← Back
Three families
3552 PALMER AVENUE
BRONX · BIN 2090256
💬 Discuss this project
1989Year Built
3Stories
C0Building Class
R4Zoning
2,252 sfGross Floor Area
3Units
Rent Stabilized5 Open Violations 0 unresolved · 5 paperwork only ▸
Three families · 4,126 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DANNIE REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2017$734K—Private party → DANNIE REALTY, LLC$326/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129207/08/2026
Building Lifecycle
All (24)Filed (2)Violation (16)Objection (4)Special Inspection (2)
07/19/2026
Objection resolved — Addressed
07/19/2026
Objection resolved — Addressed
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/08/2026
Filed — Alteration
RESTORE CELLAR TO THE PREVIOUS LEGAL CONDITION AS PER THE PLANS FILED HEREWITH TO REMOVE ECB VIOLATION #39193162J, 63L & 64N. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01427474-I1
07/08/2026
Filed — Alteration
RESTORE CELLAR TO THE PREVIOUS LEGAL CONDITION AS PER THE PLANS FILED HEREWITH TO REMOVE ECB VIOLATION #39193162J, 63L & 64N. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01427474-S1
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/18/2026
Violation issued (ECB, open)
Unknown
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
06/18/2026
Violation issued (ECB, open)
Construction
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
07/29/2019
Violation issued (ECB, closed)
Construction
02/06/1997
Violation issued (HPD, closed)
B
02/06/1997
Violation issued (HPD, closed)
A
02/06/1997
Violation issued (HPD, closed)
B
Nothing on file for this building.
1 project · most recent 07/08/2026
Water/Sanitary
FiledStatusContractorScope
07/08/2026——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/07/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/07/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026X01427474-I1Request digital key ↗
08/15/2026X01427474-S1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026X01427474-I1Open ↗
08/16/2026X01427474-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026X01427474-S1Open ↗
08/28/2026X01427474-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026X01427474-I1Open ↗
08/15/2026X01427474-S1Open ↗