-detached · 1,816 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof9p · 2 filings · 20 docs
Floor 311p · 3 filings · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar11p · 3 filings · 20 docs
Basement6p · 1 filing · 20 docs
Sub-Basement5p · 3 filings · 20 docs
Site & exterior6p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAVID TURNER ARCHITECT P C2409/13/2026
M M CONSTRUCTION BUILDE807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/22/2017$2.6M—Private party → Private party$666/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID TURNER608/12/2026
NY BUILDING ASSOCIATES INC203/10/2026
HUGH CHRYSLER ENGINEERING CO LLC210/02/2024
BANGASH ASSOCIATES INC.205/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS203/21/2026
SHEIKH EXPEDITING403/21/2026
HUGH CHRYSLER ENGINEERING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHRISTIAN G'NRL CONST CORGeneral Contractor603/21/2026
M.M CONSTRUCTION & BUILDERSGeneral Contractor307/08/2026
QUINTUNA SERVICE CORPGeneral Contractor303/21/2026
OASIS PLOMO CORPGeneral Contractor104/09/2026
RICHAIR MECHANICAL INCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
BAYSIDE ELEC'L CONT. CORPElectrical103/22/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID TURNER ARCHITECT PC3829608/12/2026
NKM ENGINEERING PLLC6244203/10/2026
HUGH CHRYSLER ENGINEERING4251210/02/2024
BANGASH ASSOCIATES INC8488105/20/2024
Building Lifecycle
All (112)Filed (12)Permit Issued (11)Signed Off (5)Violation (44)Inspection (10)Special Inspection (30)
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID TURNER
08/17/2026
Special inspection requirement — Mechanical Systems
DAVID TURNER
08/17/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
08/17/2026
Special inspection requirement — Ventilation and air distribution system
DAVID TURNER
08/17/2026
Special inspection requirement — Lighting controls
DAVID TURNER
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
DAVID TURNER
08/17/2026
Special inspection requirement — Exterior lighting power
DAVID TURNER
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
DAVID TURNER
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID TURNER
08/17/2026
Special inspection requirement — Interior lighting power
DAVID TURNER
08/17/2026
Special inspection requirement — Lighting in dwelling units
DAVID TURNER
08/12/2026
Filed — Alteration CO
Conversion of Class B building into a 2 family, New HVAC systems. PAA filed to show minor layout changes
M00778920-P4
08/12/2026
Special inspection requirement — Ventilation and air distribution system
DAVID TURNER
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID TURNER
08/12/2026
Special inspection requirement — Mechanical Systems
DAVID TURNER
08/12/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
08/12/2026
Special inspection requirement — Exterior lighting power
DAVID TURNER
08/12/2026
Special inspection requirement — Interior lighting power
DAVID TURNER
08/12/2026
Special inspection requirement — Lighting in dwelling units
DAVID TURNER
08/12/2026
Special inspection requirement — Lighting controls
DAVID TURNER
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
DAVID TURNER
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DAVID TURNER
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
DAVID TURNER
03/13/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01322258-I1
03/11/2026
Special inspection requirement — Final
NARESH MAHANGU
03/11/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/10/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01322258-P1
02/26/2026
Filed — Alteration CO
Conversion of Class B building into a 2 family, New HVAC systems. PAA filed to show minor layout changes
M00778920-P3
12/04/2025
Permit issued — Solar
M01322258-I1-SL
11/26/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01322258-I1
06/04/2025
Violation issued (HPD, closed)
A
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Filed — Alteration CO
Conversion of Class B building into a 2 family, New HVAC systems. PAA filed to show minor layout changes
M00778920-P2
04/10/2025
Special inspection requirement — Exterior lighting power
DAVID TURNER
04/10/2025
Special inspection requirement — Ventilation and air distribution system
DAVID TURNER
04/10/2025
Special inspection requirement — Lighting controls
DAVID TURNER
02/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/29/2024
Signed off — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01053551-I1
12/11/2024
Signed off — Alteration
PROPOSED 3" COMBINED WATER SERVICE AS PER PLANS FOR A 2-FAMILY HOUSE FILED UNDER DOB# M00778920-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
M00902073-I1
12/04/2024
Signed off — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BROWN STONE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01053550-I1
11/27/2024
Filed — Alteration CO
Conversion of Class B building into a 2 family, New HVAC systems. PAA filed to show minor layout changes
M00778920-P1
11/22/2024
Violation issued (HPD, closed)
I
11/19/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/02/2024
Filed — Alteration
PROPOSED 3" COMBINED WATER SERVICE AS PER PLANS FOR A 2-FAMILY HOUSE FILED UNDER DOB# M00778920-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
M00902073-P1
09/25/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/20/2024
Signed off — Alteration
Plumbing work for OT/MH application M00778920
M00793344-I1
05/28/2024
Permit issued — General Construction
M01053550-I1-GC
05/28/2024
Permit issued — Supported Scaffold
M01053551-I1-SF
05/20/2024
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01053551-I1
05/20/2024
Filed — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BROWN STONE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01053550-I1
04/19/2024
Permit issued — General Construction
M00778920-I1-GC
01/11/2024
Permit issued — Sprinklers
M00902073-I1-EW-SP
01/02/2024
Permit issued — General Construction
M00778920-I1-MS
10/23/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC12/04/2025
DOB NOWGeneral ConstructionSigned-offM.M CONSTRUCTION & BUILDE05/28/2024
DOB NOWSupported ScaffoldSigned-offM.M CONSTRUCTION & BUILDE05/28/2024
DOB NOWGeneral ConstructionPermit IssuedQUINTUNA SERVICE CORP04/19/2024
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC01/11/2024
DOB NOWGeneral ConstructionPermit IssuedOASIS PLOMO CORP01/02/2024
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP10/11/2023
DOB NOWGeneral ConstructionPermit IssuedRICHAIR MECHANICAL INC07/28/2023
DOB NOWGeneral ConstructionPermit IssuedCHRISTIAN G'NRL CONST COR05/03/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/13/2022
DOB NOWGeneral ConstructionPermit IssuedCHRISTIAN G'NRL CONST COR09/22/2022
1 project · most recent 08/12/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedQUINTUNA SERVICE CORPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-SN36NAMHZ 36,000 BTU · Condensing Unit ×4
Heating
Mitsubishi Electric MSZ-EF09NAW 9,000 BTU · Fan Coil Indoor ×32
MSZ-EF12NAW 12,000 BTU · Fan Coil Indoor ×8
MXZ-8C48NAHZ 48,000 BTU · Condensing Unit ×4
4 projects · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025CompleteBROOKYLN SOLARWORKS, LLC—
12/06/2024CompleteBAYSIDE ELEC'L CONT. CORPGeneral Wiring
05/16/2023CompleteBAYSIDE ELEC'L CONT. CORP2 meters, 2 new_meters
10/10/2021CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
09/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/23/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/17/2026Fire-Resistant Penetrations and JointsDAVID TURNERspecial
08/17/2026Mechanical SystemsDAVID TURNERspecial
08/17/2026FinalTARIQ SIDDIQUIprogress
08/17/2026Ventilation and air distribution systemDAVID TURNERenergy_progress
08/17/2026Lighting controlsDAVID TURNERenergy_progress
08/17/2026HVAC-R and service water heating equipmentDAVID TURNERenergy_progress
08/17/2026Exterior lighting powerDAVID TURNERenergy_progress
08/17/2026HVAC-R and service water heating system controlsDAVID TURNERenergy_progress
08/17/2026HVAC-R and service water piping design and insulationDAVID TURNERenergy_progress
08/17/2026Interior lighting powerDAVID TURNERenergy_progress
08/17/2026Lighting in dwelling unitsDAVID TURNERenergy_progress
08/12/2026Ventilation and air distribution systemDAVID TURNERenergy_progress
08/12/2026Fire-Resistant Penetrations and JointsDAVID TURNERspecial
08/12/2026Mechanical SystemsDAVID TURNERspecial
08/12/2026FinalTARIQ SIDDIQUIprogress
08/12/2026Exterior lighting powerDAVID TURNERenergy_progress
08/12/2026Interior lighting powerDAVID TURNERenergy_progress
08/12/2026Lighting in dwelling unitsDAVID TURNERenergy_progress
08/12/2026Lighting controlsDAVID TURNERenergy_progress
08/12/2026HVAC-R and service water heating equipmentDAVID TURNERenergy_progress
08/12/2026HVAC-R and service water piping design and insulationDAVID TURNERenergy_progress
08/12/2026HVAC-R and service water heating system controlsDAVID TURNERenergy_progress
03/11/2026FinalNARESH MAHANGUprogress
03/11/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 43.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00778920-P1Request digital key ↗
09/02/2026M00778920-I1Request digital key ↗
09/02/2026M00778920-P4Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/10/2026123363252Open ↗
10/20/2025123903295Open ↗
05/15/2019123903295Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00778920-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature28
09/28/2026M00793344-I1Open ↗
09/25/2026M01322258-I1Open ↗
09/25/2026M01322258-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00778920-P3Open ↗
09/02/2026M00778920-P4Open ↗
09/02/2026M00778920-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/28/2026M00793344-I1Open ↗
09/25/2026M01322258-I1Open ↗
09/01/2026M00778920-P4Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/15/2019123903295Open ↗
03/30/2018123363252Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/30/2018123363252Open ↗
▸Safety & Tenant Protection17
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist10
09/02/2026M00778920-P4Open ↗
08/13/2026M00778920-P1Open ↗
08/13/2026M00778920-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWStreet Tree Checklist5
09/02/2026M00778920-P4Open ↗
08/13/2026M00778920-I1Open ↗
08/13/2026M00778920-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
06/07/2018123363252Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
09/09/2019123903295Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00778920-P3Open ↗
09/02/2026M00778920-P4Open ↗
09/02/2026M00778920-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/15/2019123903295Open ↗
03/30/2018123363252Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/15/2019123903295Open ↗
03/30/2018123363252Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/19/2020123903295Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00778920-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
03/30/2018123363252Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01322258-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/15/2019123903295Open ↗
03/30/2018123363252Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/15/2019123903295Open ↗
03/30/2018123363252Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
09/02/2026M00778920-P4Open ↗
09/02/2026M00778920-P1Open ↗
09/02/2026M00778920-I1Open ↗
Showing 3 of 5 on file for this type