← Back
Two family brick
3553 ROCHAMBEAU AVENUE
BRONX · BIN 2017828
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R7-1Zoning
2,840 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸
Two family brick · Owner of record: 3533 ROCHAM LLC · 2,259 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 236p · 1 filing · 20 docs
Floor 139p · 1 filing · 20 docs
Basement41p · 1 filing · 20 docs
1 job · most recent 06/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Signed-offAB BUILDERS NYHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FTXF18AXVJU 18,000 BTU · Fan Coil Indoor ×7
RXF18AXVJU 18,100 BTU · Condensing Unit ×7
FTXF24AXVJU 21,000 BTU · Fan Coil Indoor ×3
RXF24AXVJU 22,400 BTU · Condensing Unit ×3
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×10
QTXE110150DC 100 CFM · Exhaust Fan ×10
1 job · most recent 06/03/2026
Sprinkler System
FiledStatusContractorScope
06/03/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 06/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/03/2026Signed-offA. M. PLUMBING COMPANYStorm, Water/Sanitary
3 jobs · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
08/26/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
05/06/2025CompletePOWER DIRECT ELECTRIC INC—
1 job · most recent 06/03/2026
Steel
FiledStatusContractorScope
06/03/2026Signed-offAB BUILDERS NYSteel
Building Lifecycle
All (77)Filed (8)Permit Issued (7)Signed Off (4)Violation (7)Inspection (7)Objection (14)Special Inspection (30)
07/27/2026
Objection resolved — Open
06/26/2026
Objection raised — Scope
06/03/2026
Filed — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-P3
03/07/2026
Violation issued (HPD, open)
C
02/26/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/19/2026
Signed off — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-S7
01/18/2026
Signed off — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-S5
01/14/2026
Permit issued — Structural
X00877321-S7-ST
01/05/2026
Filed — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-S7
12/30/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
12/30/2025
Special inspection requirement — Final
Shahrish Shuvo
12/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/30/2025
Special inspection requirement — Structural Cold-Formed Steel
Shahrish Shuvo
12/02/2025
Signed off — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-S6
11/26/2025
Signed off — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-S4
11/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2025
Permit issued — Sprinklers
X00877321-S5-EW-SP
11/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/25/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/25/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/25/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/25/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
07/25/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/25/2025
Special inspection requirement — Metering
Shahrish Shuvo
07/25/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Zoning
07/17/2025
Objection raised — Fire_Protection
07/15/2025
Filed — Alteration CO
Filing Sprinkler Drawings subsequent to primary job number X00877321-I1
X00877321-P2
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/14/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/14/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/14/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/14/2025
Special inspection requirement — Metering
Shahrish Shuvo
07/14/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/14/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/14/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
06/27/2025
Permit issued — General Construction
X00877321-I1-GC
05/27/2025
Permit issued — Plumbing
X00877321-S4-MS
05/27/2025
Permit issued — Plumbing
X00877321-S6-PL
05/21/2025
Objection resolved — Addressed
05/19/2025
Violation issued (ECB, closed)
Unknown
05/19/2025
Violation issued (ECB, closed)
Construction
05/19/2025
Violation issued (ECB, closed)
Site Safety
05/16/2025
Violation issued (ECB, closed)
Construction
05/16/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/08/2025
Permit issued — Sprinklers
X00877321-S5-EW-SP
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAGAD REALTY2509/02/2026
3533 ROCHAM LLC203/22/2026
AB BUILDERS NY203/22/2026
3553 REALTY CORP CHERYL S103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2025$950K—3553 REALTY CORP → 3533 ROCHAM LLC$335/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZSK ARCHITECTS PC406/03/2026
AG ENGINEERING PLLC101/05/2026
VASILIOS ARTEMIOU PE305/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MABE GROUP INCGeneral Contractor607/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
A M B MECHANICALPlumbing103/22/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524806/03/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAB BUILDERS NY01/14/2026
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/20/2025
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY06/27/2025
DOB NOWPlumbingSigned-offAB BUILDERS NY05/27/2025
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY05/27/2025
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP05/08/2025
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY04/22/2025
BIS—ISSUEDNATIVO GENERAL CONTRACTION02/20/2004
BIS—ISSUEDNATIVO GENERAL CONTRACTION01/31/2003
BISPLISSUEDLAFATA CORALLO P & H INC01/02/2002
BIS—ISSUEDNATIVO GENERAL CONTRACTION11/28/2001
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/26/2026Fail-Final CND-Occupancy InspectionFailView ↗
11/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
12/30/2025Structural Steel - DetailsShahrish Shuvospecial
12/30/2025FinalShahrish Shuvoprogress
12/30/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/30/2025Structural Cold-Formed SteelShahrish Shuvospecial
07/25/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
07/25/2025Fenestration air leakageShahrish Shuvoenergy_progress
07/25/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
07/25/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
07/25/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/25/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/25/2025Fenestration areasShahrish Shuvoenergy_progress
07/25/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
07/25/2025Interior lighting powerShahrish Shuvoenergy_progress
07/25/2025MeteringShahrish Shuvoenergy_progress
07/25/2025Maintenance informationShahrish Shuvoenergy_progress
07/14/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/14/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/14/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
07/14/2025Fenestration air leakageShahrish Shuvoenergy_progress
07/14/2025Interior lighting powerShahrish Shuvoenergy_progress
07/14/2025Maintenance informationShahrish Shuvoenergy_progress
07/14/2025MeteringShahrish Shuvoenergy_progress
07/14/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
07/14/2025Fenestration areasShahrish Shuvoenergy_progress
07/14/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
Latest 25 of 43.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/16/2026X00877321-P2Request digital key ↗
08/16/2026X00877321-S4Request digital key ↗
08/16/2026X00877321-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026X00877321-S4Open ↗
08/29/2026X00877321-S4Open ↗
08/29/2026X00877321-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026X00877321-P3Open ↗
08/13/2026X00877321-S7Open ↗
08/13/2026X00877321-S6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026X00877321-S4Open ↗
08/29/2026X00877321-P2Open ↗
08/25/2026X00877321-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/15/2026X00877321-P3Open ↗
08/13/2026X00877321-P2Open ↗
08/13/2026X00877321-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/15/2026X00877321-P3Open ↗
08/13/2026X00877321-P2Open ↗
08/13/2026X00877321-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/16/2026X00877321-I1Open ↗