DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB10/06/2021CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
DOB10/06/2021CYCLE 9B UNSAFE REPORT FILED
DOB10/06/2021CYCLE 8B UNSAFE REPORT FILED
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
HPD07/31/2014SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
DOB12/13/2011VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
DOB06/10/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
ECB07/01/200950 FULTON VT BOILER 15HP,NB64633,GAS, 1992 (50) COPPER MATERIAL AND SWEAL FIN CONSTRUCTION FOUND ON SECTIONS OF THE BOILER FEED WATER INLET HEADER. REPLACE COPPER MATERIAL WITH SCREWED BLACK PIPE FOR CODE COMPLNothing owed — awaiting certificate of correction
ECB09/28/200450A/50B 50C 1985 FULTON 46931 50A) REPAIR THE DAMAGED CASEING ON THE BOILER 50B) REVERSE THE VALVE ON THE BOTTOM BLOW DOWN LINE. 50C) WIRE IN THE MANUAL RESET FOR THE LOW WATER CUT-OFF.Nothing owed — awaiting certificate of correction
ECB09/28/200444C/50 1992 NB 64633 50 REVERSE THE VALVES ON THE BOTTOM BLOWDOWN LINENothing owed — awaiting certificate of correction