← Back
Walk-up apt, over six families with stores
355 WEST 41 STREET
MANHATTAN · BIN 1024932
💬 Discuss this project
1930Year Built
5Stories
C7Building Class
C6-4Zoning
9,045 sfGross Floor Area
17Units
Rent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 355 W 41 ST LLC · 2,469 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Floor 53p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 15p · 3 filings · 20 docs
Cellar10p · 4 filings · 20 docs
6 jobs · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023Complete5 J'S ELECTL CONTS CORPGeneral Wiring
12/08/2022Complete5 J'S ELECTL CONTS CORPGeneral Wiring
12/07/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/02/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/10/2021CancelledJOSEPH WEINSTEIN ELECTRIC—
03/26/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (167)Filed (21)Permit Issued (17)Signed Off (5)Violation (60)Inspection (10)Objection (24)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, open)
C
12/10/2025
Violation issued (HPD, open)
C
11/28/2025
Violation issued (HPD, open)
C
11/28/2025
Violation issued (HPD, open)
C
11/28/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
I
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
A
04/13/2025
Violation issued (HPD, closed)
B
04/13/2025
Violation issued (HPD, closed)
B
04/13/2025
Violation issued (HPD, closed)
B
04/01/2024
Violation issued (HPD, closed)
A
01/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2024
Special inspection requirement — Public Assembly Emergency Lighting
Michael Just
01/04/2024
Filed — No Work
M00655072-P2
01/02/2024
Special inspection requirement — Public Assembly Emergency Lighting
Michael Just
12/14/2023
Filed — Alteration CO
General construction at cellar and change of use at cellar and change in egress indicated on drawings filed herewith.
M00646694-P3
10/26/2023
Objection resolved — Addressed
10/25/2023
Objection raised — Other
10/23/2023
Filed — Alteration CO
General construction at cellar and change of use at cellar and change in egress indicated on drawings filed herewith.
M00646694-P2
09/26/2023
Signed off — Alteration
Install new Mechanical equipment & related ductwork at cellar,1st through 5th floors and roof. No change in use egress occupancy under this application
M00644065-I1
09/20/2023
Filed — Alteration
Install new Mechanical equipment & related ductwork at cellar,1st through 5th floors and roof. No change in use egress occupancy under this application
M00644065-P2
09/19/2023
Signed off — Alteration
Remove gas meters, piping,risers,& all gas fix. @ cel, 1st flr thru 5th flrs. Install 2 gas meters & 1 Hot Water Heater at cel, Install 4 res gas cook equip. @2nd flr thru 5th flrs, Install new gas risers & gas piping @ cel thru rof Install 1HVAC Unit@rof
M00643973-I1
09/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
alon egozi
09/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
alon egozi
09/14/2023
Special inspection requirement — Maintenance information
alon egozi
09/14/2023
Special inspection requirement — Final
alon egozi
09/14/2023
Special inspection requirement — Energy Code Compliance Inspections
alon egozi
09/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
09/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
alon egozi
09/14/2023
Special inspection requirement — Mechanical Systems
alon egozi
09/07/2023
Signed off — Alteration
Install new sprinkler system at cellar with new sprinkler water service & DCDA at cellar Install new siamese connection at osp. indicated on drawings filed herewith.
M00647504-I1
08/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/16/2023
Permit issued — Mechanical Systems
M00644065-I1-MS
08/16/2023
Permit issued — General Construction
M00646694-I1-GC
08/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/19/2023
Objection resolved — Addressed
07/07/2023
Objection resolved — Addressed
07/07/2023
Objection resolved — Addressed
07/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2023
Special inspection requirement — Maintenance information
alon egozi
06/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
alon egozi
06/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
alon egozi
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
alon egozi
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
alon egozi
06/23/2023
Filed — Alteration
Remove gas meters, piping,risers,& all gas fix. @ cel, 1st flr thru 5th flrs. Install 2 gas meters & 1 Hot Water Heater at cel, Install 4 res gas cook equip. @2nd flr thru 5th flrs, Install new gas risers & gas piping @ cel thru rof Install 1HVAC Unit@rof
M00643973-P3
06/21/2023
Objection resolved — Addressed
06/20/2023
Objection raised — Energy
06/20/2023
Objection raised — Scope
06/20/2023
Objection raised — Scope
06/09/2023
Filed — Alteration
Install new Mechanical equipment & related ductwork at cellar,1st through 5th floors and roof. No change in use egress occupancy under this application
M00644065-P1
06/05/2023
Objection raised — Admin
05/23/2023
Objection resolved — Addressed
05/18/2023
Objection raised — Other
Latest 60 of 167 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
355 W 41 ST6607/08/2026
MARTIN SANDERS INVESTMENTS907/08/2026
BELGIUM PROPERTIES203/22/2026
MOLLANEY3003/22/2026
BELBIUM PROPERTIES LLC103/22/2026
MOLLANY LLC103/22/2026
440 W 47 STONE LLC103/22/2026
KLARACON103/22/2026
MALLANEY LLC C/O SAND103/22/2026
OWNER OF 355 WEST 41 ST103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/18/2021$2.9M—— → —$321/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M JUST ARCHITECTURE PC1101/04/2024
RLM ENGINEERING PLLC709/20/2023
VALERIO ASSOCIATES P.C.310/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE2103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELGIUM PROPERTIES LLCGeneral Contractor1507/08/2026
KLARACON LLCGeneral Contractor307/08/2026
ALL PRO PLBG & HTG INCPlumbing307/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
5 J'S ELECTL CONTS CORPElectrical103/22/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC57851009/20/2023
BECKER ENGINEERING, PC633310/18/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBELGIUM PROPERTIES LLC08/16/2023
DOB NOWGeneral ConstructionPermit IssuedBELGIUM PROPERTIES LLC08/16/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC04/05/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC12/08/2022
DOB NOWGeneral ConstructionPermit IssuedBELGIUM PROPERTIES LLC09/01/2022
DOB NOWConstruction FenceSigned-offBELGIUM PROPERTIES LLC09/01/2022
DOB NOWMechanical SystemsSigned-offBELGIUM PROPERTIES LLC09/01/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC04/06/2022
DOB NOWGeneral ConstructionPermit IssuedBELGIUM PROPERTIES LLC04/01/2022
DOB NOWConstruction FenceSigned-offBELGIUM PROPERTIES LLC03/29/2022
DOB NOWMechanical SystemsSigned-offBELGIUM PROPERTIES LLC03/29/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC03/28/2022
DOB NOWStructuralSigned-offBELGIUM PROPERTIES LLC12/31/2021
DOB NOWStructuralSigned-offBELGIUM PROPERTIES LLC06/09/2021
DOB NOWStructuralSigned-offBELGIUM PROPERTIES LLC06/01/2021
DOB NOWStructuralSigned-offKLARACON04/07/2020
DOB NOWStructuralSigned-offKLARACON09/12/2019
BISPLISSUEDJOHNNY'S P&H CONTRAC INC08/18/2023
BISOTISSUEDBELGIUM PROPERTIES LLC01/24/2023
BISOTISSUEDBELGIUM PROPERTIES LLC01/24/2023
BISPLISSUEDALL PRO PLBG & HTG INC06/13/2022
BISOTISSUEDBELGIUM PROPERTIES LLC02/07/2022
BISOTISSUEDBELGIUM PROPERTIES LLC02/07/2022
BISMHISSUEDBELGIUM PROPERTIES LLC06/09/2021
BISOTISSUEDBELGIUM PROPERTIES LLC02/24/2021
BISOTISSUEDBELGIUM PROPERTIES LLC02/24/2021
BISOTISSUEDKLARACON LLC03/05/2020
BISMHISSUEDKLARACON LLC03/05/2020
BISOTISSUEDKLARACON LLC05/09/2019
BISMHISSUEDKLARACON LLC05/09/2019
BISOTISSUEDHERITAGE CHIMNEY SERVICE09/26/2016
BISPLISSUEDMETRO INCORPORATED08/15/2016
BISBLISSUEDMETRO INCORPORATED08/15/2016
BISBLISSUEDMETRO INCORPORATED05/26/2015
BISPLISSUEDMETRO INCORPORATED05/26/2015
BISEQISSUEDCOLGATE ENTERPRISE CORP10/16/2012
BISOTISSUEDMOLLANEY INVESTMENTS LLC04/19/2010
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION12/01/2004
BISMHISSUEDBRIZA CONSTRUCTION CO09/09/2003
BISOTISSUEDMIDTOWN MAINTENANCE & CONSULTANT01/24/2002
+ 6 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
01/08/2024Public Assembly Emergency LightingMichael Justprogress
01/02/2024Public Assembly Emergency LightingMichael Justprogress
09/14/2023HVAC-R and service water piping design and insulationalon egozienergy_progress
09/14/2023HVAC-R and service water heating system controlsalon egozienergy_progress
09/14/2023Maintenance informationalon egozienergy_progress
09/14/2023Finalalon egoziprogress
09/14/2023Energy Code Compliance Inspectionsalon egoziprogress
09/14/2023Fire-Resistant Penetrations and Jointsalon egozispecial
09/14/2023HVAC-R and service water heating equipmentalon egozienergy_progress
09/14/2023Mechanical Systemsalon egozispecial
06/29/2023Maintenance informationalon egozienergy_progress
06/29/2023HVAC-R and service water heating equipmentalon egozienergy_progress
06/29/2023HVAC-R and service water heating system controlsalon egozienergy_progress
06/29/2023HVAC-R and service water piping design and insulationalon egozienergy_progress
06/29/2023Fire-Resistant Penetrations and Jointsalon egozispecial
06/29/2023Energy Code Compliance Inspectionsalon egoziprogress
05/09/2023Sprinkler Systemsalon egozispecial
05/09/2023Post-installed Anchorsalon egozispecial
05/09/2023Fire-Resistant Penetrations and Jointsalon egozispecial
05/08/2023Public Assembly Emergency LightingMichael Justprogress
05/08/2023Post-installed Anchorsalon egozispecial
05/08/2023Sprinkler Systemsalon egozispecial
05/08/2023Fire-Resistant Penetrations and Jointsalon egozispecial
03/24/2023HVAC-R and service water heating equipmentalon egozienergy_progress
03/24/2023Fire-Resistant Penetrations and Jointsalon egozispecial
Latest 25 of 41.
▾Documents — 333 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch15
09/03/2026M00647504-I1Request digital key ↗
09/03/2026M00647504-P1Request digital key ↗
09/03/2026M00647504-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/05/2026M00201520-P1Request digital key ↗
09/05/2026M00201520-P2Request digital key ↗
08/14/2026M00201520-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/31/2026M00655072-P1Request digital key ↗
08/31/2026M00655072-P2Request digital key ↗
08/31/2026M00655072-I1Request digital key ↗
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION19
08/18/2023123669994Open ↗
05/27/2021123669994Open ↗
05/27/2021123669994Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION18
05/23/2023123669994Open ↗
12/23/2022123669994Open ↗
12/22/2022123669994Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M00201520-I1Open ↗
08/13/2026M00201520-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/05/2026M00201520-I1Open ↗
09/03/2026M00647504-I1Open ↗
09/03/2026M00647504-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/03/2026M00643973-P1Open ↗
09/03/2026M00643973-P1Open ↗
09/02/2026M00655072-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/23/2019123669994Open ↗
02/13/2019123669994Open ↗
02/13/2019123669994Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/03/2026M00643973-P1Open ↗
08/31/2026M00643973-P2Open ↗
08/27/2026M00647504-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/07/2015122235492Open ↗
10/18/2012121335000Open ↗
03/31/2010120308988Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/23/2016140542599Open ↗
01/07/2015122235492Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/18/2012121335000Open ↗
03/31/2010120308988Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/23/2016140542599Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/23/2016140542599Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
04/03/2017122235492Open ↗
01/14/2016122235492Open ↗
07/21/2015122235492Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
12/23/2022123669994Open ↗
12/22/2022123669994Open ↗
01/10/2022123669994Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/13/2019123669994Open ↗
07/21/2015122235492Open ↗
07/17/2015122235492Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection39
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist19
09/03/2026M00644065-I1Open ↗
09/03/2026M00644065-P2Open ↗
09/03/2026M00643973-P3Open ↗
Showing 3 of 19 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON4
04/09/2019123669994Open ↗
05/15/2015122235492Open ↗
09/14/2012121343199Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/28/2026M00646694-P3Open ↗
08/15/2026M00646694-P1Open ↗
08/15/2026M00646694-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
07/07/2021123669994Open ↗
09/23/2016140542599Open ↗
04/09/2019123669994Open ↗
▸DOB NOWCertificate of No Harassment2
08/13/2026M00201520-I1Open ↗
08/13/2026M00201520-I1Open ↗
▸DOB NOWTenant Protection Plan2
08/14/2026M00201520-I1Open ↗
08/13/2026M00201520-P1Open ↗
▸BISSTREET TREE CHECKLIST1
03/31/2010120308988Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/21/2021123669994Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026M00646694-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026M00646694-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026M00646694-I1Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026M00647504-I1Open ↗
09/03/2026M00647504-P1Open ↗
09/03/2026M00647504-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWOER: Notice to Proceed6
09/03/2026M00644065-I1Open ↗
09/03/2026M00643973-I1Open ↗
08/15/2026M00646694-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/16/2021123669994Open ↗
02/13/2019123669994Open ↗
09/23/2016140542599Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
09/03/2026M00644065-I1Open ↗
08/13/2026M00647504-I1Open ↗
08/13/2026M00646694-P2Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/31/2010120308988Open ↗
03/31/2010120308988Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
02/28/2019123669994Open ↗
09/23/2016140542599Open ↗
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/23/2019123669994Open ↗
02/13/2019123669994Open ↗
07/14/2017122235492Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/30/2023123669994Open ↗
08/30/2023123669994Open ↗
02/21/2023123669994Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/14/2017122235492Open ↗
03/28/2017140542599Open ↗
▸BISLIGHTING IN DWELLING UNITS2
09/05/2023123669994Open ↗
09/05/2023123669994Open ↗
▸BISEXTERIOR LIGHTING POWER2
09/05/2023123669994Open ↗
09/05/2023123669994Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/03/2026M00644065-I1Open ↗
09/03/2026M00643973-I1Open ↗
▸BISFENESTRATION AREAS1
09/05/2023123669994Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/05/2023123669994Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/05/2023123669994Open ↗
▸BISLIGHTING CONTROLS1
09/05/2023123669994Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/05/2023123669994Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2016140542599Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/05/2023123669994Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/05/2023123669994Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00644065-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/21/2023123669994Open ↗
01/04/2023123669994Open ↗
01/04/2023123669994Open ↗
Showing 3 of 7 on file for this type
▸BISFOOTING AND FOUNDATION INSPECTION1
09/05/2023123669994Open ↗
▸BISMASONRY1
09/05/2023123669994Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/05/2023123669994Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/05/2023123669994Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
09/05/2023123669994Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/05/2023123669994Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/05/2023123669994Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/05/2023123669994Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/16/2021123669994Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/16/2021123669994Open ↗
▸BISMECHANICAL SYSTEMS1
09/05/2023123669994Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/16/2021123669994Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/13/2019123669994Open ↗
07/14/2017122235492Open ↗
03/28/2017140542599Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
09/07/2023123669994Open ↗
07/14/2017122235492Open ↗
03/28/2017140542599Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/18/2012121335000Open ↗
03/31/2010120308988Open ↗
▸BISSUPERSEDING LETTER2
08/18/2023123669994Open ↗
02/25/2021123669994Open ↗
▸BISFINAL1
09/05/2023123669994Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
02/13/2019123669994Open ↗
02/13/2019123669994Open ↗
07/14/2017122235492Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/05/2023123669994Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
06/16/2023123669994Open ↗
02/21/2023123669994Open ↗
01/14/2022123669994Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET6
02/13/2019123669994Open ↗
02/13/2019123669994Open ↗
01/12/2015122235492Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/23/2016140542599Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00644065-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/28/2026M00646694-P3Open ↗
08/15/2026M00646694-P1Open ↗
08/15/2026M00646694-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSHUTOFF DAMPERS2
09/05/2023123669994Open ↗
09/05/2023123669994Open ↗
▸DOB NOWStructural Peer Review Report2
08/14/2026M00201520-I1Open ↗
08/13/2026M00201520-P1Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/05/2023123669994Open ↗